| 1 | Erection/Fitment of Cathodic protection (Anodes) as per Drawing No. Nil. |
| 2 | Erection of window (fixed/sliding – 2/18 Nos. each) with drill holes, testing as required by surveyor as per Drg. No. SWL-27.5M-22 (Rev-0) |
| 3 | Erection of Scuttle (fixed) with drill holes, testing as required by surveyor as per Drg. No. SWL-27.5M-22 (Rev-0) |
| 4 | Fabrication / Erection of Guard Rail & Stanchion as per General Arrangement as well as required on board in way to access way as per Drg. No. Nil |
| 5 | Fabrication / Erection of Double Bollard on Main DK (FWD & AFT) along with insert plate and under DK stiffeners as per Drg. No. SWL-27.5M-21 (Rev-0) / I.S: 4374. Incomplete (materials to be supplied by SWL). |
| 6 | Fabrication / Erection of Hatch on M/DK (FWD & AFT), W.H. FWD (BHD) along with under DK carling as per Drg. No. SWL-27.5M-21 (Rev-0) / I.S. in complete (materials to be supplied by SWL). |
| 7 | Fabrication / Erection of Manholes with pad (water / oil) on M/DK (FWD & AFT), Tanks, Chain Locker along with carlings as per Drg. No. SWL-27.5M-21 (Rev-0) / I.S. in complete (materials to be supplied by SWL). |
| 8 | Fabrication / Erection of Vertical (9 Sets) / Rung Ladder (27 Nos. in 7 Sets.), in complete on board as per Drg. No. SWL-27.5M-21 (Rev-0) in complete (materials to be supplied by SWL). |
| 9 | Fabrication & Erection of Draft mark including Plimsoll marking as per Drg. No. SWL-27.5M-32 (Rev-0). |
| 10 | Load water line marking at side shell (P & S) as per Drg. No. Nil. |
| 11 | Fabrication / Erection of steel Water Tight (1 No.) / Non Water Tight (1 No. in two leafs) doors including frame, Hose testing up to surveyor satisfaction as per Drg. No. Nil |
| 12 | Fabrication & Erection of Steel half round side Fender (6” Dia) as per Drg. No. Nil. |
| 13 | Fabrication & Erection of Sea Chest Grid plate (P&S) including securing of cleat etc. as per Drg. No. SWL-27.5M-24 (Rev-0). |
| 14 | Fabrication & Erection of Ship’s Name and others as applicable. |
| 15 | Fabrication & Erection of Side Screen (P&S) for Side Light (standard). |
| 16 | Fabrication & Erection of Tyre Fender Cleat on Main Dk. |
| 17 | Fabrication & Erection of Main Mast including Arms, Light Bracket etc. in complete as per Drg. No. SWL-27.5M-33 (Rev.-0). |
| 18 | Fabrication & Erection of Brackets, Holders, Cleats etc. to secure the items belongs to Life saving, Light Sound Signals and Fire Control up to surveyor satisfaction as per Drg. No. Nil. |
| 19 | Fabrication & Erection of MS Chequred Plate including securing supports with MS Angle, Drilled/Tapped CSK screw and Nut & Bolts in complete. |
| 20 | Fabrication & Erection of Engine Room Locker. |
| 21 | Fabrication & Erection of Ramp Post (FWD & AFT) including insert plate and under deck stiffener as per Drawing No. SWL-27.5M-26 (Rev.-0) As follows: a) Fabrication at shop floor of above.b) Shifting of above. c) Erection of the same at the respective position.d) Survey satisfaction on board including test & trials. |
| 22 | Fabrication & Erection of Ramp Winch Foundation (FWD & AFT) including insert plate and under deck stiffener as well as Ramp handling system (Hoisting & lowering) on board in line with reference drawings by yard (Drg. No. SWL-27.5M-23 (Rev.-0), and OEM Drg. No. Nil including fitment / alignment of Hinge pin (10 Sets), accessories like pulleys, ropes etc. to comply smooth operation up to Survey / Owner satisfactiona) Fabrication at shop floor of above.b) Shifting of above. c) Erection of the same at the respective position.d) Survey satisfaction on board including test & trial. |
| 23 | Fabrication & Erection of Anchor Windlass Foundation (FWD & AFT) including insert plate and under deck stiffener as well as Anchor with Chain and Shackles, Perforated MS Plate, Spur-ling Pipe, Cow Catcher, End stopper etc.on board in line with reference drawings by yard and OEM (Drg. No. Nil) including fitment to comply smooth operation up to Survey / Owner satisfactiona) Fabrication at shop floor of above.b) Shifting of above. c) Erection of the same at the respective position.d) Survey satisfaction on board including test & trial. |