Madhyanchal Vidut Vitran Nigam Limited has published Tender For Work Related To Increasing The Capacity Of Distribution Transformers, Installation, Earthing, Plinth, Fencing And Protection Of Transformers Under The Business Plan 2024-25 Under Electricity Distribution Division-Iii (Karnailganj), Gonda Area.. Submission Date for this Tender is 21-05-2024. Electrification Work Tenders in gonda Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-May-2024 | date extension | Date | 21-05-2024 |
Sl. No. | Item Description |
1 | All these below items/materials from S.N. 1.01 to 1.35 will be given and errected by the contractor on his own cost as per estimate/Resspo Norms. |
2 | CLAMP FOR TOP, DROPPER AND T-OFF |
3 | LT CLAMP |
4 | M.S. NUT & BOLT |
5 | V TYPE X-ARM HOLDING CLAMP |
6 | Stone Pad |
7 | EYE HOOK |
8 | G.I. Pipe 6" Dia |
9 | 11 KV TPMO WITH COMPLETE FITTINGS |
10 | 33 KV TPMO WITH COMPLETE FITTINGS |
11 | D.O. FUSE SET (WITH CHANNEL AND CLAMP) |
12 | Earthing Complete |
13 | AL-LUG 400 SQMM |
14 | AL-LUG 240 SQMM |
15 | AL-LUG 120 SQMM |
16 | COPPER L - PIECE 62X250X12MM |
17 | COPPER L - PIECE 50X50X6MM |
18 | Dead - end Clamp |
19 | Pearsing Connector |
20 | I Hook WITH Holding Clamp |
21 | Suspension Clamp |
22 | 33 KV FUSE SET |
23 | 11 KV FUSE SET |
24 | LT Side FUSE SET |
25 | DISTRIBUTION BOX 3 PHASE |
26 | DISTRIBUTION BOX clamp |
27 | F- Bracket |
28 | EARTH ROD |
29 | MOG OTI & WTI Temp Indicator |
30 | PG CLAMP FOR LINE ISOLATOR |
31 | SUNDRIES (sand brick etc.) |
32 | GI STRIP |
33 | 33 KV CABLE HOLDING CHANNEL |
34 | TAILRESS FUSE UNIT 300A,650V COMPLETE SET |
35 | COPPER BUS BAR 750*50*6 MM |
36 | MS ANGLE FOR RESTING TAILRESS UNIT |
37 | Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.35) from Electricity Store Centre, Gonda to the work site/dump site (Distance up to 60 km) |
38 | PCC Pole 8.5 METER |
39 | ST POLE11 METER |
40 | 25 KVA T/F |
41 | 63/100 KVA T/F |
42 | 250/400 KVA T/F |
43 | ABC CABLE 3×50 |
44 | ABC CABLE 3×95 |
45 | ABC CABLE 3×120 |
46 | ACSR Weasel Conductor |
47 | 11 KV V-Type X-Arm |
48 | MS ANGLE |
49 | TOP CHANNEL |
50 | DROPER CHANNEL |
51 | SUB STATION BASE |
52 | PIN INSULATER WITH PIN and NUT |
53 | DISC INSULATER WITH FITTING |
54 | STAY SET COMPLETE |
55 | LT XLPE CABLE 3 × 70 |
56 | LT XLPE CABLE 3.5 × 150 |
57 | 11 KV XLPE CABLE 3 × 185 |
58 | LT XLPE Cable 2x240 AL |
59 | LT XLPE Cable 1x400 AL |
60 | 11 KV JOINTING KIT I/D FOR 3 × 185 |
61 | 11 KV straight through 3 × 185 |
62 | Stay Wire |
63 | T-OFF CHANNEL |
64 | 33 KV LINE ISOLATOR |
65 | 33 KV LIGHTNING ARRESTER |
66 | 33 KV Transformer Control Pannel For SINGLE TRANSFORMER |
67 | 33 KV BREAKER CONTROL PANEL |
68 | stay insulator |
69 | stay CLAMP |
70 | G I WIRE 7/10 SWG |
71 | 33 KV Vacume Circuit Brakar 1250 Amp. |
72 | Other material |
73 | Erection of single PCC/STP Poles (8.5/11 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site (All decentralize material shall be given by the contractor on his own cost.) |
74 | Erection of sectional double pole sectional PCC/STP Poles (8.5/11 Mtr Long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. (All decentralize material shall be given by the contractor on his own cost.) |
75 | Earthing with complete fitting |
76 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
77 | Grouting of Poles with 1:4:8CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
78 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
79 | 25 KVA T/F |
80 | 63/100 KVA T/F |
81 | 250/400 KVA T/F |
82 | Dismounting of following capacity T/F and Loading, Unloading and safe cartage of the following materials from the work site/dump site to Electricity Store Centre, Gonda (Distance up to 40 km) |
83 | 10/16/25 KVA T/F |
84 | 63/100/160 KVA T/F |
85 | 250/400 KVA T/F |
86 | Laying, Stringing & Sagging of ABC Cable up to proper sag for the following size cable as per estimate/resspo norms |
87 | ABC CABLE 3×50 |
88 | ABC CABLE 3×95 |
89 | ABC CABLE 3×120 |
90 | Laying Stringing sagging & Binding of All size XLPE cable wher is required as per estimate/Resspo norms. |
91 | LT XLPE CABLE 3 × 70 |
92 | LT XLPE CABLE 3.5 × 150 |
93 | 11 KV XLPE CABLE 3 × 185 |
94 | LT XLPE Cable 2x240 AL |
95 | LT XLPE Cable 1x400 AL |
96 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
97 | Installtion/Errection/Laying/stringing of the following itemswith complete fitting as per estimate/resspo norms. |
98 | 11 KV JOINTING KIT I/D FOR 3 × 185 |
99 | 11 KV straight through 3 × 185 |
100 | 33 KV LINE ISOLATOR |
101 | 33 KV LIGHTNING ARRESTER |
102 | 33 KV Transformer Control Pannel For SINGLE TRANSFORMER |
103 | 33 KV BREAKER CONTROL PANEL |
104 | 33 KV Vacume Circuit Brakar 1250 Amp. |
105 | G.I. Pipe 6" Dia |
106 | 11 KV TPMO WITH COMPLETE FITTINGS |
107 | 33 KV TPMO WITH COMPLETE FITTINGS |
108 | D.O. FUSE SET (WITH CHANNEL AND CLAMP) |
109 | AL-LUG 400 SQMM |
110 | AL-LUG 240 SQMM |
111 | AL-LUG 120 SQMM |
112 | COPPER L - PIECE 62X250X12MM |
113 | COPPER L - PIECE 50X50X6MM |
114 | 33 KV FUSE SET |
115 | 11 KV FUSE SET |
116 | LT Side FUSE SET |
117 | DISTRIBUTION BOX 3 PHASE |
118 | TAILRESS FUSE UNIT 300A,650V COMPLETE SET |
119 | COPPER BUS BAR 750*50*6 MM |
120 | CONSTRUCTION OF PLINTH as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
121 | CONSTRUCTION OF FENCING with Gate as well as standard painting as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
122 | Repairing of Plinth including dismounting and mounting of T/F from system and reinstallation as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
123 | Chemical type Earthing(with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
124 | Boaring type Pipe Earthing(with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
125 | BORE TYPE DELTA EARTHING depth 40 feet for control room with GI strip as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
126 | Earthing of 11 KV Panel (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
127 | Earthing for line isolator (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
128 | Earthing 33 KV cable (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
129 | Construction of cable trench as per Estimate/ Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
130 | Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job) |
131 | Dismentaling of Burnt and damage VCB and carrage to store |
132 | Carrage of scrap/conductor from site to store |
133 | Dismentaling old material |
134 | Dismentaling old line |
135 | Guarding of line |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail