}

Tender For Replacement Of Jarjar Vcb, Control Penel, Under Edd Khatauli., khatauli-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Replacement Of Jarjar Vcb, Control Penel, Under Edd Khatauli.. Submission Date for this Tender is 22-05-2024. Electrification Work Tenders in khatauli Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43335507
Corrigendum : Tender For Replacement Of Jarjar Vcb, Control Penel, Under Edd Khatauli.
Open Tender
Indian
Uttar Pradesh
khatauli
22-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Replacement Of Jarjar Vcb, Control Penel, Under Edd Khatauli.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-May-2024 DATE EXT 22.05.2024 Date 22-05-2024

Key Value

Document Fees
INR 1180 /-
EMD
INR 2000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
8d213686-47c1-46a7-9efc-c990539caf75.html Tender Notice 0 KB
BOQ_1596544.xls Tender Document 0 KB
T180.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work:Under Business Plan Work 2024-25 Replacement of Jarjar Vcb, Control Penel on33/11 KV Khatauli Town, Tisang, Goyala in Area of EDD Khatauli
Sl. No. Item Description
1Safly Cartage of 33 KV VCB/ 11 KV O/G and I/C VCB from Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane.
2Safly Cartage of 33 KV Control Peneal from Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane.
3Dismentling of old VCB from the control room/Switch yard including opening of all H.T. cable and bus-bar form VCB and carriage of VCB from control room to out side the control room
4Dismentling of old Control penal from Control Room/Switch yard including opening of all Connection and carriage of VCB from Switch Yardto out side on Safe place
5Shifting of New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts.
6Shifting of New Control Penalfrom out side to inside the control room/Switch yard with the help of heavy duty crene and its instalationvProperly Connection with grouting with anchor bolts.
7Safly Cartage of XLPE/PVC Control Cablefrom Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect with the help of heavy duty crane.
8Digging Tranch and Placednew XLPE cable In tha Tranchin all respect.
9Safly Cartage of Jointing Kitt(I/D & O/D) form centeral store to 33/11 kv S/S andInstalation work inXLPE cable, connected properly with RESPO norms in all respect.
10Making the bus-bar connection of VCB and making connection of H.T. Cable with VCB and proper insulation of bus-bar and making the connection of11KV VCB etc, completely in all respect.
11Safly carage of CT Unit from Centeral Store to33/11 KV Sub Station including loading and unloading to both ends in all respect and Instalation work on Sub Station
12Received Back oldVCB from Site to Store (Including Loading, Unloading, Cartage in all respect)
13Received Back oldControl Penalfrom Site to Store (Including Loading, Unloading, Cartage in all respect)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail