Tender For Boiler Tubes Fabrication And Erection Work Year 2024-25, 1 Boiler Tubes Fabrication & Erection Work 2 Dis., Fab. & Ere. Of Drum To Drum Tube (63.5 Mm Od) As Per Drawing/Sample For 30 Tph Boiler 3 Dismantling, Fabrication & Erection Of Scr
Tender Overview
Project Description
Tender For Boiler Tubes Fabrication And Erection Work Year 2024-25, 1 Boiler Tubes Fabrication & Erection Work 2 Dis., Fab. & Ere. Of Drum To Drum Tube ( 63.5 Mm Od ) As Per Drawing / Sample For 30 Tph Boiler 3 Dismantling, Fabrication & Erection Of Screen Tube 70Mm Od As Per Drawing / Sample For 20 Tph Boiler 4 Dis. Fab., Ere. Of Sidewall Tube ( 70Mm Od ) As Per Drawing / Sample For 20 Tph Boiler. 5 Dis. Fab. Ere. Of Roof Tube ( 70Mm Od ) As Per Drawing / Sample For 20 Tph Boiler. 6 Dis. Fab. Ere. Of 76.2Mm Od Top Generation Tubes For 20 Tph Boiler. 7 Dis., Fab. & Ere. Of Drum To Drum Tube ( 63.5 Mm Od ) As Per Drawing / Sample For 20 Tph Boiler. 8 Dis. Fab. Erection Of Air Heater Tube 63.5 Mm Od For 20 Ton Boiler 9 Supply, Dis., Fab.& Ere. Of Nipples 76.2 Mm Od X 8 Swg X 200 Mm Long 10 Supply, Dis., Fab.& Ere. Of Nipples 70 Mm Od X 8 Swg X 200 Mm Long 11 Supply, Dis., Fab.& Ere. Of Nipples 63.5 Mm Od X 8 Swg X 200 Mm Long 12 Supply, Dis., Fab.& Ere. Of Nipples 44.45 Mm Od X 8Swg X 200 Mm Long 13 Fab. Of Economizer Tube 101.6 Mm Od Gilled Fins Type As Per Sample / Drawing Of 20 Ton Boiler 14 Dis. Fab. Erection Of Air Heater Tube 63.5 Mm Od For 30 Ton Boiler 15 Dismantling, Fabrication & Erection Of Screen Tube 70Mm Od As Per Drawing / Sample For 30 Tph Boiler 16 Dis. Fab. Ere. Of 76.2Mm Od Top Generation Tubes For 30 Tph Boiler. 17 Dis. Fab., Ere. Of Sidewall Tube ( 76.2Mm Od ) As Per Drawing / Sample For 30 Tph Boiler. 18 Dis. Fab., Ere. Of Front Header Of 30Tph Boiler As Per Drg. / Sample. 19 Fab. & Supply Of Front Header. 20 Dis. Fab., Ere. Of Economizer Tube Of 30 Ton Boiler. 21 Steam Separator Jali ( Perforated ) Size-Width-370Mm, Length-6Mtr., Thickness-3Mm, As Per Sample 22 Supporting Spring For Boiler, As Per Sample 23 Dismantling, Fabrication & Erection Of Economiser Coil38.10Mm Od X 3.66Mm, As Per Drawing / Sample For 30 Tph Boiler 24 Dis. Fab. Erection Of 44.45Mm Od X 4.06Mm Thick Super Heater Coil For Boiler No. 4 25 Dis. Fab. Erection Of 76.2Mm Od Relief Tube For Boiler No. 4 26 Dis. Fab. Erection Of 76.2Mm Od Relief Tube For Boiler No. 5 & 6 27 Dis. Fab. Erection Of Diff. Size Live Steam Line 28 Fabrication Of Gild Type Economizer Tube 101.6Mm Od, For 20 Tph Boiler 29 Dis / Fab. Erection Of Live Steam Line ( Seamless Short Bend ) Size 1½” Dia 30 Dis / Fab. Erection Of Live Steam Line ( Seamless Short Bend ) Size 4” Dia 31 Dis / Fab. Erection Of Live Steam Line ( Seamless Long Bend ) Size 2” Dia 32 Dis / Fab. Erection Of Live Steam Line ( Seamless Long Bend ) Size 3” Dia 33 Dis / Fab. Erection Of Live Steam Line ( Seamless Long Bend ) Size 6” Dia 34 Dis / Fab. Erection Of Live Steam Line ( Seamless Long Bend ) Size 8” Dia 35 Dismantling & Erection Of 38.1Mm Od Economizer Coil With Hydraulic Testing
BOQ
| Sl. No. | Item Description |
| 1 | BOILER TUBES FABRICATION & ERECTION WORK |
| 2 | Dis., Fab. & Ere. of Drum to drum tube (63.5 mm OD) as per drawing/sample for 30 TPH Boiler |
| 3 | Dismantling, Fabrication & Erection of Screen Tube 70mm OD as per drawing/sample for 20 TPH Boiler |
| 4 | Dis. Fab., Ere. Of Sidewall tube (70mm OD) as per drawing/sample for 20 TPH Boiler. |
| 5 | Dis. Fab. Ere. Of Roof tube (70mm OD) as per drawing/sample for 20 TPH Boiler. |
| 6 | Dis. Fab. Ere. Of 76.2mm OD Top generation Tubes for 20 TPH Boiler. |
| 7 | Dis., Fab. & Ere. of Drum to drum tube (63.5 mm OD) as per drawing/sample for 20 TPH Boiler. |
| 8 | Dis. Fab. Erection of Air Heater Tube 63.5 mm OD for 20 Ton Boiler |
| 9 | Supply, Dis., Fab.& Ere. Of Nipples 76.2 mm OD x 8 SWG x 200 mm long |
| 10 | Supply, Dis., Fab.& Ere. Of Nipples 70 mm OD x 8 SWG x 200 mm long |
| 11 | Supply, Dis., Fab.& Ere. Of Nipples 63.5 mm OD x 8 SWG x 200 mm long |
| 12 | Supply, Dis., Fab.& Ere. Of Nipples 44.45 mm OD x 8SWG x 200 mm long |
| 13 | Fab. Of Economizer tube 101.6 mm OD gilled fins type as per sample/drawing of 20 Ton Boiler |
| 14 | Dis. Fab. Erection of Air Heater Tube 63.5 mm OD for 30 Ton Boiler |
| 15 | Dismantling, Fabrication & Erection of Screen Tube 70mm OD as per drawing/sample for 30 TPH Boiler |
| 16 | Dis. Fab. Ere. Of 76.2mm OD Top generation Tubes for 30 TPH Boiler. |
| 17 | Dis. Fab., Ere. Of Sidewall tube (76.2mm OD) as per drawing/sample for 30 TPH Boiler. |
| 18 | Dis. Fab., Ere. Of Front Header of 30TPH Boiler as per Drg./Sample. |
| 19 | Fab. & Supply Of Front Header. |
| 20 | Dis. Fab., Ere. Of Economizer tube of 30 Ton Boiler. |
| 21 | Steam Separator Jali (Perforated) size-Width-370mm, Length-6Mtr., Thickness-3mm, as per sample |
| 22 | Supporting Spring for Boiler, as per sample |
| 23 | Dismantling, Fabrication & Erection of Economiser Coil38.10mm OD X 3.66mm, as per drawing/sample for 30 TPH Boiler |
| 24 | Dis. Fab. Erection of 44.45mm OD X 4.06mm thick Super Heater Coil for Boiler No. 4 |
| 25 | Dis. Fab. Erection of 76.2mm OD relief Tube for Boiler No. 4 |
| 26 | Dis. Fab. Erection of 76.2mm OD relief Tube for Boiler No. 5 & 6 |
| 27 | Dis. Fab. Erection of diff. size Live Steam Line |
| 28 | Fabrication of Gild Type Economizer Tube 101.6mm OD, for 20 TPH Boiler |
| 29 | Dis/ Fab. Erection of Live Steam Line (Seamless short Bend) size 1½” Dia |
| 30 | Dis/ Fab. Erection of Live Steam Line (Seamless short Bend) size 4” Dia |
| 31 | Dis/ Fab. Erection of Live Steam Line (Seamless Long Bend) size 2” Dia |
| 32 | Dis/ Fab. Erection of Live Steam Line (Seamless Long Bend) size 3” Dia |
| 33 | Dis/ Fab. Erection of Live Steam Line (Seamless Long Bend) size 6” Dia |
| 34 | Dis/ Fab. Erection of Live Steam Line (Seamless Long Bend) size 8” Dia |
| 35 | Dismantling & Erection of 38.1mm OD Economizer Coil with Hydraulic Testing |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.