Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Various Site Existing 11 Kv Feeder Line Old And Jar Jar Conductor Replacement Work In Business Plan 2024-25 Various Site Existing 11 Kv Feeder Line Old And Jar Jar Conductor Replacement And 33 11 Kv Substation Makhiyali Power Tf Making New Plin. Submission Date for this Tender is 04-06-2024. Feeder Pillar Tenders in Muzaffarnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-May-2024 | DATE EXTENSION | Date | 22-05-2024 |
2 | 22-May-2024 | DATE EXTENSION1 | Date | 29-05-2024 |
3 | 29-May-2024 | DATE EXTENSION2 | Date | 04-06-2024 |
FileName | File Description | File Size |
56c21cc5-6f10-4093-b552-dfbb0ff8437b.html | Tender Notice | 0 KB |
BOQ_1596663.xls | Tender Document | 0 KB |
Tenderform.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
2 | PCC Pole 8.5 Meter |
3 | PCC Pole 11 Meter |
4 | ACSR Weasel Conductor |
5 | 90 LBS RAIL PIECES for Power Transformer |
6 | LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) |
7 | Complete work of installing the electrical material received from the store center at the site. |
8 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
9 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
10 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. |
11 | Replace Damage V-Type Cross-Arm to New 11 KV V-Type X-Arm Fixing/installation on Established Single Pole of Line As per the RESPO standards. |
12 | Replace Damage Pin Insulator to New Pin Insulator Fixing/installation on Established Single Pole of Line As per the RESPO standards. |
13 | Complete work of installation of Stay Set Complete on Established Double pole & Single Pole of Line As per the RESPO standards. |
14 | Complete work of Pole concreting on Established Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
15 | Safely Removing the 10 MVA Power Transformer from the old plinth with the help of a crane and after completion work of the New Plinth, Reinstalling the Power Transformer as before. In which necessary decentralized material will be provide by the Contractor/Firm. |
16 | Complete work of making a new plinth (with RAIL PIECES install) in place of the damaged plinth for the safety of 10 MVA Power Transformer installed at 33/11 KV Sub-station Makhiyali as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
17 | Complete work of Pipe Earthing (upto Water Level) of Established 10 MVA Power Transformer installed at 33/11 KV Sub-station Makhiyali as per RESPO standards. |
18 | Complete work of making a New Fire Wall (Height 5 mtr. + Lenth 5 mtr.) for the safety of Power Transformer installed at 33/11 KV Sub-station Makhiyali as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. |
19 | Bus-Bar Structure & Connection Related work During Removal & Reinstallation Process of Power Transformer installed at 33/11 KV Sub-station Makhiyali as per RESPO standards. In which necessary decentralized material will be provide by the Contractor/Firm. |
20 | Supply of NUT & BOLT as per RESPO standards |
21 | Supply of F-BRACKET as per RESPO standards |
22 | Supply of X-ARM HOLDING CLAMP as per RESPO standards |
23 | SUNDRIES ITEMS |
24 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
25 | ACSR CONDUCTOR (OLD & USED / SCRAP) |
26 | MS SCRAP |
27 | ST POLE DAMAGED AND RUSTED |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy