}

Tender For Provn Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Chizami, chizami-Nagaland

Assam Rifles-AR has published Tender For Provn Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Chizami. Submission Date for this Tender is 22-05-2024. Civil Work Tenders in chizami Nagaland. Bidders can get complete Tender details and download the document.




Tender Notice

43289591
Corrigendum : Tender For Provn Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Chizami
Open Tender
Indian
Nagaland
chizami
22-05-2024

Tender Details

Provn Of Improvement And Enhancement Of Old Existing Temporary Shelters And Ancillaries Including Infrastructural Developments Work For Cob Chizami

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-May-2024 Change in date Date 22-05-2024

Key Value

Document Fees
INR 1500 /-
EMD
INR 1156900.0 /-
Tender Value
Refer document

BOQ Items

Name of Work : Provn of improvement & enhancement of old existing temporary shelters and ancillaries including infrastructural development work for COB Chizami (Nagaland)
Sl. No. Item Description
1SCHEDULE ‘A" Part-I
2Supply & Construction of prefabricated fast eractable modular shelter for SM Bk (18.30 m x 6.10m x 3.00m) including Internal and external Electrification & Furniture (Specication and drawing complete all as specified for NIT). Drawing No DGAR/COB/01 Sheet No 01 to 10 attached.
3SCHEDULE ‘A’ Part-II
4Supply & Construction of Prefabricated fast eractable modular shelter for Offrs/JCOs (10.64 m x 6.10 m x 2.70 m) including Internal and external Electfication & Furniture (Specication and drawing complete all as specified for NIT). Drawing No DGAR/COB/03 Sheet No 01 to 10 attached.
5SCHEDULE ‘A’ Part III
6Supply & Constr of Pre-fabricatedfast erectable modularshelter for Kote (size 18.30m x 6.10 m X 3.00 m) (Tech Specications & drawings as specified in NIT). Drawing No DGAR/COB/04 sheet No 01 to 09 attached in tender.
7SCHEDULE ‘A’ Part IV
8Supply & Constr of Pre-fabricatedfast erectable modularshelter for Store building (size 18.30m x 6.10 m X 3.00 m) (Tech Specications & drawings as specified in NIT). Drawing No DGAR/COB/04 sheet No 01 to 09 attached in tender.
9SCHEDULE ‘A" Part-V
10Supply & Construction of Prefabricated fast eractable modular shelter for Security Tower/Sentry Post/Guard Room (8.40 Mtr (7.9+0.5) height) including Internal and external Electfication & Furniture (Specication and drawing complete all as specified for NIT). Drawing No DGAR/COB/07 Sheet No 01 to 11 attached.
11SCHEDULE "A" Part-VI
12Supply & Constr of Pre-fabricatedfast erectable modularshelter for Signal Centre/MI Room/Company Office(size 18.30m x 6.10 m X 3.00 m) (Tech Specications & drawings as specified in NIT). Drawing No DGAR/COB/04 sheet No 01 to 09 attached in
13SCHEDULE ‘A’ Part-VII(Security Fencing of 820 RM) (Drawing No DGAR/Engr/COB/116 sheet No 01 to 02)
14Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. all kind of soil.
15Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size).
16Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, plinth,posts etc.
17Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. 65X65X6 mm angle iron post for both Iron pillar and strut post.
18Fencing with welded steel wire fabric fencing with posts of specified material and standard design of size 75 mmx 75mm using 4 mm dia GI wire.
19Extra for providing and fixing FI Sup for barbed wire of 40x 6 mm flat iron section.
20Painting with aluminium paint of approved brand and manufacture to give an even shade Two or more coats on new work on chain link fencing.
21Providing and fixing concertina coil fencing with punched tape concertina coil 600mm dia 10 metre openable length (total length 90m) having 50 Nos founds per 6 metre length, upto 3m height of wall with existing angle iron "Y" shaped placed 2.4m or 3.00m apart and with 9 horizontal R.B.T reinforced barbed wire, stud tied with G.I clips to retain horizontal including necessary bolts or G.I barbed wire tied to angle iron all complete as per direction of Engineer
22Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. 16.18.1 With G.I. barbed wire
23Painting with aluminium paint of approved brand and manufacture to give an even shade Two or more coats on new work on chain link fencing
24SCHEDULE ‘A" Part-VIII (PCC Internal Road of 560 RM)
25Earth work in excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth upto 50m and lift upto 1.5m disposal soil to be levelled and neatly dressed. All kind of soil
26Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge
27Supplying and laying stone aggregate of 90 to 45 mm size of WBM with moroum as binding material including 13.2mm size stone screening sorting, watering spreading to template, compacting stone aggregate in uniformed thickness and consolodiation with power road roller of 8 to 10 tonne capacity in two layer with proper gradient and camber etc complete(150mm thick) including stone screening of 13.2mm and 11.2mm
28Providing and laying of position cement concrete desi mix M-30 grade in PCC roads using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate as per approved & specified design criteria providing dowl bars with sleeve/tie bars sherever required laying at site spreading and compacting mechanically by using needle and surface vibrators levelling to required slope/camber, finishing with reqd texture incl steel form work with sturdy MS channel section, curing making provision for contraction/ expansion construction & longitudinal joints (10mm wide x 50mm deep) by groove cutting machine, providing and filling joints with approved joints filler and sealants cimplete all as per direction of Engr-in-charge (Item of joints fillers sealants dowel bars with sleeve/tie bars to be paid separately). cement concrete prepared with batch mixing machine.
29Centring and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached plasters, butteresses, Plinth and string courses etc.
30SCHEDULE ‘A" Part-IX (R.R Masonry Retaining 2.6 mtr wall with drain of 100 RM) (Drawing No DGAR/Engr/COB/12 sheet No 01)
31Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
32Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:4:8(1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) all work upto plinth level.
33Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1cement : 6 coarse sand).
34Random rubble masonry with hard stone in Superstructure above plinth level and upto floor five level,including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) above plinth level with :Cement mortar 1:6 (1cement : 6 coarse sand).
35Providing and laying of cement concrete in cooping of R.R masonry retaining walls of specified grade excluding the cost of centering and shuttering with mix of1:2:4(1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) upto floor five level.
36Raised and cut pointing in stone work in white cement mortar mix of 1:3 (1 cement: 3 fine sand).
37Supplying and stacking at site 20 mm size stone aggregate
38Providing and fixing unplasticised Rigid PVC sewer pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter.
39Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:2:4(1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all work upto plinth level.
40Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:3:6(1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) all work upto plinth level.
41SCHEDULE ‘A’ Part-X (Construction of Storm Drainage of 70 RM) (Drawing No DGAR/Engr/COB/10 sheet No 01)
42Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m disposal soil to be levelled and neatly dressed . All kind of soil.
43Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soil.
44Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size).
45Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
46Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1cement : 6 coarse sand).
4712 mm cement plaster of mix 1:4 (1 cement: 4 fine sand).
48SCHEDULE ‘A" Part-XI(PCC Footpath with Chequired Tiles of 290 RM)
49Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m disposal soil to be levelled and neatly dressed . All kind of soil.
50Supplying and laying stone aggregate of 90 to 45 mm size of WBM with moroum as binding material including 13.2mm size stone screening sorting, watering spreading to template, compacting stone aggregate in uniformed thickness and consolodiation with power road roller of 8 to 10 tonne capacity in two layer with proper gradient and camber etc complete(150mm thick)
51Providing and laying of position cement concrete of specified grade excliding the cost of centering and shuttering with mix of1:2:4(1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all work upto plinth level.
52Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
53Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).
54SCHEDULE ‘A" Part-XII(Earth Work)
55Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of exca vated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.
56Note :-Total amount is inclusive of all applicable taxes. Total wise evaluation will be carried out to obtain Lower one.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail