Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published The Work Installation Of New Distribution Transformer And Increasing Capacity In Business Plan-2024-25 Under Edc Hathras.. Submission Date for this Tender is 16-05-2024. Distribution Transformer Tenders in hathras Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply of Following Matarial as per relevent ISS |
2 | Stone Pad 300x300x75 mm |
3 | Cross Arm holding Clamp |
4 | F-Braket |
5 | Holding Clamp for Tee Channel |
6 | Nut, Bolt & Washer |
7 | Earthing Complete |
8 | Guarding Angle, Nut Bolt with eye bolt Complete |
9 | D/Pole Clamp |
10 | AL LUG 400 sqmm |
11 | Copper L-Piece 50x225x10 mm(LS) |
12 | Bolt & Nuts |
13 | LT Clamp with Bolt & Nut |
14 | Pearcing Connector |
15 | L.T Distribution Box 3-Phase |
16 | Clamp for Distribution Box |
17 | Scope of work |
18 | Safe Carriage of following material from Electricty store centerHts to Pit site of work through the Kacha and Pakka road includingloading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
19 | Pcc Pole 8.5 Mtr. Long |
20 | 11 KV Steel Cross Arm V Type 65x65x6 mm |
21 | 11 KV Pin Insulator |
22 | 11 KV Pin with Nut |
23 | 11 KV Disc Insulator |
24 | 11 kv Disc Fitting |
25 | H.T Tee Channel |
26 | ACSR weasel Conductor |
27 | Stay set Complete |
28 | G.I Wire 6 SWG |
29 | G.I Wire 8 SWG |
30 | 25 KVA 11/0.4 KV T/F |
31 | LT XLPE Cable 3.5x70 Sqmm for 25 kva |
32 | M.S Top Channel 125x65x2240 mm |
33 | Dropper Channel 100x50x2028 mm |
34 | M.S Angle 75x75x6x2228 mm with Clamp |
35 | 11 KV Fuse Set |
36 | 11 KV TPMO with Polymer Insualator |
37 | T/F 11/.04 Kv, 250 KVA New |
38 | LT PVC Cable AL 3.5*400 sqmm |
39 | Suspension Clamp with I-Hook |
40 | Dead End Clamp |
41 | Arreal Bunch Conductor 3x120 mm for 250 kva |
42 | 1x16 sqmm PVC Cable Single core |
43 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
44 | 8.5/9 Mtr PCC Pole |
45 | Double pole |
46 | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work |
47 | 11 KV Steel Cross Arm V Type 65x65x6 mm |
48 | 11 KV Pin Insulator |
49 | 11 KV Pin with Nut |
50 | 11 KV Disc Insulator |
51 | 11 kv Disc Fitting |
52 | H.T Tee Channel |
53 | M.S Top Channel 125x65x2240 mm |
54 | Dropper Channel 100x50x2028 mm |
55 | M.S Angle 75x75x6x2228 mm with Clamp |
56 | 11 KV Fuse Set |
57 | 11 KV TPMO with Polymer Insualator |
58 | Suspension Clamp with I-Hook |
59 | Dead End Clamp |
60 | Installation offollowing T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. |
61 | 25 KVA T/F |
62 | Installation of 250 KVA T/F on newly/Old constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work |
63 | Safe Dismenteling of old and used following T/F from Double Polewith opening of all HT/LT Jumpers,all works which required for dismentling ofT/F and carriage it up to Store Hathras/ J.E Storeall cost of labour and T&P which required for completion of work |
64 | 10/16 KVA T/F |
65 | 100 KVA T/F |
66 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
67 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
68 | Laying, sagging and stringing and jumpering / binding etc. ofnew &old ACSR Weasal conductor / GIin 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. |
69 | ACSR weasel Conductor |
70 | LT XLPE Cable 3.5x70 Sqmm for 25 kva |
71 | LT PVC Cable AL 3.5*400 sqmm |
72 | Arreal Bunch Conductor 3x120 mm for 250 kva |
73 | 1x16 sqmm PVC Cable Single core |
74 | Construction of plinth of size 5" * 5 * 4" above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering willbe done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. |
75 | Pipe earthing of 250/400 KVA medium Power Transformers |
76 | Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut |
77 | Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. |
78 | Earthing of power T/F (Body & Neutral) |
79 | Back Cartage of Following Matarial |
80 | 10/16 KVA T/F |
81 | 100 KVA T/F |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy