Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Various Work Regarding Vcb, Switchyard Etc In Area Of Edd-Ii Hapur, Business Plan 2024-25, For Various Works Regarding Vcb / Switch Yard / Sub-Statons Etc. Other Associated Works ( 15Nos. Works ) , In Business Plan ( 2024-25 ) , In The A. Submission Date for this Tender is 20-05-2024. Fuses Tenders in hapur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-May-2024 | exte date | Date | 15-05-2024 |
2 | 15-May-2024 | date exten | Date | 20-05-2024 |
FileName | File Description | File Size |
c91690c9-38f7-437f-9f32-ac8635ece185.html | Tender Notice | 0 KB |
BOQ_1595873.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tendernotice_2.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | FOR VARIOUS WORKS REGARDING VCB/SWITCH YARD/ SUB-STATONS ETC. OTHER ASSOCIATED WORKS, IN BUSINESS PLAN (2024-25), IN THE AREA OFEDD-II HAPUR, UNDER EDC., HAPUR.(Third party inspection of the quality of all works will be conducted by the department.) |
2 | Carriage of all petty material of estimate, from Electricity store center, Hapur to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge. |
3 | Carriage of 33KV CT 400/200/1A, from Electricity store center, Hapur to 33/11KV Sub-Station with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge. |
4 | Mounting, Placing and connecting of all connections of 33KV CT 400/200/1A, and completion work properly by providing required fixing matrial, as per RESPO Norms, and as per direction of site incharge. |
5 | Installation of Battery set and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge. |
6 | Installation of Battery charger set and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge. |
7 | Erection & Fixing of 11KV. DO Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. |
8 | Erection & Fixing of 11KV. TPMO set on ST/PCC Pole, and completion work properly by providing required fixingmatrial, as per RESPO Norms, and as per direction of site incharge. |
9 | Erection and Fixing of 33KV Lightening Arrestor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge. |
10 | Erection and Fixing of 33KV Line Isolastor by providing all fixing materials and completion work properly as per RESPO Drawing/Norms and as per direction of site incharge. |
11 | Making and filling of 33KV Cable Jointing Kit 3x300Sqmm, outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge. |
12 | Laying of 11KV 3x300Sqmm. XLPE Cable, and completion work properly as per RESPO/Norms, including by providing required fixing materials and as per direction of site incharge. |
13 | Repairing of Capacitor Bank and completion energisation work properly, including by providing required materials, as per RESPO Norms, and as per direction of site incharge. |
14 | Erection/Installation of outgoing Rely Crompton make and completion energisation work properly by providing required fixing material, as per RESPO/Drawing Norms , and as per direction of site incharge. |
15 | Installation of Vaccum Interrupter and completion work properly as per RESPO Drawing/Norms, and as per direction of site incharge. |
16 | Dismantling work and carriage ofold and jarjar 33KV CT from 33/11KV Sub-Station to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge. |
17 | Dismantling work and carriage of old and jarjar scrap Battery set from 33/11KV Sub-Station/ site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge. |
18 | Jumpering and line energisation work properly as per RESPO/Norms and as per direction of site incharge. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail