Capacity Increase Of 33/11 Kv Power Sub-Station Achalpur Chaudhary In Balrampur District (2X5mva) To (1X10mva+1×5Mva)/ Capacity Increase Of 33/11 Kv Power Sub-Station Kalpipara In Bahraich District (1X5mva + 1X10mva) To ( 2X10mva) / Capacity Increase Of 3, gonda-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Capacity Increase Of 33/11 Kv Power Sub-Station Achalpur Chaudhary In Balrampur District (2X5mva) To (1X10mva+1×5Mva)/ Capacity Increase Of 33/11 Kv Power Sub-Station Kalpipara In Bahraich District (1X5mva + 1X10mva) To ( 2X10mva) / Capacity Increase Of 3. Submission Date for this Tender is 21-05-2024. Substation Tenders in gonda Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43318010
Corrigendum : Capacity Increase Of 33/11 Kv Power Sub-Station Achalpur Chaudhary In Balrampur District (2X5mva) To (1X10mva+1×5Mva)/ Capacity Increase Of 33/11 Kv Power Sub-Station Kalpipara In Bahraich District (1X5mva + 1X10mva) To ( 2X10mva) / Capacity Increase Of 3
Open Tender
Indian
Uttar Pradesh
gonda
21-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Capacity Increase Of 33 / 11 Kv Power Sub-Station Achalpur Chaudhary In Balrampur District ( 2X5mva ) To ( 1X10mva+1×5Mva ) / Capacity Increase Of 33 / 11 Kv Power Sub-Station Kalpipara In Bahraich District ( 1X5mva + 1X10mva ) To ( 2X10mva ) / Capacity Increase Of 33 / 11 Kv Power Substation Ranjitpur In Bahraich District ( 2X5mva ) To ( 1X10mva + 1X5mva ) / Capacity Increase Of 33 / 11 Kv Power Substation Mahsi In Bahraich District ( 2X5mva ) To ( 1X10+1×5Mva ) / District , Capacity Increase Of 33 / 11 Kv Power Sub-Station Nawabganj In Bahraich ( 1X5mva ) To ( 2X5mva ) / Capacity Increase Of 33 / 11 Kv Power Sub-Station Matera In Bahraich District ( 1X5mva ) To ( 2X5mva ) / 33 / 11 Kva Power Sub-Station Bhakla In District Bahraich Capacity Increase From ( 1X5mva ) To ( 1X10mva ) / 33 / 11 Kva Power Substation In Bahraich District.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 16-May-2024 date extension Date 21-05-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 33000.0 /-
Tender Value
INR 32.99 Lakhs /-

Attachment

FileName File Description File Size
fc934afe-9d7c-403d-8fea-83e306014163.html Tender Notice 0 KB
13.pdf Tender Document 0 KB
BOQ_1596233.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work: ???? ???????? ??? 33/11 ??0??0 ??????? ????????? ?????? ????? ?? ???????????? (2x5MVA) To (1x10MVA+1x5MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ????????? ?? ???????????? (1x5MVA + 1x10MVA) To (2x10MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ???????? ?? ???????????? (2x5MVA) To (1x10MVA + 1x5MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ???? ?? ???????????? (2x5MVA) To (1x10+1x5MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ??????? ?? ???????????? (1x5MVA) To (2x5MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ????? ?? ???????????? (1x5MVA) To (2x5MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ???? ?? ???????????? (1x5MVA) To (1x10MVA)/???? ?????? ??? 33/11 ??0??0 ??????? ????????? ?????? ?? ???????????? (2x5MVA) To (1x5MVA+1x10MVA) ?????? ??????? ??????
Sl. No. Item Description
1Safe Loading carriage including unloading & proper stacking of following store materials from ESC Bahraich to site of work. (45 Km Approx) (33/11 KV Sub-station Nawabganj Distt-Bahraich.All the material in Item No.1.01 to 1.21will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
233 KV Bus Isolator 800 Amp, 33 KV
333 KV VCB 800A, 750MVA
433 KV CT 200/100/1A-1A-1A
5Single T/F Control Pannel
633 KV Post Insulator
733 KV Lightenning Arrestor
890 LBS rail Piece for T/F
911 KV Incoming Switch gear 400/200/5A,350 MVA, 24 Volt
1011 KV Outgoing Switch gear 200/100/5A, 350 MVA
1111 KV 3x300 mm2 XLPE cable
1211 KV 3x120mm2 XLPE cable
13ST Pole (11 Mtr long)
14ACSR DOG Conductor
15SteelSections(M.S Channel, M.S. Angle etc)
1611 KV cable jointing kit indoor 3x300sq mm xlpe
1711 KV cable jointing kit outdoor 3x300sq mm xlpe
1811 KV cable jointing kit indoor 3x120sq mm xlpe
1911 KV cable jointing kit outdoor 3x120sq mm xlpe
2011 KV Bus Coupler
21stay set Complete
2211 KV Polymeric Pin Insulator
23Safe Loading carriage including unloading & proper stacking of following store materials from ESC Bahraich to site of work. (48.00 Km Approx) (33/11 KV Sub-station Matera Distt-Bahraich). All the material in Item No.2.01 to 2.21will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
2433 KV Bus Isolator 800 Amp, 33 KV
2533 KV VCB 800A, 750MVA
2633 KV CT 200/100/1A-1A-1A
27Single T/F Control Pannel
2833 KV Post Insulator
2933 KV Lightenning Arrestor
3090 LBS rail Piece for T/F
3111 KV Incoming Switch gear CTR 600/300/5A,350MVA, 24 Volt
3211 KV Outgoing Switch gear 200/100/5A, 250 MVA
3311 KV 3x300 mm2 XLPE cable
3411 KV 3x120mm2 XLPE cable
35ST Pole (11 Mtr long)
36ACSR DOG Conductor
37SteelSections(M.S Channel, M.S. Angle etc)
3811 KV cable jointing kit indoor 3x300sq mm xlpe
3911 KV cable jointing kit outdoor 3x300sq mm xlpe
4011 KV cable jointing kit indoor 3x120sq mm xlpe
4111 KV cable jointing kit outdoor 3x120sq mm xlpe
4211 KV Bus Coupler
43stay set Complete
4411 KV Polymeric Pin Insulator
45Safe Loading carriage including unloading & proper stacking of following store S/S materials from ESC Bahraich to site of work. (35.00 Km Approx) (33/11 KV Sub-station Parsura Distt-Bahraich). All the material in Item No.3.1will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
46Single T/F Control Pannel
47Safe Loading carriage including unloading & proper stacking of following store materials from ESC Shravasti to site of work. (40 Km Approx) (33/11 KV Sub-station Bhakla Distt-Bahraich). All the material in Item No.4.01 to 4.14will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
4811 KV 3 Core cable 3x300mm XLPE
4911KV cable jointing kit indoor 3x300sq.mm XLPE
5011KV cable jointing kit outdoor 3x300sq.mm XLPE
5111 KV 3 Core cable 3x120mm XLPE
5211KV cable jointing kit indoor 3x120sq.mm XLPE
5311KV cable jointing kit Outdoor 3x120sq.mm XLPE
5411 KV Outgoing swithgear 200/100/5 Amp. 350MVA
55STP 11 Mtr. Long
56MS Channel cross arms 100x50x2240mm (Top Channel)
57MS Angle Iron 65x65x6mm, 2700 mm long bracing with 4 clamp
58Earthing of Pole by MS earthing rod of 20x2500 mm and 6 SWG earthing wire etc
5911 KV Disc Insulator T&C type (45 KN) (Polymeric)
6011 KV Pin Insulators (Polymeric)
61Stay complete (Stay rod 16x1800mm, Stay wire 5 kg, stay clamp, bolt & nut with grouting)
62Safe Loading carriage including unloading & proper stacking of following store materials from ESC Bahraich to site of work. (45 Km Approx) (33/11 KV Sub-station Mahasi Distt-Bahraich). All the material in Item No.5.01 to 5.16will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
6311 KV 3 Core cable 3x300mm XLPE
6411KV cable jointing kit indoor 3x300sq.mm XLPE
6511KV cable jointing kit outdoor 3x300sq.mm XLPE
6611 KV 3 Core cable 3x120mm XLPE
6711KV cable jointing kit indoor 3x120sq.mm XLPE
6811KV cable jointing kit Outdoor 3x120sq.mm XLPE
6911 KV Outgoing swithgear 200/100/5 Amp. 350MVA
70STP 11 Mtr. Long
71MS Channel cross arms 100x50x2240mm (Top Channel)
72MS Angle Iron 65x65x6mm, 2700 mm long bracing with 4 clamp
73Earthing of Pole by MS earthing rod of 20x2500 mm and 6 SWG earthing wire etc
7411 KV Disc Insulator T&C type (45 KN) (Polymeric)
7511 KV Pin Insulators (Polymeric)
76Stay complete (Stay rod 16x1800mm, Stay wire 5 kg, stay clamp, bolt & nut with grouting)
7733 KV Lightenning Arrestor
7833 KV VCB 800A, 750MVA
79Safe Loading carriage including unloading & proper stacking of following store materials from ESC Bahraich to site of work. (45 Km Approx) (33/11 KV Sub-station Ranjeetpur Distt-Bahraich). All the material in Item No.6.01 to 6.03 will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
8011 KV 3 Core cable 3x300mm XLPE
8111KV cable jointing kit indoor 3x300sq.mm XLPE
8211KV cable jointing kit outdoor 3x300sq.mm XLPE
83Safe Loading carriage including unloading & proper stacking of following store materials from ESC Bahraich to site of work. (45 Km Approx) (33/11 KV Sub-station Kalpipara Distt-Bahraich. All the material in Item No. 7.01 to 7.03will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
8411 KV 3 Core cable 3x300mm XLPE
8511KV cable jointing kit indoor 3x300sq.mm XLPE
8611KV cable jointing kit outdoor 3x300sq.mm XLPE
87Safe Loading carriage including unloading & proper stacking of following store materials from ESC Balrampur to site of work. (45 Km Approx) (33/11 KV Sub-station Aanchalpur Chaudhari Distt-Balrampur). All the material in Item No.8.01 to 8.16will be given by department and rest all the material including Decentralize material (which is not given by store) and civil material will be given by the contractor himself on his own cost.
8811 KV 3 Core cable 3x300mm XLPE
8911KV cable jointing kit indoor 3x300sq.mm XLPE
9011KV cable jointing kit outdoor 3x300sq.mm XLPE
9111 KV 3 Core cable 3x120mm XLPE
9211KV cable jointing kit indoor 3x120sq.mm XLPE
9311KV cable jointing kit Outdoor 3x120sq.mm XLPE
9411 KV Outgoing swithgear 200/100/5 Amp. 350MVA
95STP 11 Mtr. Long
96MS Channel cross arms 100x50x2240mm (Top Channel)
97MS Angle Iron 65x65x6mm, 2700 mm long bracing with 4 clamp
98Earthing of Pole by MS earthing rod of 20x2500 mm and 6 SWG earthing wire etc
9911 KV Disc Insulator T&C type (45 KN) (Polymeric)
10011 KV Pin Insulators (Polymeric)
101Stay complete (Stay rod 16x1800mm, Stay wire 5 kg) etc
10233 KV Lightenning Arrestor
10333 KV VCB 800A, 750MVA
104Plinth of 5 MVA, for 33/11 KV T/Fs- Constructionof Plinth of size 3.46x3.46 Mtr suitable for 5 MVA to 10 MVA T/FPlinth decided by E/I.Thework includes Excavationoffoundation,base concreting in C.C. 1:6:12 ratio (cement,coarse sandandbrickballast) IstClassbricksworkincementmortarofratio1:4 foundation, C.C.in 1:4:8 ratio (cement,coarse sand and brick ballast)and RCCworkingratio 1:2:4 (cement,coarsesandandstonegritof20mmgauge) usingMSBars of10mmDia (Tor) in reinforcement including itscutting,bending and bindinginrequiredshape.Theworkalso includeslayingof2Nos.3.46 mtslongeachrailpiecescompletewith cutting,weldingand proper fitting etc.ThePlinthwillbe madeas perDrawingand shallbe plastered/ finished on Top and Side of the Plinth.
105Fabrication, Erection & Grouting of Sub Station Structure
106Bus Isolator Structure - Fabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x0.9 xO.3 Mtr providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC (cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 mtx 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, shifting upto 40 Mtr., Raising and erecting the two legs with runner of Isolator in proper allingment level and plumb. Both Plinths of the Isolator structure shall be properly finished with champering of edges.
107Lightening Arrestor Structure - Fabrication of Lightening Arrestor per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 xO.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC (cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr x 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, shifting upto 40 Mtr. Raising and erecting the two legswith Top frame above structure"s in proper allignment level and plumb. Both Plinths of the structure shall be properly finished with champering of edges etc.
108Post Insulator/C.T. Structure - Fabrication of Post Insulator per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.3 x O.3 Mtr providing stone pad at the bottom of the pit and grouting of two legs of the above structure in CC (cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 Mtr x 0.3 Mtr x 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with Top frame above structure"s in proper allingment level and plumb. Both Plinths of the structure shall be properly finished with champering of edges etc.
109Plinth for 33 KV VCB - Construction of Plinth of 2.0X1.5X0.9(mtr) suitable for erection of super structure 33 KV VCB including grouting of Anchor boards in proper alligntment and level. Scope of work incluldes exvacation of foundation base concreting base CC 1:6:12(cement, Coarse sand and brick ballast) first class brick work in cement mortar of ratio 1:4 CC in ratio 1:4:8 and RCC work in ration 1:2:4(Cement, coarse sand and stone grid of 20 mm gaze) as per drawing.
110Hiring of 3 phase diesel generator Set 02 nos. including Carriage,Loading, unloading operating charges (with fuel) at 33/11 KV Substation Under Construction in case L.T. Supply is not available near S/s within prescribed accessible limit. 63 KVA, There phase D/G Set for fabrication and other work .
111Removal of existing 5 MVA Transformer and other accessories/equipments.
112Disconnecting HT cable connection from 33KV side & 11KV side of 05 MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11 KV cable support structure, Nutral stand etc.
113Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
114Disconnecting Earthing strip from body of 05 MVA Power transfomer.
115Draining of transformer oil from conservator, radiators of existing 05 MVA Power T/F, into the dry & clean drums and stacking at the safe place in Substation outside of switchyard.( Empty drums shall be provided by contractor.)
116Removal of conservator, radiators and other accessories from on existing 05 MVA Power transformer.
117Safe shifting of 05 MVA Power transformer main body from plinth and other accessories to outside the switchyard at suitable place in Substation as assigned by concerning J.E/S.D.O. (Distribution).
118Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
119Re-filling the transfomer oil (old & used) in existing 5 MVA T/F.
120Erection and Installation Of 33/11 KV 5 MVA/10MVA Transformer
121Erection and installation of 33/11 KV, 5 MVA/10 MVA Transformer in a leveled position on the Plinth. The work include shifting of transformer to the site of installation with in the Sub-Station premises, assembling, fixing and fitting of all accessories and filling of transformer oil to the desired level and ensuring that there is no leakage.
122Fabrication and grouting of M.S.Angle 50x50x6 mm in L shape & in proper size and allignment to provide support for the two separate earthing strips for Power Transformer Neutral including supply & fixing of two Nos Flexible Copper bonds for neutral earthing.
123Fabrication and erection of cable support made of two pieces of M.S. Strip 50 x 50 x 6 mm, 3.0 Mtr long joined to each other by means of 5 Nos M.S. Flat 5Ox6mm pieces of size 150 mm long each by welding at equal intervals as per drawing and grouting in a block of size 300 x 300 x 700 mm complete with one coat of ready mixed primer and two coats of Alluminum Paint. This includes providing of four Nos. M.S.clamp made of M.S. flat for holding the Cable including nuts and Bolts and fixing of XLPE cable.
124Special Delta Earthing by way of boring and lowering of "B" class G.I. pipe 50mm Dia, 20Mtr long from ground upto the water leve.The G.S. strip size 50X6mm will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect.
125Body earthing of 5 MVA T/F
126Neutral of Transformer
127Lightening Arrestor
128Installation of Isolators - Assembling and installation of Bus isolator on the Isolator structure, adjusting of opening mechanism in proper alignment so as to ensure smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
129Installation of lightning Arrestors- Assembling and installation/ mounting of three Nos. Lightening Arrestors on the L.A. structure/ complete with making earth connection (Separate) and line connections. The work includes fabrication for proper fixing if required.
130Installation of Post Insulator - Installation of 3 Nos Post Insulators on the post insulators. The work includes fabrication for proper fixing if required
131Installation of CT"s - Installation of 3 no. CT"s of ratio 200/100/1 amp. On the Ct"s structure. The work includes fabrication for proper fixing if required.
132Installation of VCB - Installation of 33 kv VCB 800 amp capacity complete in all respect including commissioning.
133Installation of Switchgears &11 KV Bus Coupler in Control Room-
134Shifting, carefully and safely 11 KV Switchgear from out side of the , switch gear room, Including grouting the two Nos. 100x50x6mm channels pieces (each 800mm long including cutting to size) and, foundation Bolts in 1:2:4 CC(Including cutting of CC of the floor and finishing of Floor) as per direction of Engineer Incharge, Placing and fixing of switchgear on foundation providing nuts & bolt of proper size in proper position in the alignment and filling of oil in tank after cleaning and checking, complete work with mounting of P.T. on incoming S/G.
135Fixing and making Bus Bar connection in between all switchgears after cleaning and tapping with H.T. tape, Empire tape and PVC tape properly Providing and fixing of 6mm thick bakelite seperators and plugging of all opening and holes with plastic compound. complete work including cost of all material ( Except Copper Bus Bars) Strictly to the satisfaction of site incharge
136Shifting carefully and installation of 33 KV single/double TransformerControl Pannel in room including grouting of above and its proper connection.
137Earthing of 11 KV & 33 KV Switchgear
138Earthing of all indoor equipment by providing and laying G.S. strip 50 x 6 mm including cutting, welding, bendingetc.
139Providing and laying of G.S. strip of size 50x6mm for connecting the earth mat with the super structure as well as body and neutral of power T/F, 33 kv VCB, C.T. structure, L.A. structure, post insulator structure up to equipments including digging of trench 500x750mm (approx) deep till existing earth mat, bending, cutting, straightening and welding of the earth strip with the earth mat and various street structure using high quality Arc welding. The work include proper overlapping of the strip and jointing by welding .
140H.T. Cable Laying -
141Laying & dressing of 11 KV, 3x300 Sq.mm XLPE Cable underground from 5 MVAT/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable.
142Laying & dressing of 11 KV, 3x120 Sq.mm ground cable in the trench 450mm wide, 900mm deep, providing 150mmfine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Sparecable shall be left and buried in the trench in the safe of rings at both ends. For the protection of the cable 100mmDia G.I.pipe has to be worn on the Cable where the cable is to be laid across PUCCA/Main Road/ Nallah. Cable laying work includes supply of G.I.Pipe, unrolling, cutting, meggring & sealing both ends of the cable.
143Hoisting of 11 KV cable, cable box, fixing with clamp nut & bolt with proper clamping with provision of G.I. pipe 3 mtr long of 150 mm dia.(All material will be supplied by the contractor)
144Supply ,Fixing and fabrication and erection of cable jointings kits suitable for following sizes of 11 KV XLPE cable of 11 KV cables. With housing of 3.5Mtr long 100 sq.mm. Dia G.I.pipe with feeder cable at feeder D/P.
14511 KV 3x300 sq.mm. indoor jointing kit
14611 KV 3x300 sq.mm.outdoor jointing kit
14711 KV 3x120 sq.mm. indoor jointing kit
14811 KV 3x120 sq.mm. outdoor jointing kit
149Erection & Grouting of 2 Nos 11Mtr STP support for making D/P structure Including fabrication, Fixing of MS Channel, M.S. angle etc. The work Includes supply and fixing of necessary clamp with nut, bolts and washers & Stay set including grouting. The work also includes grouting of double pole supports in CC 1:4:8 in block of size 0.45Mtr into 0.45Mtr into 2.0Mtr earthing of Double pole with M.S. earthing rod, complete in all respect. Painting of one Coat of Red Oxide Primer and Two Coats of Aluminum paint of good quality. (All material excluding 2 Nos of STP will be provided by contractor.)
150Supply & Laying of 2x2.5 sq.mm./ 4x2.5 sq.mm. control cables in trench & related all the work complete in all respect.
151Construction of control cable Trench Pacca by Coarse sand, Bricks & cementin size ( 300 mm wide x 450 mm depth) with cover as per Norms
152Laying and Fixing of lnterlocking Bricks in the Switchyard 1.5 Mtr wide. Making approach path after Proper leveling and finishing etc.The work includes cost of all the material.
153Painting of Structure Painting of following structure with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. The work includes cost of all the material.
154Bus/Line Isolator Structure
155Lightening Arrestor
156Post Insulator Structure
157Cable Stand
158Neutral Stand
159VCB & CT Structure
160Supply, fixing and mounting of following equipments/ items in the control room
161Rubber matting one side chequered and other side plane size 1800x900x12mm
162Rubber hand gloves
163Commissioning of 01 No. 5MVA T/F / 10 MVA T/F and its eqipments installed in switchyards and 11 KVIncoming and Outgoing Pannels complete in all respect upto energising.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail