| 1 | Carriage of following material from store center Meerut to site of work including loading & unloading at both ends maximum distance up to 40 Km. :- |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | ST Pole 11 Mtr. Long. |
| 4 | Line material such as 11 KV Cross Arms, 11 kv pin insulator, 11 kv pin, 11 kv disc insulator with fitting, stay rod, stay wire, LT AB cable (3x120) sq.mm/(3x95) sq.mm, ACSR weasal conductor, ACSR dog conductor, GI wire, MS Angle, iron and MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc. |
| 5 | Distribution box single phase/three phase (3+3) |
| 6 | Erection of PCC pole 8.5 Mtr long/STP Pole 11 mtr long with grouting after digging a pit of size 1.6 mtr deep in all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 7 | Fabrication and fixing of all 11 KV/LT line accessories |
| 8 | Erection of Double pole on PCC pole 11 mtr after digging a pitt of size 1.6 mtr. Deep in all type of soil for each pole including back filling of the pole with proper ramming after completion of work. |
| 9 | Fabrication and fixingof MS angle and MS channel, fixing all 11 kv accessories TPMO, Fuse set 11 kv pin insulators on Double pole |
| 10 | Erection of stay set complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 11 | Laying, lifting, stringing & proper sagging of Old ACSR weasel conductor for 3 phase 3 wire 11 kv line including binding & jumpering properly |
| 12 | Laying of LT AB Cable of various size including fixing of all LT AB Cable accessories on suport |
| 13 | Fixing of distribution box including fixing the cable from transformer and consumer service cable |
| 14 | Earthingh of each 11 KV line pole & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. |
| 15 | Guarding of line with G.I. wire having 2 no. horizontal wire & 3 Mtr distance odf laces of ten 6 SWG/8 SWG G.I. wire complete work in all respect |
| 16 | Open & resagging of existing 11 kv line/LT line |
| 17 | Dismentling of STP pole/R.S Joist by digging the pits & removal of complete 11 KV/LT line accessories |
| 18 | Straighting Tilted pole due to storm & resagging of conductor/cable after opening the binding and making properly |
| 19 | Providing and fixing of stay clamps |
| 20 | Providing and fixing of holding clamps. |
| 21 | Providing and fixing of Cross arm holding clamp |
| 22 | Providing and fixing of Holding Clamp |
| 23 | Providing and fixing of MS Nut & Bolts |
| 24 | Cuttoing & chopping tree branches near side of line for making the clearance between line and tree |
| 25 | Back cartageST pole/R.S Joist from work site central to Store Meerut LS |