}

Tender For Repair / Maintenance Of Centrifugal Pump Sets, Monoblock Pump Sets, Submersible Pump Sets And Connected Items And Repair / Maint Of Gi / Ci / Di / Ms / Hdpe Pipe Line Of Different Capacity In Zone B And C Under Age E / M-I Of Ge Dehradun., dehradun-Uttarakhand

Military Engineer Services-MES has published Tender For Repair / Maintenance Of Centrifugal Pump Sets, Monoblock Pump Sets, Submersible Pump Sets And Connected Items And Repair / Maint Of Gi / Ci / Di / Ms / Hdpe Pipe Line Of Different Capacity In Zone B And C Under Age E / M-I Of Ge Dehradun.. Submission Date for this Tender is 31-05-2024. HDPE Pipe Tenders in dehradun Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

43348311
Tender For Repair / Maintenance Of Centrifugal Pump Sets, Monoblock Pump Sets, Submersible Pump Sets And Connected Items And Repair / Maint Of Gi / Ci / Di / Ms / Hdpe Pipe Line Of Different Capacity In Zone B And C Under Age E / M-I Of Ge Dehradun.
Open Tender
Indian
Uttarakhand
dehradun
31-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Repair / Maintenance Of Centrifugal Pump Sets, Monoblock Pump Sets, Submersible Pump Sets And Connected Items And Repair / Maint Of Gi / Ci / Di / Ms / Hdpe Pipe Line Of Different Capacity In Zone B And C Under Age E / M-I Of Ge Dehradun.

Key Value

Document Fees
INR 500 /-
EMD
INR 99600.0 /-
Tender Value
INR 49.80 Lakhs /-

Attachment

FileName File Description File Size
991edb95-ddb4-41c9-abcf-bd5a807cd9e2.html Tender Notice 0 KB
8769Tenderdocuments.pdf Tender Document 0 KB
BOQ_731160.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work:- Repair/maint of centrifugal pump sets, Monoblock pump sets, submersible pump sets and connected items and repair /maint of GI/CI/DI/MS/HDPE pipe line of different capacity in Zone B & C under AGE E/M-I of GE Dehradun
Sl. No. Item Description
1Material and labour for restoration of water supply by identifying and rectifying the water supply leakage repair work, at any location, in any type of leakage i.e. 15mm/ 20mm/25mmof GI/PPR pipes with any type of joints i.e. flanged, socketed,welding joint, including required fittings such as socket/ union/ long screw/ nipple, by cutting/ threading as required at site and as directed. Earth work (if required) will be measured in the quoted rate of this item. Note :(i)Any material required for leak repair deemed to be included in the above quoted rate. (ii) Any length of pipe required shall be paid sepertately under relevant item.
2Material and labour for resoration of water supply by identifying and rectifying the water supply leakage repair work, at any location, in any type of leakage i.e. 40mm / 50mm/ 80mmpipe line of CI/ GI/DI/MS/HDPE with any type of joints i.e. flanged, socketed, tyton rubber ring,D Joint, welding or lead jointincluding required fittings such as socket/ union/ long screw/ nipple, and clamp with nut bolt required size by cutting/ threading as required at site , chocking of lead with spun yarn or providing new gasket / rubber ring/ nut bolts/ required welding work as per site requirement complete all as specified and as directed. Earth work (if required) will be measured in the quoted rate of this item.If water is continue flowing in that water pipe line at the location of leakage, the contractor is fully responsible to arrest the water leakage in that situation also in all respect. Note : (i) Any material required for leak repair deemed to be included in the above quoted rate.(ii) Any length of pipe required shall be paid sepertately under relevant item.
3All as per item No 2 here in above but of size 100mm to 150mm pipes complete all as specified and directed.
4All as per item No 2 here in above but of size .200mm to 250mm pipescomplete all as specified and directed.
5All as per item No 2 here in above but of size 300mm pipescomplete all as specified and directed.
6Material and labour for attending complaints for pumping set/submersible pump set / LT Panel/starter panel/ DG Set / AMF Panel/Dozing system any type including replacement of defective spare parts and fill the gland packing (if required) checking of all nut bolts and tightening of all nut bolts if found loose, all electrical and mechanical connections, all parameters i.e. pressure, current & voltage ratings, leakage of water, sound of bearing, checking of alignment of motor pump set complete, all as specified and directed. Greasing shall be done with grease gun. Rate of grease, nut bolt, washer shall be included in quoted rate of this item. Note :- Complaints attended in one dayshall deemed to be in one complaint. Note :- Minimum 01 technician and 01 helper to be provided by contractor to attend the complaints
7Material and labour for excavation in trenches in any type of soil not exceeding 1.5 Meter wide and not exceeding 1.5 Meter deep in any type of soil including cutting in slopes etc for laying of pipe line including getting out, complete all as specified and directed.
8Material and labour for returning, filling in, including spreading, leveling, watering and well ramming in layers in soft / loose soilnot exceeding 25 cm in each layer complete all as specified and directed by Engineer-in-Charge.
9Material and labour for removal of excavated material (Soil) to a distance up to 50 Meter from starting point and depositing where directed at level not exceeding 1.5 Meter above as directed by Engineer-in-Charge.
10Dismandling and taking out the existing corroded / scaled GI/ PPR/ PALP pipe with fittings connectionsfrom trenches, walls, ceiling or floor andremoval from site or disposed off for the following sizes complete all as specifed and directed.Note: Excavation and earth work shall be measured and paid seperately under respective item of schedule "A"
1115 mm bore
1220 mm bore
1325 mm bore
1440 mm bore
1550 mm bore
1680 mm bore
17100 mm bore
18Refixing old steel tubing and connections in new or old position (Walls, ceiling,floors, etc. complete all as specified and directed.
1915 mm bore
2020 mm bore
2125 mm bore
2240 mm bore
2350 mm bore
24Supply, Laying, fixing & testing galvanished iron watertubing "medium grade; ISI marked with and inclduing all GI fittings such as flanges, unions reducers sockets, socket reducingbends , elbows, tee, checkneuts, caps, plugs etc laid in trenches for the following sizes complete all as specifed and directed. Note: Excavation and earth work shall be measuered and paid seperately under respectiveitem of schedule "A"Make : TATA/Jindal/Prakash
2520 mm bore
2625 mm bore
2740 mm bore
2850 mm bore
2980 mm bore
30Supply, Laying, fixing & testing galvanished iron watertubing "medium grade; 20 mm bore ISI marked with and inclduing all GI fittings such as flanges, unions reducers sockets, socket reducingbends , elbows, tee, checkneuts, caps, plugs etc fixed to wall, lain in floors for the following sizes complete all as specifed and directed. Make: TATA/Prakash/Jindal
31Laying & fixing only galvanished iron watertubing "medium grade size of 25mm boreand inclduing all GI fittings such as flanges, unions reducers sockets, socket reducingbends , elbows, tee, checkneuts, caps, plugs etc laid in trenches for the following sizes complete all as specifed and directed. Note: Excavation and earth work shall be measuered and paid seperately under respectiveitem of schedule "A" and GI Pipe supply under Sch "B)"
32All as per item No14 here inabove but 40mm bore complete all as specified and directed.
33All as per item No14 here inabove but50mm bore complete all as specified and directed.
34All as per item No14 here inabove but100mm bore complete all as specified and directed.
35Dismantling/taking out defective Gun metal gate valve and Supply and fixfor Gun metal gate valve with iron wheel head by screwing/cutting of existing pipe lines for the following size complete all as specifed and directed. Make : Kartar/Seiko/BIR
3620 mm bore
3725 mm bore
3840 mm bore
3950 mm bore
40Taking out for sluice valves of size 80 mm bore for refacing, regrinding, fixing rubber packing and make the valve serviceable , leak proof and refixing during repair of existing sluice valve contractor shall be responsible for fix the end plug of same dai with the existing pipe to step the flowing the watercomplete all as specified.
41All as per item No19 here inabove but 100 mm bore complete all as specified and directed.
42All as per item No 19 here inabove but 150 mm bore complete all as specified and directed.
43All as per item No 19 here inabove but 200 mm bore complete all as specified and directed.
44All as per item No 19 here inabove but 250 mm bore complete all as specified and directed.
45All as per item No 19 hereinabove but 300 mm bore complete all as specified and directed.
46Material and labour for any type of structural steel sections , MS flanges, nut- bolt, washers, sheets, back plate, xpm mesh, wire mesh,bending, cutting in shape, welding, drilling holes, flanges including painting with two coats of synthetic enamel paint over a coat of red oxide complete all as specified and directed.
47Material and labour for fixing of clamps MS of size 300 mm dia,150 mm width, 4 mm thickness incl nuts,bolts washerscomplete all as specified and directed.
48Material and labour for fixing of clamps MS of size 250 mm to 200 dia, & 150 mm width, 4 mm thickness incl nuts,bolts washerscomplete all as specified and directed.
49Material and labour for fixing of clamps MS of size 150 mm dia,200 mm width, 4 mm thickness incl nuts,bolts washerscomplete all as specified and directed.
50Material and labour for fixing of clamps MS of size 150 mm dia,150mm width, 4 mm thickness incl nuts,bolts washerscomplete all as specified and directed.
51Material and labour for fixing of clamps MS of size 100 mm dia,150 mm width, 4 mm thickness incl nuts,bolts washers complete all as specified and directed.
52Material and labour for fixing of clamps MS of size 80 mm dia,150 mm width, 4 mm thicknessincl nuts,bolts washers complete all as specified and directed.
53Supply and fixin replacement cast iron "Mechanical joint set complete of two flanged collar one no sleeve two nos rubber "O" ring and nut bolts washers of suitable size for 300mm bore CI/DI pipe complete including necessary cutting, grinding work to fix in pipe as directed. (Note:- Earth work required to clear the pipe shall be measured and paid separately)
54All as per item No 32 here-in-above but of size250 mm borecomplete all as specified and directed.
55All as per item No 32 here-in-above but of size200 mm borecomplete all as specified and directed.
56All as per item No 32 here-in-abovebut of size150 mm borecomplete all as specified and directed.
57All as per item No 32 here-in-above but of size100 mm borecomplete all as specified and directed.
58All as per item No 32 here-in-above but of size80 mm borecomplete all as specified and directed.
59Material and labour for CI/DI fittingfor spigot & socket end pipes such as Bends (any type, radius and angle), Tapers any type (Straight, bend, increasing, decreasing or double socket etc), Tee pieces single branch, `Y` junction, double branch, cross (all sockets or socket and spigot) collars, caps and plugs andmechanicaljoints any type etc upto 150 mm bore including removing/ dismantling of old CI fittings complete all as specified and directed.
60All as per item No 38 here-in-above but of size200 mm to 300 mm borecomplete all as specified and directed.
61Cutting ofcast iron pipe mains 150 mm bore for insertion of tees, collars, sluice valves, etc including dewatering work required for working water pipe lines complete all as specified and directed.
62All as per item No 40 here-in-above but 100 mmbore complete all as specified and directed.
63Taking up or down GI/CI/MS pipe from trenches including dismentling& removing for disposalfor the pipes of 150 mm bore complete all as specified and directed.
64All as per item No 42 here-in-above but 100 mmbore complete all as specified and directed.
65Supplying and laying in trenches DI pipe 150 mm bore, with spigot and socket end, class K7ISI marked as per IS 8329 complete all as specified and directed. Make: Electrosteel/TATA/JINDAL
66All as per item No 44 here-in-above but 100 mmbore complete all as specified and directed.
67Taking up or down PVC pipe from trenches including dismentling& removing for disposalfor the pipes of 160/150 mm bore complete all as specified and directed.
68Supply & fixing high density polyethylene pipe (HDPE) 160/150mm bore of presure rarting PE 100 PN 10 as per IS 4984-2016 Black colour complete with all fittings required at siteNote : (i) Cost of the all jointing material &fittings such as Tee, Bend, Socket etc are included in the cost of item rate.Make : Polytuf/supreme/Jindal/Jack pipes
69Material and labour for tyton rubber gasket joints for 200 mm bore complete all as specified and directed
70Material and labour for tyton rubber gasket joints for 150 mm bore complete all as specified and directed
71Material and labour for tyton rubber gasket joints for 100 mm bore complete all as specified and directed
72Material and labour for tyton rubber gasket joints for 80 mm bore complete all as specified and directed
73Supply onlybearing grease in 5 kg suppliers packing complete all as specified and directed. Make : Castrol/SKF
74Material and labour for site clearance by means removing of debris, cutting of grass, bushes, plant growth and disposed off up to a distance not more than 50mtr from the starting point all as directed at site at various water supply installations. Note:- This item shall be execute twice in six month at a particular site/location.
75Disconnecting and taking down unserviceable electric motor of capacity 100/125 HP 1450 RPM 3 Phase from base frame and shifting to workshop for rewinding & replacement of unserviceable bearing, opeing compete taking out Rotor assembly from starter carefully and cutting/cleaning burnt winding wire from startor, carefully reapirs to demage slots sinclduing Rewinding of starter with super enameled copper wire gauge sameas original & Varnishing the same drying tapping withcotton tapes all electrical cionnections should be soldered properly, reassemblingresifting, reinstallation & one coat of synthetic enamel paint at site inclduing testing at full load completeall asspecifed & directed.
76All as per item No. 54here-in-above but 75HP 1480 RPM 3 Phase complete all as specified & Directed.
77All as per item No. 54 here-in-above but 50HP 1480 RPM 3 Phase complete all as specified & Directed.
78All as per item No. 54here-in-above but 40HP 1480 RPM 3 Phase complete all as specified & Directed.
79All as per item No. 54here-in-above but 25HP 1480 RPM 3 Phase complete all as specified & Directed.
80All as per item No. 54here-in-above but 20HP 1480 RPM 3 Phase complete all as specified & Directed.
81All as per item No. 54here-in-above but 15HP 1480 RPM 3 Phase complete all as specified & Directed.
82All as per item No. 54here-in-above but 10/12.5HP 1480 RPM 3 Phase complete all as specified & Directed.
83All as per item No. 54here-in-above but 5/7.5HP 1480 RPM 3 Phase complete all as specified & Directed.
84Supply and fix bearing suitable for electric motor 125 HP. ( No-6311) complete all as specified and directed. Make - SKF/Tata/NBC
85Supply and fix bearing suitable for electric motor 75 HP to 100 HP.(No-6317C3 & 6314) complete all as specified and directed. Make - SKF/Tata/NBC
86Supply and fix bearing suitable for electric motor 40 to50HP.(No-63012 & 6314C3) complete all as specified and directed. Make - SKF/Tata/NBC
87Supply and fix bearing suitable for electric motor 12.5 HP to 25 HP.(No-6307C2) complete all as specified and directed. Make - SKF/Tata/NBC
88Supply and fix bearing suitable for electric motor 5 HP to 10 HP. (No-6306 & 6307) complete all as specified and directed. Make - SKF/Tata/NBC
89Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling for Centrigugal Pump Set discharge.-216 cum/hr at 130 Mtr head, 100/125 HP and shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
90Supply only following spares parts to be replaced as repair to centrifugal pumping set multi stage type100/125 HP complete all as specified and directed. Make:- Kirloskar under item No 68 here in above:-
91CI impeller
92SS sleeve
93CI bush
94MS coupling complete with rubber tyre/ Star rubber bush complete.
95CI neck ring
96Ball bearing
97Gland pusher
98Double check nut with studs complete
99Impeller Key
100Housing bush
101Pump Shaft
102MS coupling cover complete with nut bolt
103Interstage ring
104Seal stud packing O ring
105Wear ring
106Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling for Centrigugal Pump Setof capacity 75 HPand shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
107Supply only following spares parts to be replaced as repair to centrifugal pumping set75 HP HP complete all as specified and directed.Make:- Kirloskar under item No 70 here in above:-
108CI impeller
109SS sleeve
110CI bush
111MS coupling complete with rubber tyre/ Star rubber bush. make:- Love Joy/ Unic/ Unimax/ Unique/ Gemini
112CI neck ring
113Ball bearing
114Gland pusher
115Double check nut with studs complete
116Impeller Key
117Housing bush
118Pump Shaft
119MS coupling cover complete with nut bolt
120Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling for Centrigugal Pump Setof capacity 50 HP/40 HP and shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
121Supply only following spares parts to be replaced as repair to centrifugal pumping set50 HP/40 HPcomplete all as specified and directed. Make:- Kirloskar under item No 72 here in above:-
122CI impeller
123SS sleeve
124CI bush
125MS coupling complete with rubber tyre/ Star rubber bush. make:- Love Joy/ Unic/ Unimax/ Unique/ Gemini
126CI neck ring
127Ball bearing
128Gland pusher
129Double check nut with studs complete
130Impeller Key
131Housing bush
132Pump Shaft
133MS coupling cover complete with nut bolt
134Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling for Pumping Set Centrifugal,20 to 25 HP and shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
135Supply only following spares parts to be replaced as repair to Pumping Set Centrifugal 20/25 HP, multi stage complete all as specified and directed. Make:- Kirloskar under item No 74.00 here in above:-
136CI impeller
137SS sleeve
138CI bush
139MS coupling complete with rubber tyre/ Star rubber bush. make:- Love Joy/ Unic/ Unimax/ Unique/ Gemini
140CI neck ring
141Ball bearing
142Gland pusher
143Double check nut with studs complete
144Impeller Key
145Housing bush
146Pump shaft
147MS coupling cover complete with nut bolt
148Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling for Pumping Set Centrifugal,12.5 to 15 HP and shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
149Supply only following spares parts to be replaced as repair to Pumping Set Centrifugal 12.5 to 15 HP, multi stage Make:- Kirloskar under item No 76.00 here in above:-
150CI impeller
151SS sleeve
152CI bush
153MS coupling complete with rubber tyre/ Star rubber bush. make:- Love Joy/ Unic/ Unimax/ Unique/ Gemini
154CI neck ring
155Ball bearing
156Gland pusher
157Double check nut with studs complete
158Impeller Key
159Housing bush
160Pump shaft
161MS coupling cover complete with nut bolt
162Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling forCentrifugal pumping set , 7.5/10 HP.multistage. and shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
163Supply only following spares parts to be replaced as repair to Centrifugal pumping set ,7.5/10 HP multistage complete all as specified and directed. Make:- Kirloskar under item No 78.00 here in above:-
164CI sleeve
165CI bush
166MS coupling complete with rubber tyre/ Star rubber bush. make:- Love Joy/ Unic/ Unimax/ Unique/ Gemini
167CI neck ring
168Ball bearing
169Gasket packing set
170Pump stud of stainless steel with nut
171Taking down centrifugal pumping set from base frame including disconnection of inlet suction and discharge pipe line, pump coupling forCentrifugal pumping set , 3/5 HP.multistage. and shifting to workshop for repair and opening dismantling and overhauling complete parts, all parts cleaned by Kerosene oil neatly with and including replacement of defective spare parts by news parts including necessary welding machine/ grinding work if required at the time of refitting of spare into pump set and re-shifting, reinstallation on base frame with proper alignment with motor, one coat of synthetic enamel pain and testing on full discharge complete all as specified and directed. Note:- (i) Spare parts which are required to be replaced during repair shall be measured and paid separately in after as supply only rates,however fixing element shall be deemed to be included in the quoted rates of this item. (ii)Contractor shall ensure water pipe lines sealed by blocking with dead flange for the repair period if required.
172Supply only following spares parts to be replaced as repair to Centrifugal pumping set 3/5 HP multistage complete all as specified and directed. Make:- Kirloskar under item No 80.00 here in above:-
173CI sleeve
174CI bush
175MS coupling complete with rubber tyre/ Star rubber bush. make:- Love Joy/ Unic/ Unimax/ Unique/ Gemini
176CI neck ring
177Ball bearing
178Gasket packing set
179Pump stud of stainless steel with nut
180Supply and fixin replacement of u/s MCCB 400 Amps with terminals, breaking cap 36 KA 4 pole 415 V AC 50 Hz complete all as specified and directed.
181Supply and fixin replacement of u/s MCCB 250 Amps with terminals, breaking cap 36 KA 4 pole 415 V AC 50 Hzcomplete all as specified and directed.
182Supply and fixin replacement of u/s MCCB 200 Amps with terminals, , breaking cap 36 KA 4 pole 415 V AC 50 Hzcomplete all as specified and directed.
183Supply and fixin replacement of u/s MCCB 160 Amps with terminals, , breaking cap 36 KA 4 pole 415 V AC 50 Hzcomplete all as specified and directed.
184Taking down centrifugal pumping set alonwithbase frame including disconnection of inlet suction and discharge pipe line, pump coupling for Centrigugal Pump Set of any capacity for repair the PCC foundation and after repair the PCC foundationthe centrifugal pumping set alonwithbase frame reinstall on fondation with proper alignmentwith motor andreconnection of inlet suction and discharge pipe line, pump coupling of Centrigugal Pump Set and testing on full discharge complete all as specified and directed.
185Dismantling existing PCC and Material and labour for cement concrete 1:2:4 type B1 using (20 mm graded stone aggregate) as in mass concrete (for pump set foundation/DG set foundation/LT Panel foundation etc) and similar work including necessary form work finished even and smooth complete all as specified and directed. Note :- PCC foundation shall be done as per existing and suitable for available centrifugal pump set.
186Cutting the existing hard standing/ metal road of facilitate for laying of water pipe line and making good the disturbed portion to bring it to original condition with plain cement concrete 1:3:6 type C2 (using 40mm graded stone aggregate) complete all as specified and directed.
187Material and labour for earthing complete with galvanized steel plate electrodes of size 600mm x600mm x 6mm thick buried directly in ground with earth pit not less than 2.25m deep below normal ground level with top edge of plate not less than 1.5 m below normal ground level connected to galvanized strip of 25x4 mm earth lead by means of nuts bolts check nuts GI washers earth wire protected by galvanized iron pipe 40 mm bore (light grade) including concrete pit in PCC (1:3:6) type CI, precast RCC cover slab of size 30x30x10 cm with one handle for lifting made out of 8 mm dia MS bar funnel wire mesh 20 mm bore galvanized iron pipe (medium grade) for watering charcoal or coke and salt in alternate layers necessary earth work in soft/loose soil complete all as shown in electrical plate No 3 of SSR part 1 including testing on completion all as specified and directed.NOTE 1. The unit rate includes for protection pipe 40 mm dia and GI strip 32x6 mm from top of earth plate up to 7.5 meter above ground level.
188Material and labour for painting of different sizes connecting pipes Valve pit chamber covers, rolling shutters and its related items including writing letters on pump motors etc at various installations as per colour code with one coat of primer and two coat of synthetic enamelled paint complete all as specified and directed.
189Disconnecting the existing non functional submersible pump set 20HP to 30HP capacity from electric supply from panel, dismantling existing CI bend from non return valve, removing and lifting out submersible pump set of any description and capacity & in any position, alongwith existing column pipe 100mm dia and existing submersible cable of any size from the bore well ( up to 450 feet depth of pump set from GL) and staking thepump and column pipes near by the bore well for inspection complete all as specified and directed by Engineer-in-Charge. NOTE :(i)Contractor shall take proper precautions while lifting out and removing pump set from bore well so as to avoid any damage to column pipe and submersible cable.All necessary T&P and equipments required for lifting out pump set etc shall be arranged by the contractor at his own cost. (ii)Number of column pipe may vary from 20 to 30. The existing pipes & flanged joints shall be checked for its serviceability & unserviceable joints alongwith flanges shall be removed from the column pipe by cutting the pipes & making new thread in pipes for fixing of new flange joint, the cost of same shall be deemed to be included in the quoted rate for above item. However cleaning of pipes and new MS pipes if any required shall be measured & paid separately.
190Dismantling and strip opening of submersible pump & motor of any description and in any position for servicing /overhauling mechanically and electrically, cleaning, oiling/greasing, fixing of serviceable parts in position, removing & replacement of defective / unserviceable parts with new parts, welding , etc of broken steel sections of pump, full stator slot repair includingrotor sleeve grinding and polishing and balancing (if required), reassembling the Pump & motor, ensuring proper alignment of pump and motor,connecting to existing system and testing at site on full load to the entire satisfaction of the Engineer-in-Charge for 20 to 30 HP capacity, 3 phase, 415 volts, 50 HZ, AC supply pumps & motors. Note: - (i) The replacement of defective / nonfunctional parts shall be measured & paid for separately as “Supply only” under appropriate item of Sch ‘A’ and fixing rate for new items are deemed to include under these items. (ii)Burnt out windings of motor shall be replaced, measured and paid for separately under appropriate item of Sch ‘A’ for rewinding. (iii) Painting of complete submersible pump motor set will be carried out by contractor after complete repair of the same and the cost of the painting work will be included in quoted rate of this item.
191(iii)The rates for above items are deemed to include transportation to & fro of pumps/ motors to workshop for necessary repairs. (iv)The rate quoted for the item shall include re-metaling of Pump shaft, polishing andgrinding and making standard size to match withBush/Neck-ring/ sleeve etc (v) Lifting of pump and motor from bore well and lowering of pump and motor after repairs shall be measured and paid separately under appropriate item of Schedule `A" (vi) The quoted rate shall be deemed to include replacement of small/ minor parts i.e. washers, keys for coupling, cable packing ring etc.
192Supply only the following items / spare parts suitable for Motor of submersible of 20HP to 30 HP capacity dismantled under Sch ‘A’ item No. 92.00 above complete all as specified and directed by the Engineer-in-Charge.
193S/S upper sleeve.
194S/S lower bush.
195Upper bush rubber.
196Lower bush rubber.
197GM thrust bearing.
198GM thrust plate complete kit
199Thrust plate accel
200Supply only the following items / spare parts suitable for submersible pump set of 20 to 30HP capacity dismantled under Sch ‘A’ item No.92.00 above complete all as specified and directed by the Engineer-in-Charge.
201GMbush bearing.
202Neoprene rubber bush for stage bowl.
203Stain less steel sleeve.
204S/S stud with nut for stage bowl
205Impeller Key
206GM impeller
207Motor pump coupling made out of stain less steel with key.
208Stage bowl
209Anti magnetic stainless steel pump shaft with key
210Strainer stainless steel
211Taking out & removing old burnt out windings of the submersible electric motors of 20HP to 30 HP capacity and rewinding of submersible electric motors with existing size PVC insulated, copper conductor wire (Make : Finolex / Atlas)as approved by the Engineer-in-Charge including cleaning the slots with carbon- tetra-chloride solution before rewinding ,transportation to site complete all as specified and directed by Engineer-in-Charge :- Make of winding wire: Devidyal
212Lowering down of the submersible pump set of 20HP to 30HP & in any position, in bore well alongwith column pipe 100mm dia and submersible cable of any size (approximately 450 feet depth of pump set from GL) making necessary electric connections & testing the pump set after lowering for 04 hrs contineuous runningcomplete all as specified and directed by Engineer-in-Charge
213Material and labourfor scrubbing out rusted MS pipe of 100 mm bore with wire brush to remove rust, dirt etc. preparing the surface and applying a coat of anti corrosive bituminous paint complete all as specified and directed. (length of pipes shall be 3.00 meter )
214Supply and fixing straight through joint complete with jointing materials suitable for three core stranded copper conductor cable PVC insulated and sheathed flat submersible cable 1100 Volt grade complete all as specified and directed by Engineer-in-Charge.(Make 3M / Denson/Raychem )
215Material and labour for replacement of rubber gasket 4mm thick of size 100mm joints in flanged end cast iron / MS column pipes and fittingsand necessary nuts/bolts/washers complete all as specified and directed.
216Supply only MS bolts, nuts, washers, of various sizes complete all as specified and directed. Note : Weight shall be considered from relevant IS or as actual at site which ever is less.
217Supply and laying lowering & jointing with submersible pump lead including jointing material PVC insulated and PVC sheathed submersible flat cable multistranded copper conductor 50 Sqmm 3 core, 1100 volt grade including Material and labour for cable tieing arragngement with two places at each length(3mtr) of column pipeincluding taking down old complete all as specified and as directed.
218All as per item No. 101 here-in-above but 35 sqmm, 3 core complete all as specified and directed.
219All as per item No. 101 here-in-above but 25 sqmm, 3 core complete all as specified and directed.
220All as per item No. 101 here-in-above but 16 sqmm, 3 core complete all as specified and directed.
221All as per item No. 101 here-in-above but 10 sqmm, 3 core complete all as specified and directed.
222Material and labour for Painting to pit cover of valve chamber/sluice valve chamber with frame and applying two coats of black synthetic enamel paint over a coat of red oxide primer including preparation of surface by cleaning/brushing to remove flakes as directed by Engineer-in-charge for the following sizes of chambers:-
223600mmx600mmx600mm to 900mmx900mmx900mm
224120mmx120mmx120mm to 150mm x150mmx150mm
225Material and labour for painting of centrifugal pumping set of different capacity and its connected items items (sluice valve, NRVs, Coupling gaurd, Base frame etc) including writing letters on pump motors etc at various installations as per colour code with one coat of primer and two coat of synthetic enamelled paint all as specified and directed :-
226Centrifugal pump set of capacity 5 HP to 10 HP
227Centrifugal pump set of capacity 12.5 HP to 25 HP
228Centrifugal pump set of capacity 50 HP to 75 HP
229Centrifugal pump set of capacity 100 HP to 125 HP
230Dismantle the broken valve chamber of size 60x60x60cm to 80x80x80cm and construct of new brick masonry valve pit of internal size 60x60x60cm to 80x80x80 cm with 230mm thick brick wall built in cement mortar plain cement concrete 1:3:6 and base surface area of valve chamber shall also built in cement mortar PCC 1:3:6 with adequate plastering andplastering 15mm wall sides in cement mortar 1:4 and the pit covered with MS plain sheet 3 mm thick duly fixed to MS angle iron of size 40x40x3mmand duly embedded in plain cement concrete coping 5 cm thick plain cement concrete 1:2:4mm type B1with opening and locking arrangements including painting with two coat of synthetic enamel paint over one coat of primer complete all as specified and directed.
231Dismantle the broken valve chamber of size 90x90x90cm to 110x110x110 cm and construct of new brick masonry valve pit of internal size 90x90x90cm to 110x110x110cm with 230mm thick brick wall built in cement mortar plain cement concrete 1:3:6 and base surface area of valve chamber shall also built in cement mortar PCC 1:3:6 with adequate plastering andplastering 15mm wall sides in cement mortar 1:4 and the pit covered with MS plain sheet 3 mm thick duly fixed to MS angle iron of size 40x40x3mm and duly embedded in plain cement concrete coping 5 cm thick plain cement concrete 1:2:4mm type B1with opening and locking arrangements including painting with two coat of synthetic enamel paint over one coat of primer complete all as specified and directed.
232Dismantle the broken valve chamber of size 120x120x120cm to 150x150x150cm and construct of new brick masonry valve pit of internal size 120x120x120cm to 150x150x150cm with 230mm thick brick wall built in cement mortar plain cement concrete 1:3:6 and base surface area of valve chamber shall also built in cement mortar PCC 1:3:6 with adequate plastering andplastering 15mm wall sides in cement mortar 1:4 and the valve pit covered with MS plain sheet 3 mm thick duly fixed to MS angle iron of size 40x40x4mm and duly embedded in plain cement concrete coping 5 cm thick plain cement concrete 1:2:4mm type B1with opening and locking arrangements including painting with two coat of synthetic enamel paint over one coat of primer complete all as specified and directed.
233Material and labour for MS ERW steel pipe 7.0 mm thick of 300mm dia including taking down complete all as directed by Engr-in-Charge.
234Material and labour for MS ERW steel pipe 7.0 mm thick of 200mm dia including taking down complete all as directed by Engr-in-Charge.
235Material and labour for MS ERW steel pipe 7.0 mm thick of 150mm diaincluding taking down complete all as directed by Engr-in-Charge.
236Material and labour for MS ERW steel pipe 7.0 mm thick of 100mm diaincluding taking down complete all as directed by Engr-in-Charge.
237Material and labour for MS ERW steel pipe 7.0 mm thick of 80mm diaincluding taking down complete all as directed by Engr-in-Charge.
238Material and labour for MS flange min 8 mm thick of 200mm dia duly drilled holesincluding welding in plain end of MS pipe with one rubber gasket complete all as specified and directed.
239Material and labour for MS flange min 8 mm thick of 150mm dia duly drilled holesincluding welding in plain end of MS pipe with one rubber gasket complete all as specified and directed.
240Material and labourfor MS flange min 8 mm thick of 100mm dia duly drilled holesincluding welding in plain end of MS pipe with one rubber gasket complete all as specified and directed.
241Material and labour for MS flange min 8 mm thick of 80 mm dia duly drilled holesincluding welding in plain end of MS pipe with one rubber gasket complete all as specified and directed.
242Material and labour for tyton rubber gasket joints for 200 mm bore complete all as specified and directed
243Material and labour for tyton rubber gasket joints for 150 mm bore complete all as specified and directed
244Material and labour for tyton rubber gasket joints for 100 mm bore complete all as specified and directed
245Material and labour for tyton rubber gasket joints for 80 mm bore complete all as specified and directed
246Material and Labour greased graphite gland packing of size 6mmas required at site complete all as specified & directed. Make :- Champion
247Material and Labour for greased graphite gland packing of size 8mm as required at site complete all as specified & directed. Make :- Champion
248Material and Labour for greased graphite gland packing of size 10 mm as required at site complete all as specified & directed. Make :- Champion
249Material and Labour forgreased graphite gland packing of size 12 mm as required at site complete all as specified & directed. Make :- Champion
250Disconnecting the existing non functional open well submersible pump set of capacity upto 0.5 HP to 3 HP (single phase) from starter/Starterpanel, removing and lifting out open well submersible pump set of any description and existing capacity & in any position, alongwith existing fittings and cable from the open well and transporting to workshop forservicing /overhauling mechanically and electrically, cleaning, oiling/greasing, fixing of serviceable parts in position, removing & replacement of defective / unserviceable parts with new parts, welding , etcreassembling the open well submersible Pump Set,connecting to existing system and testing at site on full load to the entire satisfaction of the Engineer-in-Charge Note: -(i)Contractor shall take proper precautions while taking out and removing pump set from open well so as to avoid any damage.All necessary T&P and equipments required for lifting out pump set etc shall be arranged by the contractor at his own cost. (i) Cost of supply and fix of defective / nonfunctional parts will be included in quoted rate of this item and shall not paid separately. (ii)Burnt out windings of motor shall be replaced, measured and paid for separately under appropriate item of Sch ‘A’ for rewinding. (iii) Painting of complete open well submersible pump motor set will be carried out by contractor after complete repair of the same and the cost of the painting work will be included in quoted rate of this item.
251Taking out & removing old burnt out windings of the submersible electric motors of capacity upto 0.5 HP to 3 HPand rewinding of submersible electric motors with existing size PVC insulated, copper conductor wire as approved by the Engineer-in-Charge including cleaning the slots with carbon- tetra-chloride solution before rewinding ,transportation to site complete all as specified and directed by Engineer-in-Charge.
252Supply & fixing ofadjustable type, 3/4" brass fountain nozzles complete all as specified and directed.
253M &L for supply, installation, testing and commissioning of open well submersible pump set electric driven Single phase,50Hz 160-260 volt grade complete with 10 meters submersible cable and suitable starter capacity for motor 1.0 HP. Discharge capacity 3.7 LPS in 12 Mtr Head complete all as specified and directed.
254Supply and fixDOL starter suitable forSingle phase submersible pump of01 HP Capr with over load relay of 6-16 Amps and starting capacitor of 100-120 mfd complete all as specified and directed.
255Material and labour for dismantling electrically and taking down unserviceable fully automatic starter any type dry/ ATS type, from base frame and transporting to workshop for cleaning and refixing the serviceable parts back after repair and replacement of U/s partsfor the 15 HP to 50 HP capacity size.(Note: Spare parts required for replacement shall be measured & paid for separately under respective item).
256Material and labour for dismantling electrically and taking down unserviceable fully automatic starter any type dry/ ATS type, from base frame and transporting to workshop for cleaning and refixing the serviceable parts back after repair and replacement of U/s partsfor the 75 HP to 125 HP capacity size complete all as specified and directed. (Note: Spare parts required for replacement shall be measured & paid for separately under respective item).
257Supply only following spares of fully automatic starter:-
258Fixed power copper contacts suitable for 75 HP to 125 HP star delta starter.
259Moving power copper contacts suitable for 75 HP to 125 HP star delta starter.
260Moving power copper contacts suitable for 15 HP to 50 HP star delta starter.
261Fixed power copper contacts suitable for 15 HP to 50 HP star delta starter.
262Auxiliary switch type -01 with 1 No-1 NC suitable for 15 to 50HP star delta starter.
263Auxiliary switch type -01 with 1 No-1 NC suitable for 75/100HP star delta starter.
264Supply and fixin replacement water pressure gauge glycerin filled of size 100 mm 0-7 kg/cm2complete all as specified & directed. Make : H Guru or equivalent
265Taking down old U/S ampere meter from existing panel board and Material and labour for new ampere meter as per existingfor three phase AC supply withcomplete wiring connections complete all as specified and directed.Make :- Legrand/Seimens/C&S/Schenider.
266Taking down old U/S volt meterfrom existing panel board and Material and labour for new volt meter 0-500 volt for three phase AC supply withcomplete wiring connections complete all as specified and directed.Make :- Legrand/Seimens/C&S/Schenider.
267Supply only copper tube (Thimbles) terminal heavy dutyof size 25Sqmm complete all as specified and directed.
268Supply only copper tube (Thimbles) terminal heavy dutyof size 35Sqmm complete all as specified and directed.
269Supply only copper tube (Thimbles) terminal heavy dutyof size 50 Sqmm complete all as specified and directed.
270Supply only copper tube (Thimbles) terminal heavy dutyof size 70 Sqmm complete all as specified and directed.
271Supply only copper tube (Thimbles) terminal heavy dutyof size 95 Sqmm complete all as specified and directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail