Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Maintenance Work Of Damaged Line And Distribution Transformer Pilnth In Edsd-Handia, Katehara, Saidabad And Janghai Road, Prayagraj, Under Edd-Handia, Prayagraj. Submission Date for this Tender is 22-05-2024. Distribution Transformer Tenders in prayagraj Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-May-2024 | 1st Date Extension T03 | Date | 22-05-2024 |
FileName | File Description | File Size |
771fd845-7828-4afb-bf4b-a1422fa1643f.html | Tender Notice | 0 KB |
BOQ_1596471.xls | Tender Document | 0 KB |
Specification03.rar | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Carriage of PCC/ST Pole from Naini store center to work site. |
2 | Carriage of safely loading 8.5 meter PCC Pole/11 meter ST Pole from Naini store center to various work site. |
3 | Carriage of transportingof ACSR Weasel Conductor from Naini store center to work site. |
4 | Carriage ofcross Arms, Stay rod, Pin Insulator etc. from Naini store center to work site. |
5 | Work related to maintenance of damaged line. |
6 | Work of erecting the damaged 8.5 meter PCC/11 meter ST pole by digging a pit and tying the fitting to the new pole as per RESPO Standard (including grouting & earthing) (all the material will be providing by the firm). |
7 | Erection of damaged double pole (8.5meter/11meter ST pole) by digging pit and tying all fitting to the new pole as per RESPO Standard (including grouting & earthing) (all the material will be providing by the firm). |
8 | Replacement of damaged cross arm in place of new cross arm. |
9 | Replacement of damaged pin insulator/disk insulator in place of new insulator. |
10 | Work of staightening the crooked PCC/ST Poles installed in HT/LT lines by deep digging (which includes the work of grouting, earthing and re-sagging the loose weasel conductors). |
11 | Grouting and Nuzzling work by installing a new stay in place of the dameges stay (concreting and other materials will be provided be the firm). |
12 | Work of installing new guarding in place of damaged guarding. |
13 | Work of sagging, binding and jumpring by restringing of ACSR weasel conductors. |
14 | The work of Looping Chopping small branch of trees falling in line. |
15 | The work of Looping Chopping Big branch of trees falling in line. |
16 | Work related to repairing the damaged distribution Transformer plinth by concrete of 1/3 cement with coarse sand (all the material will be providing by the firm). |
17 | GST Extra as legally applicable |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail