Restoration Of Roads Under The Jurisdiction Of Pmgsy Division On Emergency Basis By Way Of Clearance Of Snow / Slips/ Creates Work Likely To Occur During Financial Year 2024-25 Oni. Mendhar To Jaranwali Gali, Package No: Jk 11-146,Effective Length - 8.000
Tender Overview
Project Description
Restoration Of Roads Under The Jurisdiction Of Pmgsy Division On Emergency Basis By Way Of Clearance Of Snow / Slips / Creates Work Likely To Occur During Financial Year 2024-25 Oni. Mendhar To Jaranwali Gali, Package No: Jk 11-146, Effective Length - 8.000 Kms.Ii. Km 18Th Of T02 To Gursai Middle, Package No: Jk 11-156, Effective Length - 4.00 Kms.Iii. Km 10Th Of T02 To Gursai Lower, Package No: Jk 11-134, Effective Length - 3.000 Kms.Iv. Km 16Th Of T02 To Parat , Package No: Jk 11-115, Effective Length - 2.000 Kms.Total Roads Length - 17.000 Kms
BOQ
| Sl. No. | Item Description |
| 1 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201 Girth above 300 mm to 600 mm |
| 2 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 |
| 3 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2 |
| 4 | A) Excavation in hilly areas in hard rock notrequiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2 |
| 5 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material |
| 6 | Polygonal Rubble masonry brought to course, laid dry, with nallah stone, in Foundation & Plinth/substructure, incl. cost of through /Bond stonesIncluding all carriages by Mechanical Transport, leads and lifts etc complete |
| 7 | Backfilling behind return wall /B/wall / Create Work complete job 60 % Stone & 40 % Earth including Carriage with complete Job |
| 8 | Providing and laying reinforced cement concrete NP3 pipes conforming to IS 458:2003 for culverts material in single row including fixing collar withcement mortar 1:2 ( 1 cement : 2 sand) excluding excavation protection works, back filling cement concrete and masonrywork in head walls parapetsclause 1106 but including all leads ,lifts, carriageshandling re-handling and including cost of pipes complete 1000mm dia. Including all carriages by Mechanical Transport, leads and lifts etc complete |
| 9 | Providing and laying reinforced cement concrete NP3 pipes conforming to IS 458:2003 for culverts material in single row including fixing collar withcement mortar 1:2 ( 1 cement : 2 sand) excluding excavation protection works, back filling cement concrete and masonrywork in head walls parapetsclause 1106 but including all leads ,lifts, carriageshandling re-handling and including cost of pipes complete 750mm dia. Including all carriages by Mechanical Transport, leads and lifts etc complete |
| 10 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to 15:200 and 15:4826 in 100 mm x 100 mm mesh (woven diagonally) Including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301Including all carriages by Mechanical Transport, leads and lifts etc complete |
| 11 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2Including all carriages by Mechanical Transport, leads and lifts etc complete |
| 12 | Slip Clearance in Soils mixed with moorum/Kankar/ Shingle /Boulders; disposal lead upto 50 m and lift upto 1.5m. |
| 13 | Slip Clearance in Soils mixed with Decomposed Rocks by blasting or any other means. |
| 14 | Snow Clearance by Mechinical Means using Machines as Specified or equivalent.A) Snow Plough 4WD 60 BHP (Trucks) |
| 15 | B) SnowCat |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents