| 1 | Providing & complete repairing, replacing burnet equipment for 15,20,25 HP starter Delta panel & 120 HP ATS Panel with 8 set starter & power supply wiring i/c the following works |
| 2 | Labor charge for complete repairing of 15,20,25 HP starter Delta panel & 120 HP ATS Panel with 8 starter complete repair, replacement of tripping system changing of conctact & burnet equipment replacement with complete power, control wiring of panel starter i/c trail & testing at site on load. |
| 3 | Providing for complete replacing 200/300 amper , 415 volt 50Hz moulded case circuit breaker (MCCB) of any standard make for main power supplyequipment. |
| 4 | Providing & fixing of ML-12 contactor |
| 5 | Providing & fixing of ML-4 contactor |
| 6 | Providing & fixing of indication lamp |
| 7 | Providing & fixing of relay unit range 28-120 amp. |
| 8 | Providing & fixing of ML-2 contactor |
| 9 | Providing & fixing of ML-1.5 contactor |
| 10 | Providing & fixing of on/off switch |
| 11 | Providing & fixing of timer assembly |
| 12 | Providing & fixing of 63 amp. MCB, 415 v., 50 hz., 4 Pole for star delta starter/panel |
| 13 | Providing & fixing of 63 amp. MCCB, 415 v., 50 hz., for star delta starter |
| 14 | Taking out of auto transformer coil set dismantling replacing & re-insulation of coil set and refitting and seating as required. |
| 15 | E.H.V. transformer oil for auto transformer starter. |
| 16 | Providing & fixing of incoming & outgoing fiber connection terminal plate with complete copper nut bolt & wiser. |
| 17 | Complete overhauling of panel & starter for using power circuit wiring & control circuit wiring as per required wire & lugs etc. trail & testing on load complete |
| 18 | Loading & unloading complete job repairing for site to work shop & work shop to site. |
| 19 | Taking out of auto transformer coil set dismantling replacing & re-insulation of coil set and refitting and seating as required. |
| 20 | E.H.V. transformer oil for auto transformer starter. |
| 21 | Providing & fixing of incoming & outgoing fiber connection terminal plate with complete copper nut bolt & wiser. |
| 22 | Complete overhauling of panel & starter for using power circuit wiring & control circuit wiring as per required wire & lugs etc. trail & testing on load complete |
| 23 | Loading & unloading complete job repairing for site to work shop & work shop to site. |
| 24 | Providing and fully riwinding of ATS both coil set i/c dismantiling of ATS coil stamping after fitting fully varnishing, taping and setting of appearing range of connection trail testing on full load at site. |
| 25 | Providing & fixing of ampier meter 0-150 amp. |
| 26 | Providing & fixing of volte meter 0-500 v. |
| 27 | Providing & fixing of current transformer. (CT) range 100-200/5 amp. for majouring of main panel ampier |
| 28 | Provding & fixing of heavy duty capacitor 440 v. 7.5 KVAR capacitor with complete as per required work. |
| 29 | Providing & fixing of 16 sq. mm. 3 core copper flat cable hardware material. |