}

Tender For 2000142141-250 Mt Crane Hiring (Kobelco), Hazira-Gujarat

Arcelor Mittal Nippon Steel India Limited has published Tender For 2000142141-250 Mt Crane Hiring (Kobelco). Submission Date for this Tender is 09-05-2024. Cranes Tenders in Hazira Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

43289276
Tender For 2000142141-250 Mt Crane Hiring (Kobelco)
Open Tender
Indian
Gujarat
Hazira
09-05-2024

Tender Details

Tender For 2000142141-250 Mt Crane Hiring (Kobelco) 2000142141 10 10 20 MOBILISATION AND DEMOBILIZATION 2 LO 10 DEPLOYMENT OF 250 MT CRANE 600 STD Email : niraj.patel1@amns.in Contact : Name : Niraj Patel Item Details : Scope of work Duty - 12hrs/day Scope of Work The scope of work includes providing services for movable equipment / machines on regular basis in HBI-MECH area as per agreement <(>&<)> as per instructions given by area In charge or shift In charge. GENERAL AND COMMERICAL TERMS <(>&<)> CONDITIONS FOR HIRING OF HEAVY EQUIPMENTS. 1. Prices to be inclusive of all charges including operator / driver charges +Reliver + Repairs <(>&<)> Maintenance crew + Insurance + RTO + Consumables (like fuel oil etc.) +fuel filling facility (like bowser, pick up, etc.) at site + Safety PPE . 2. Vendors have to quote basic prices. GST shall be paid extra as applicable. 3. All operators / drivers to be deployed on shift wise duty basis. 4. Equipment manufacturing year must be 2016 or later (Equipment of manufacturing year before 2016 will not be allowed) and it should be in good working condition. Any decision regarding acceptance of equipment of YOM earlier than 2016 will be taken by AMNS only in exceptional cases and rights for accepting such equipment’s will be only with AMNS. 5. Payment shall be made as per actual availability of equipment at site. 6. Payment shall be made within 30 days of invoice submission. 7. Equipment should be ready to deploy / make operational at our site by 1st Jan 2024. However exact date of mobilization would be communicated 7 days in advance. 8. Final vehicle check will be done by AMNS HSE department, and all PPEs shall be in vendor’s scope. 9. All Equipment prices to be inclusive of mobilization <(>&<)> De-mobilization charges (if any). 10. Prices shall remain firm for the duration of the contract. 11. All offers to be submitted as per quotation format only. 12. Contract Period – 1st Jan 2024 to 31st Dec 2024. 13. The contract for hiring of the equipment can be extended beyond the initial period as per mutual consent <(>&<)> understanding. 14. All Equipment needs to be deployed from 07:00 am to 07:00 pm for Day Shift <(>&<)> 07:00 pm to 07:00 am for Night Shift. 15. Maintenance of 10 hours (single shift) working equipment to be carried out after 07:00 pm, for 20 hours as per discussion with Area Incharge/Reporting manger. 16. To avoid Production loss, Machine to be maintained in healthy condition for readiness for shutdown activities <(>&<)> regular work to complete in stipulated time. 17. Necessary Attachment needs to be provided with Machines as per Operational Requirement as per Site Visit. 18. In-case of Special attachment vendor to keep provision of various fittings <(>&<)> adaptors in advance for fitment in Machine. Machine must be suitable for work at the AMNS site it has to be deployed. 19. For 12 hrs healthy availability of machine <(>&<)> operator per shift without any breakdown, certification will be considered 10 hrs, as Page 2 of 2 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000111665 Date 02.05.2024 Submission Date 09.05.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null yagnika patel Contact Email yagnika.patel@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 2 hrs to be considered for operators’ food break <(>&<)> refreshments. 20. For 24 hrs healthy availability of machine <(>&<)> operator per day without any breakdown, certification will be considered 20 hrs, as 4 hrs to be considered for both shift operators break <(>&<)> refreshments. 21. The Contractor shall provide the specified equipment in healthy condition with skilled operators as per company policies. 22. The Contractor shall not move the equipment from designated work area to another area without prior approval from the Site Incharge. 23. All equipment must be in compliance with all applicable RTO, central, State, and local govt rules <(>&<)> regulations. 24. Contractor shall deploy alternate equipment for any breakdown above 48hrs duration. 25. Before deputing any new operator prior approval to be taken from site Incharge for competency assessment. 26. Daily logbook as per format provided by Site in-charge, has to be maintained by operators. 27. GPS system to be installed from common vendor which is selected by AM/NS India. Safety terms <(>&<)> conditions. 1. Contractor shall provide the equipment and operator as per land of law (e.g., RTO Laws <(>&<)> Fitness) and company policies (e.g., Safety Certification <(>&<)> Competency Training). 2. Contractor should provide required number of relievers for safe operation. No operators will be permitted to work beyond 12 hrs and should be given weekly off regularly. 3. Penalty will be applicable for violating safety/statutory norms, mobile policy/vehicle driving policy as per AMNS consequence management policy. 4. Contractor must ensure safe transport of their operator and maintenance team inside plant premises. No Pedestrian/Cycles/Two Whee lers movement will be allowed inside the Plant Premises. 5. Contracted Equipment should have all OEM standard safety devices and as required by AM/NS India, as per table below. Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail