}

Tender For Construction Of Compound Wall Along The Boundaries Of Land Acquired For The Projects Of Extension Of Mmtand Freight Village At Varanasi In Nw1, varanasi-Uttar Pradesh

Inland Waterways Authority Of India-IWAI has published Tender For Construction Of Compound Wall Along The Boundaries Of Land Acquired For The Projects Of Extension Of Mmtand Freight Village At Varanasi In Nw1. Submission Date for this Tender is 30-05-2024. Wall Construction Tenders in varanasi Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43334606
Corrigendum : Tender For Construction Of Compound Wall Along The Boundaries Of Land Acquired For The Projects Of Extension Of Mmtand Freight Village At Varanasi In Nw1
Open Tender
Indian
Uttar Pradesh
varanasi
30-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Construction Of Compound Wall Along The Boundaries Of Land Acquired For The Projects Of Extension Of Mmtand Freight Village At Varanasi In Nw1

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 14-May-2024 Pre-bid meeting link Technical Bid 30-05-2024
2 16-May-2024 Amendment-2 Technical Bid 30-05-2024

Key Value

Document Fees
INR 5000 /-
EMD
INR 888364.0 /-
Tender Value
INR 4.44 Crore /-

Attachment

FileName File Description File Size
dc87f7e5-5df8-48f9-a539-c43715175ad9.html Tender Notice 0 KB
BOQ_847444.xls Tender Document 0 KB
Tender.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work:Construction of Compound Wall along the boundaries of land acquired for the projects of extension of MMT & Freight Village at Varanasi.
Sl. No. Item Description
1Site Clearance by clearing of jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of width up to 30 cm along the alignment of the proposed compound wall area and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared by manually or machine cutting etc. from the terminal land and disposal of the same as and where directed by the Engineer in Charge.charges etc complete
2Earthwork excavation by manually or by mechanical means at a depth of 1.00 for making foundation for compound wall including hire charges of machineries, tools, transportation to the site and labour charges etc., completemoulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete
3Providing and laying in position P.C.C. in CC 1:3:6, 15 cm thick for foundation base for compound wall including the cost of cantering, shuttering and finishing. The rate shall include cost of all materials, transportation, labour charges, scaffolding etc. complete.cost and conveyance of all materials and including all labour charges etc complete
4Providing and laying in position R.C.C. in CC 1:2:4, 65 cm thick for grade beam above PCC for foundation footing of the compound wall excluding the cost of cantering, shuttering, and finishing as per the directions of E-I-C. The rate shall include cost of all materials, transportation, labour charges etc. complete.cost and conveyance of all materials and in
5Providing and laying in position R.C.C. in CC 1:1½:3, 20 cm thick for capping beam / belt above RCC footing of the compound wall excluding the cost of cantering, shuttering, and finishing as per the directions of E-I-C. The rate shall include cost of all materials, transportation, labour charges etc. complete.
6Steel reinforcement for RCC grade beam and capping beam including straightening, cutting, bending, placing in position and binding all complete as per the drawing and specification
7Cantering & shuttering including strutting, propping etc. for grade beam and capping beam at ground level including cost of all materials, labour charge and removal of form work etc., complete as per the directives of the Engineer - in – Charge
8Brick work in cement mortar 1:6 for re-construction of compound wall of width 23 cm with modular bricks & each layer of brick must be placed in proper alignment and plumb as per the directions of Engineer - In - Charge including cost of materials, transportation, fixing in position, scaffolding and labour charges etc. complete.
9Plastering in CM 1:4, 12 mm thick on Rubble masonry, brick masonry and pillars including cost of materials, labour, finishing, curing etc. complete.
10Applying priming coats on newly constructed portion of compound wall with primer of approved brand and manufacture, with water thinnable cement primer on wall surface having VOC content less than 50 grams/litre
11Painting with weather shield smooth exterior paint two or more coats applied @ 1.43 ltr/ 10 sqm over new work of compound wall and kerb wall as per directions of E-I-C.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail