Tender For Work Of Attending Breakdowns Strengthening Re Arrangements Replacement And Repairing Of 11 Kv Of Over Head And Underground Lines And 11 Sub Station Line In Area Of Gumti Under Eudc Ii Kesco, Kanpur, Kanpur-Uttar Pradesh

Kanpur Electricity Supply Co Limited-KESCO has published Tender For Work Of Attending Breakdowns Strengthening Re Arrangements Replacement And Repairing Of 11 Kv Of Over Head And Underground Lines And 11 Sub Station Line In Area Of Gumti Under Eudc Ii Kesco, Kanpur. Submission Date for this Tender is 22-05-2024. Electrification Work Tenders in Kanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43327861
Corrigendum : Tender For Work Of Attending Breakdowns Strengthening Re Arrangements Replacement And Repairing Of 11 Kv Of Over Head And Underground Lines And 11 Sub Station Line In Area Of Gumti Under Eudc Ii Kesco, Kanpur
Open Tender
Indian
Uttar Pradesh
Kanpur
22-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Work Of Attending Breakdowns Strengthening Re Arrangements Replacement And Repairing Of 11 Kv Of Over Head And Underground Lines And 11 Sub Station Line In Area Of Gumti Under Eudc Ii Kesco, Kanpur

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-May-2024 Date Extend 22.05.2024 Date 22-05-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 13500.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
6d15b2c4-15ce-46ee-b7f6-13d7298b8afa.html Tender Notice 0 KB
BOQ_1596451.xls Tender Document 0 KB
T26.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work: < work of attending breakdowns, Strengthening, re-arrangements, replacement and repairing of 11 K.V., 0.4 K.V., of O.H. & U/G Lines & 11/0.4S/S, line against M&R and Small Deposit workin area of Gumti under EUDC-II, Kesco, Kanpur..>
Sl. No. Item Description
1Pole Work
2Dismentalling of X-Arm/L.T. brackets and insulators etc. from the damaged pole/pole to be replaced/shifted.
3Excavation of foundation and taken out the damaged pole/pole to be replaced/shifted from the ground.
4Loading, Carriage and unloading of poles from store to work site.
5Loading, Carriage and unloading of damaged poles from work site to store.
6Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification.
7Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
8Erection of Same for Old pole Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.
9Erection of old partialy damiged S.T. Pole for H.T./L.T. pole by excavation & removed of Polesand then refxing of pole inchanging proper concreting and dismentaling & refixing of all acuerreny
10Concreting of all newly ereeted(New/Old) S.T. pole of H.T/L.T. lineWith pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
11Erection of double pole structure including fixing of T.P.M.O. (Old/New) (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.
12Making of a double pole structure by erection a single pole with a specific distance from existing single pole on a running H.T. Line, fixing of T.P.M.O. (if available) (Top channel, fuse set channel etc. as per standard specification)
13Erection of four pole structure including fitting of channels etc. as well as proper alignment of structure.
14Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.
15Fixing of stay rod and its erection by fitting of Old/New stay clamp. Stay wire and its proper binding and tightening etc.
16Line Work (Conductor)
17Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles.
18Loading, carriage and unloading of conductor from store to work site and vice versa
19Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.
20Laying, stringing, tensioning and binding of Weasal conductor old/new for H.T./L.T. O.H.
21Laying, stringing, tensioning and binding of Dog conductor old/new for H.T./L.T. O.H.
22Fixing of guarding angle/guarding channel for laying of guarding wires
23Laying, stringing, tensioning & final sagging for guarding wire old/new
24Cross lacing of guarding by G.I. wire old/new (approximate 5 lacing of each span)
25Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.
26Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.
27Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.
28Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.
29Fabrication/modifications of M.S. Items as per requirement of site conditions.
30Jumpering of H.T. Lines from the existing H.T.O.H. line.
31Jumpering of L.T. Lines from the existing L.T.O.H. line.
32Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.
33Making proper clearance of betwean House & line Conducter to avoid accident by providing & flaxing Angle/Channel on pole, and shifing Line on Angle/Channel. (MS item provided by contractor)
34Line Work (AB Cable)
35Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line.
36Removal of AB Cable to replaed damige pole by Old/New pole and its proper Laying & resagging on poles including proper fxing of Distribution boxand making connectionCnchuding providing board & frixing new Eye Hook in place of damiged
37Loading, carriage and unloading of Aearial Bunched Cablefrom store to work site and vice versa.
38Laying of Aearial Bunched Cable old/new for Erection of L.T. O/H Line.
39Mounting & Erection of single phase distribution box old/new
40Mounting & Erection of three phase distribution box old/new
41Opening and reconnection of consumer connections for shifted/replaced of pole.
42Repairing of Single Phase/Three Phase distribution Box (All material provided by contractor)
43H.T. / L.T. Cable Work
44(a) H.T. Cable
45(b) L.T. Cable
46Digging of cable trench in size of 30 cm wide and 60 to 90 Cm meter deep as per site requirement for laying of cable-
47(a) Normal Soil
48(b) Kharanja Road
49(c)Metallic Road
50Laying of cable in the abovedigging, trench, covering with bricks, sand and back filling.
51(a) H.T. Cable
52(b) L.T. Cable
53Laying of H. T. cable through Hume/C.I./MS. pipe in digged trench and back filling.
54(a) H.T. Cable
55(b) L.T. Cable
56Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.
57(a) H.T. Cable
58(b) L.T. Cable
59Restoration of Metallic/RCC road after proper repairing with appropriate materials.
60Making of cable box for 11 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)
61Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends.
62(a) With pipe (3Mtr. Long MS pipe will be provided by KESCo)
63(b) Without pipe
64Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line :
65a) Single Core L.T. Cable
66b) 3 ½ Core L.T. Cable
67c) 11 KV H.T. Cable
68Distribution T/F work
69Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 2.0 x 2.0 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.
70Shifting of Charged T/F on Trolly for Making plinth & then reshifting on T/F Plinth Indudy all Labour matenal & T&P reqund
71For restoring Supply in come of T/F damiged Shifting of T/F Trolly upto site & vice versd.
72Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.
73Erection of Distribution T/F on plinth/D/pole structure.
74Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.
75Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.
76Connection of L.T. cable from L.T.D.B to L.T.O.H.
77To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
78Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.
79Making proper earthing arrangement of T/F bydeep bore pipe earthing including (G.I. Pipe 40 mm. dia, B-Class, 40 feet, socket, cutter and earth wire size 7/14SWG with nut & bolt) with connecting the same with Distribution T/F Neutral & Body. All material will be provided by Contractor.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail