Military Engineer Services-MES has published Tender For 82606 Comprehensive Maintenance Of Dg Sets At 2N Det Under Age(I) (Navy) Chennai. Submission Date for this Tender is 23-05-2024. Diesel Generators Tenders in chennai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 14-May-2024 | Amendment | Other | 23-05-2024 |
FileName | File Description | File Size |
a881105c-8b35-4c64-963c-86b6f5721077.html | Tender Notice | 0 KB |
82606Generalpages.pdf | Tender Document | 0 KB |
82606PS.pdf | Tender Document | 0 KB |
BOQ_729958.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | SCHEDULE "A" PART-I [ E/M WORKS] |
2 | Comprehensive maintenance of DG set (No 1 &2)62.5 KVA installed at 2N DET Vellachi including attending to jobs as mentioned under item No.2 to 2.16here in complete all as specified and as directed.LOC 2 N DET- 02 NOS, Existing DG -02 No Make: Kirloskar Note: Quoted Rates are deemed to be for carrying out A checks as detailed below. |
3 | Checking the fan belt and adjusting tension |
4 | Checking the fuel and oil filter |
5 | Checking the air filter including cleaning and refixing |
6 | Checking of FIP oil level |
7 | Tightening the base bolts and nuts |
8 | Checking the coupling bolts and adjustment checking the self starter and Dynamo |
9 | Checking the battery distilled water levels and topping upto the required level. |
10 | Checking the panels (Manual as well as AMF) attached to the DG set for loose connections, defects if any in the panel Board and replacement of spares all as directed. |
11 | Checking the anti vibration mounting and adjusting the bolt. |
12 | Checking the radiator and radiator hose and arresting leak if any |
13 | Checking the engine oil level and topping upto the required level |
14 | NOTES:- (i) Control switches , MCCB"s, contactors, multi display meters , Engine control unit shall be out of scope of the item of work and the rate quoted shall be exlusive for servicing/ maintenance of the above item of work. |
15 | (ii) Servicing of DG set alongwith connected Alternator and Panel Board including "A" check of the Engine shall be carried out once in every month (Except during the month when "B" check is carried out) as directed by the Engineer-in-Charge and the Contractor shall carry out periodical inspections during the maintenenace period and shall be responsible for the smooth functioning of the DG set for a period of 30 days from the date of service and shall also attend all the maintenence / breakdown repairs as and when required in that period except in case of major repairs. |
16 | (iii) Spare parts required for replacement during the maintenance period shall be measured and paid separately at supply only rates and cost of labour for fixing these spares shall be deemed to be inluded in the rate quoted. |
17 | (iv) Cost of all consumables required during the maintenance period shall be deemed to be included in the rate quoted for this item. |
18 | (v) List of checks to be carriedout under "A" check is attached to the Particular specifications. |
19 | Comprehensive maintenance of DG set 500 KVA installed at SMU 2 N DET including attending to jobs as mentioned under item No.2.01 to 2.16here in complete all as specified and as directed. Existing DG -01 No Make: Kirloskar Note: Quoted Rates are deemed to be for carrying out A checks as detailed above. |
20 | Maintanance and servicing of following Diesel Generator sets by carrying out routine "B" check of the engine including items covered in "A" check complete for smooth functiuning all as per manufacturer"s instructions and as directed for 62.5 KVA installed at 2 N DET . Existing DG -02 No Make: Kirloskar Note: Quoted Rates are deemed to be included for carrying out B checks as under. |
21 | NOTES:- (i) Control switches , MCCB"s, contactors, multi display meters , Engine control unit shall be out of scope of the item of work and the rate quoted shall be exlusive for servicing/ maintenance of the above item of work. |
22 | (ii) "B" check shall be carried out once in every six months or 250 hours of running of DG Set whichever is earlier. Servicing of DG Set alonwith connected Alternator and Panel Board including items covered in "A" check of the Engine shall also be carried out in that month as directed by the Engineer-in-charge and the Contractor shall carry out periodical inspections during the maintenance period and he shall be responsible for the smooth functioning of the DG Set for a period of 30 days from the date of service and shall also attend all the maintenance / breakdown repairs as and when required in that period except in case of Major repairs. |
23 | (iii) Spare parts , engine oil and radiator coolant oil required during the maintenance period shall be measured and paid seperatly at supply only rates and cost of labour for fixing these spares/filling of oils shall be deemed to be included in the rate quoted for this item. |
24 | (iv) Cost of all consumables, diesel / oil filters etc., required during the maintenance period shall be deemed to be included in the rate quoted for this item. |
25 | (v) List of checks to be carriedout under "B" check is attached to the Particular specifications. |
26 | Comprehensive maintenance of DG set 500 KVA installed at SMU 2N Detincluding attending to jobs as mentioned under item No.4.01 to 4.05here in before complete all as specified and as directed. Existing DG -01 No Make: Greaves Note: Quoted Rates are deemed to be for carrying out B checks as detailed above. |
27 | Checking the tappet clearance and adjustment of valve including replacement of tappet gasket for following DG Sets :- |
28 | DG Set of capacity 62.5 KVA |
29 | DG Set ofcapacity 500 KVA. |
30 | Supply only fuel filter pre and secondary including rubber gasket for following DG sets (Cost of replacement deemed to be included in the maintenance part of the DG set) |
31 | DG Set of capacity 62.5KVA |
32 | DG Set ofcapacity500 KVA. |
33 | Supply only lube oil filter including rubber gasket for following DG sets (Cost of replacement deemed to be included in the maintenance part of the DG set) |
34 | DG Set of capacity 62.5KVA |
35 | DG Set ofcapacity 500 KVA. |
36 | Supply only air filter element including rubber gasket for following DG sets (Cost of replacement deemed to be included in the maintenance part of the DG set ) |
37 | DG Set of capacity 62.5KVA |
38 | DG Set ofcapacity 500 KVA. |
39 | Supply only fan belt of existing size for following DG sets (Cost of replacement deemed to be included in the maintenance part of the DG set) |
40 | DG Set of capacity 62.5KVA |
41 | DG Set ofcapacity 500 KVA. |
42 | Supply only Radiator hose with clip of existing size for following DG sets (Cost of replacement deemed to be included in the maintenance part of the DG set) |
43 | DG Set of capacity 62.5KVA |
44 | DG Set ofcapacity 500 KVA. |
45 | Supply only rubber coupling of existing size forDG sets of capacity 62.5 KVA (Cost of replacement deemed to be included in the maintenance part of the DG set) |
46 | Supply and toping up the following items for the DG sets (Cost of replacement deemed to be included in the maintenance part of the DG set) |
47 | Engine oil 20 W 40 |
48 | Distilled water |
49 | Battery acid |
50 | Coolant |
51 | Benzo bolt with washer |
52 | Jubilee clamp for fuel pipe |
53 | Fuel Flexible pipe with brass or GM adaptor |
54 | Oil Flexible pipe with brass or GM adaptor |
55 | Flexible reinforced pressure pipe 3/8" dia. |
56 | Flexible reinforced pressurepipe 1/2" dia. |
57 | Flexible reinforced pressurepipe 1" dia. |
58 | Supply and Cladding with glass/rock wool and aluminium sheets of exhaust manifold forDG Set of capacity 62.5KVA including removing of existing asbestos rope or any other type of insulation. |
59 | Supply and fixing of Expansion bellow for exhaust manifold for DG Set of capacity 62.5KVA including removing of existing complete all as specified and directed |
60 | Draining the engine oil from sump removing the tankcover cleaning the sludge and refixing the same including replacement sump gasket and filling oil for the following Gen sets as per manufactures instructions |
61 | DG Set of capacity 62.5KVA |
62 | DG Set ofcapacity 500 KVA. |
63 | Dismantling the fuel pump from the Engine, transportng to the service center and complete servicing and overhauling of the pump including replacement of service kit ,element, delivery valve, plunger, copper washer etc all as required including re-calibration, refixing and testing complete. |
64 | DG Set of capacity 62.5KVA |
65 | DG Set ofcapacity 500 KVA. |
66 | Dismantling the water pump from the Engine and supply and fixing new water pump of existing size and testing complete. |
67 | DG Set of capacity 62.5KVA |
68 | DG Set ofcapacity 500 KVA. |
69 | Dismantling the fuelpump from the Engine and supply and fixing new fuelpump of existing size and testing complete. |
70 | DG Set of capacity 62.5KVA |
71 | DG Set ofcapacity 500 KVA. |
72 | Draining out the diesel tank, cleaning / washing out the sludge and re-filling with diesel for following DG set:- |
73 | DG Set of capacity 62.5KVA |
74 | DG Set ofcapacity 500 KVA. |
75 | Taking downradiator, servicing, cleaning of with suitable reagent, washing thoroughly,arresting leakage if any by welding / brazing and refixing the same (Necessary coolant and distilled water required will be measured and paid seperately . |
76 | DG Set of capacity 62.5KVA |
77 | DG Set ofcapacity 500 KVA. |
78 | Removing and replacing of Fuel injector pipe forfollowing DG set |
79 | DG Set of capacity 62.5KVA |
80 | DG Set ofcapacity 320 KVA. |
81 | Heating and varnishing of alternator forfollowing DG set |
82 | DG Set of capacity 62.5KVA |
83 | DG Set ofcapacity 500 KVA. |
84 | Supply and replacement ofanti vibration mounting pad for DG Set of capacity 62.5KVA including removing of existing . |
85 | Supply and replacement of the following items for DG set any capacity |
86 | Replacement of AVRSuitable for 62.5KVA Alternators |
87 | Replacement of AVRSuitable for 500 KVA Alternators |
88 | Removing dismantling and overhauling of 12 volt starter motor, replacement of armature coil, field coil, bush bearing etc to make the starter motor serviceable complete all as specified and as directed. |
89 | Spray painting of diesel generating set of capacity 62.5 to 125 KVA with with acoustic enclosure one coat of synthetic enamel paint including writing of SM/MES No on engine and alternator, body colour shall be apple green, black for foundation base frame, red for all guards all as specifiedand as directed. |
90 | Spray painting of diesel generating set of capacity 500 KVA open type with one coat of synthetic enamel paint including writing of SM/MES No on engine and alternator, body colour shall be apple green,black for foundation base frame, red for all guards for all as directed. |
91 | Removing and replacing the old unserviceable lead acid battery of size 12 Volt , 130 AHof reputed make including charging andshifting & depositing oldbattery to MES all as specified as directed. |
92 | Removing and replacing the old unserviceable lead acid battery of size 12 Volt , 180 AH of reputed make including charging andshifting & depositing oldbattery to MES all as specified as directed. |
93 | M & L for PCC (1:3:6) type C2 (using 40mm graded crusehd stone aggregate ) as in foundation/Coppingof pole including necessary form work complete all as specified and directed. |
94 | Schedule of credit amount brought back from Ser Page No.28- Rs. 5,869.00 will be deducted from the above quoted amount to derive the contract sum. SIGNATURE OF CONTRACTOR |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail