Madhyanchal Vidut Vitran Nigam Limited has published Tender For Installation Of Inverter Battery, Replacement Of Feeders/Panels, Interpolating Of Power Lines And Various Other Electricity Related Works Under The Business Plan 2024-25 Under Electricity Distribution Division-Iii (Karnailganj), Gonda Area.. Submission Date for this Tender is 21-05-2024. Feeder Pillar Tenders in gonda Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-May-2024 | date extension | Date | 21-05-2024 |
FileName | File Description | File Size |
c40324a1-ee98-4f72-a5c0-88795ff190fd.html | Tender Notice | 0 KB |
130.pdf | Tender Document | 0 KB |
BOQ_1596430.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | All these below items/materials from S.N. 1.01 to 1.23 will be given and errected by the contractor on his own cost as per estimate/Resspo Norms. |
2 | CLAMP FOR TOP, DROPPER AND T-OFF |
3 | 11 KV SPOUT |
4 | VACCUME INTRUPTER |
5 | M.S. NUT & BOLT |
6 | V TYPE X-ARM HOLDING CLAMP |
7 | Guarding Angle Holding Clamp |
8 | 11 KV TPMO WITH COMPLETE FITTINGS |
9 | 33 KV TPMO WITH COMPLETE FITTINGS |
10 | Earthing Complete |
11 | AL-LUG 400 SQMM |
12 | RABBER MAT |
13 | 33 KV FUSE SET |
14 | 11 KV FUSE SET |
15 | 33 KV BUS BAR |
16 | Mobile Trolly With 2 Nos Gate as per approved norms in MVVNL with complete fitting and painting |
17 | F- Bracket |
18 | 24 VOLT BATARY |
19 | BATARY CHARGER |
20 | PG CLAMP FOR LINE ISOLATOR |
21 | PG CLAMP FOR DOG CONDUCTOR |
22 | SUNDRIES (sand brick etc.) |
23 | Stone Pad |
24 | Guarding Angle |
25 | Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.38) from Electricity Store Centre, Gonda to the work site/dump site (Distance up to 60 km) |
26 | ST POLE13 METER |
27 | ST POLE11 METER |
28 | 400 KVA T/F |
29 | ACSR Weasel Conductor |
30 | ACSR Dog Conductor |
31 | MS ANGLE |
32 | TOP CHANNEL |
33 | 33 KV V-TYPE STEEL X-ARM |
34 | 11 KV PIN INSULATER WITH PIN and NUT |
35 | 33 KV POLYMERIC PIN INSULATOR WITH PIN AND FITTING |
36 | 33 KVPOLYMERIC DISC INSULATORWITH PIN AND FITTING |
37 | STAY SET COMPLETE |
38 | LT XLPE CABLE 3 × 70 |
39 | 11 KV XLPE CABLE 3 × 120 |
40 | 11 KV XLPE CABLE 3 × 185 |
41 | 11 KV XLPE CABLE 3 × 300 |
42 | LT XLPE Cable 1x400 AL |
43 | 11 KV JOINTING KIT FOR 3 × 70 |
44 | 11 KV JOINTING KIT FOR O/D 3 × 120 |
45 | 11 KV JOINTING KIT FOR I/D 3 × 120 |
46 | 11 KV JOINTING KIT O/D FOR 3 × 185 |
47 | 11 KV JOINTING KIT I/D FOR 3 × 300 |
48 | 11 KV JOINTING KIT O/D FOR 3 × 300 |
49 | 11 KV VCB I/C 600/300/5 A |
50 | 11 KV VCB O/G 400/200/5 A |
51 | 11 KV VCB I/C 1200/600/5A |
52 | 11 KV VCB O/G 600/300/5 A |
53 | 33 KV Vacume Circuit Brakar 1250 Amp. |
54 | 33 KV OUT DOOR PT |
55 | 33 KV LINE ISOLATOR |
56 | 33 KV BUS ISOLATOR 800Amp. |
57 | 33 KV BREAKER CONTROL PANEL |
58 | 33 KV BREAKER SET |
59 | 11 KV BUS COUPLER |
60 | 11 KV/110 W I/D TYPE PT FOR CAPACITOR BANK PANELS |
61 | G I WIRE6 /10 SWG |
62 | G I WIRE 8/10 SWG |
63 | Other material |
64 | Erection of single ST Poles (11/13 Mtr Long)alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site (All decentralize material shall be given by the contractor on his own cost.) |
65 | Erection of sectional double pole sectional ST Poles (11/13 Mtr Long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. (All decentralize material shall be given by the contractor on his own cost.) |
66 | Earthing with complete fitting |
67 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
68 | Grouting of Poles with 1:4:8CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
69 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
70 | Laying Stringing sagging & Binding of All size XLPE cable wher is required as per estimate/Resspo norms. |
71 | LT XLPE CABLE 3 × 70 |
72 | 11 KV XLPE CABLE 3 × 120 |
73 | 11 KV XLPE CABLE 3 × 185 |
74 | 11 KV XLPE CABLE 3 × 300 |
75 | LT XLPE Cable 1x400 AL |
76 | Installtion/Errection/Laying/stringing of the following items with complete fitting as per estimate/resspo norms. |
77 | 11 KV VCB I/C 600/300/5 A |
78 | 11 KV VCB O/G 400/200/5 A |
79 | 11 KV VCB I/C 1200/600/5A |
80 | 11 KV VCB O/G 600/300/5 A |
81 | 33 KV Vacume Circuit Brakar 1250 Amp. |
82 | 33 KV OUT DOOR PT |
83 | 33 KV LINE ISOLATOR |
84 | 33 KV BUS ISOLATOR 800Amp. |
85 | 33 KV BREAKER CONTROL PANEL |
86 | 33 KV BREAKER SET |
87 | 11 KV BUS COUPLER |
88 | 11 KV/110 W I/D TYPE PT FOR CAPACITOR BANK PANELS |
89 | 11 KV JOINTING KIT of different size I/D and O/D |
90 | 11 KV PIN INSULATER WITH PIN and NUT |
91 | 33 KV POLYMERIC PIN INSULATOR WITH PIN AND FITTING |
92 | 33 KVPOLYMERIC DISC INSULATORWITH PIN AND FITTING |
93 | 11 KV SPOUT |
94 | VACCUME INTRUPTER |
95 | 11 KV TPMO WITH COMPLETE FITTINGS |
96 | 33 KV TPMO WITH COMPLETE FITTINGS |
97 | AL-LUG 400 SQMM |
98 | RABBER MAT |
99 | 33 KV FUSE SET |
100 | 11 KV FUSE SET |
101 | 33 KV BUS BAR |
102 | 24 VOLT BATARY and Charger |
103 | Gaurding of H.T./L.T. line with complete fittings as per estimate/resspo norms (All the decentralize material shall be given by the contractor) |
104 | Boaring type Earthing for VCB(with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
105 | Boaring/Chemical type Pipe Earthing(with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
106 | Repairing of Plinth including dismounting/ disconnection of T/F from system as well as mounting/reconnection to the system after repairing as per Estimate/Resspo Norms .(All the required materialshall be given by contractor on his own cost.) |
107 | Earthing for line isolator (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
108 | Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job) |
109 | Carrage of scrap/conductor from site to store |
110 | Dismentaling old material |
111 | Dismentaling old line |
112 | Dismentaling of Burnt and damage VCB and carrage to store |
113 | Carriage of 400 KVA T/F from store to site and Mounting on trolly as well as connection with complete accessories |
114 | Disconnection and reconnection of 11 KV cable connection |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy