South Eastern Coalfields Limited-SECL has published Tender For Making Brick Masonry Low Height Boundary Wall Along Road From Shramik Chowk To Dipka Thana Chowk Under Gevra Project Of Gevra Area.. Submission Date for this Tender is 22-05-2024. Masonary Work Tenders in Korba Chhattisgarh. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
5a9fbf77-45af-4fa3-b565-bda82da2d800.html | Tender Notice | 0 KB |
BOQ_318599.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tendernotice_2.pdf | Tender Document | 0 KB |
Tendernotice_3.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Item Description/ Heading |
2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size) |
4 | Brick work with non modular fly ash bricks conforming to IS:12894, of class designation 10 average compressive strength in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand) |
5 | Brick work with non modular fly ash bricks conforming to IS:12894,class designation 10 average compressive strength in super structure above plinth level up to floor V level in :Cement mortar 1:6 (1 cement : 6 Coarse sand) |
6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
7 | CEMENT PLASTER (IN FINE SAND)1:6 (1 cement: 6 fine sand) |
8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. |
9 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
10 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail