Tender For The Work Of Saturation (Straightening) Of 11 Kv Luktara, Jari, Paparenda, Kanwara Feeders Under Eudd, Banda (Business Plan 2024-25), banda-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For The Work Of Saturation (Straightening) Of 11 Kv Luktara, Jari, Paparenda, Kanwara Feeders Under Eudd, Banda (Business Plan 2024-25). Submission Date for this Tender is 21-05-2024. Electrification Work Tenders in banda Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43317950
Corrigendum : Tender For The Work Of Saturation (Straightening) Of 11 Kv Luktara, Jari, Paparenda, Kanwara Feeders Under Eudd, Banda (Business Plan 2024-25)
Open Tender
Indian
Uttar Pradesh
banda
21-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For The Work Of Saturation (Straightening) Of 11 Kv Luktara, Jari, Paparenda, Kanwara Feeders Under Eudd, Banda (Business Plan 2024-25)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 13-May-2024 Date Extension Corrg. Date 16-05-2024
2 16-May-2024 Date Extension Cor. Date 21-05-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 25000.0 /-
Tender Value
INR 25 Lakhs /-

Attachment

FileName File Description File Size
0c2fc3ed-1fb1-4efe-a8aa-929af8851dc8.html Tender Notice 0 KB
BOQ_1596270.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Tendernotice_2.pdf Tender Document 0 KB
Tender_Document_SED2324_1_1.rar Tender Document 0 KB

BOQ Items

Name of Work: fo0u0fo0[ka0] ckank ds vUrxZr 11 ds0oh0 yqDrjk] tkjh] iijsUnk] duokjk QhMjksa ds lqn`<+hdj.k ¼LVªsaFkfuax½ dk dk;ZA
Sl. No. Item Description
1The work of erection & repairing of 11 KV Lines and replacement of damaged electrical parts due to straightening of damaged/jarjar OH lines from Chilla Road Power House to Pathari, Gureh, Luktara, Darda/Chakchatghan of 11 KV Luktara, Jari, Paprenda, Kanwara Feeders UNDER BUSINESS PLAN YEAR 2024-25 under EUDD, BANDA, including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Details of the work as given below :-
2SUPPLY OF MATERIAL -
3Cross Arm Holding Clamp with Nut-Bolts for PCC 8.5 M Long
411 KV F-Clamp wih Nut-Bolts for PCC Poles 8.5 M Long
511 KV F-Clamp wih Nut-Bolts for STP Poles 13 M Long
6MS Top Channel 100x50x2240 mm
7Clamp with Nut-Bolts for Channel
8MS Angle Iron 65x65x6 mm, 2700 mm Long Bracing with 4 Clamps & Nut-Bolts.
9MS T-Off Channel
10Danger Board with clamp & Nut/Bolt
11Barbed Wire
12Nut, Bolt & Washer of suitable sizes
13ERECTION WORK -
14Erection & fixing of ST Pole 13.0 Mtr. Long as single/double pole structure with HT/LT fittings.
15Erection & fixing of PCC Pole 8.5 Mtr. Long as single/double pole structure with HT/LT fittings.
16Erection & fixing of 11 KV V Type Cross Arm
17Erection & fixing of Cross Arm Holding Clamp with Nut-Bolts for PCC 8.5 M Long
18Erection & fixing of 11 KV F-Clamp wih Nut-Bolts for PCC Poles 8.5 M Long
19Erection & fixing of 11 KV V Type Cross Arm 100x50x6 mm.
20Erection & fixing of 11 KV F-Clamp wih Nut-Bolts for STP Poles 13 M Long
21Erection & fixing of MS Top Channel 100x50x2240 mm
22Erection & fixing of Clamp with Nut-Bolts for Channel
23Erection & fixing of MS Angle Iron 65x65x6 mm, 2700 mm Long Bracing with 4 Clamps & Nut-Bolts.
24Erection & fixing of MS T-Off Channel
25Erection & fixing of 11 KV Pin Insulator
26Erection & fixing of 11 KV Pin with nut
27Erection & fixing of Disc Insulator
28Erection & fixing of Disc fitting T&C 45 KN
29Laying, sagging, stringing, binding and jumpering etc. of ACSR DOG Conductor on the erected pole as per direction of supervising engineer/RESSPO manual.
30Laying, sagging, stringing, binding and jumpering etc. of ACSR Weasel Conductor on the erected pole as per direction of supervising engineer/RESSPO manual.
31Erection & fixing of Danger Board with clamp & Nut/Bolt
32Erection & fixing of Barbed Wire
33Erection & fixing of GI Wire 8 SWG for guarding
34Erection & fixing of Stay Set Complete
35EARTHING OF POLE BY EARTHING ROD
36Concreting/Grouting of erected 8.5/11/13 Mtr. long PCC/STP Poles with muffing as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast /stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
37Straightening of tilted polesas 8.5/11/13 Mtr. Long PCC/ST Pole at various places.
38Re-sagging of loose conductor of 11 KV HT/LT lines at various places.
39Dismentalling of line material/poles and deposit to central store.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail