|
| 1 | AMC of Window, Splim, Casette AC-PDR |
| 2 | OVERHAULING OF WINDOW AC, SPLIT AC, WATER COOLER ETC. Overhauling and painting of WAC, SAC, WC & Cold Storage of different make & different capacities located at various location within the refinery premises, refinery township and air monitoring stations, job includes removal of machines from location, dismantling, cleaning, washing, chemical cleaning of condenser & cooling coil, overhauling, lubrication of blower motor, checking, repair/rectification/replacement of effective control component. Painting of all metal part and chassis cover internal painting with primer & outer painting with synthetic enamel paint.Cleaning of coil & condenser to be done with wire brush.Defective/damage insulation to be replaced.All the electrical wires must be dressed properly. Defective wires to be replaced including supply of wires.Defective/ damage asbestos sheet to be replaced.Asbestos sheet shall be provided by the owner.Cleaning/replacement of filter by Nylon filter.Re-assembly of machine, shifting to location & testing of machine.Job complete in all respect including men & material and as per direction and instruction of Site Engineer/Engineer-in-Charge. |
| 3 | INSTALLATION OF WINDOW AC , WATER COOLER IN EXISTING FRAME Installation of window A/C, water cooler of different make and different capacities at any location within the refinery premises, refinery township & at any other location of refinery in the existing readymade frame/foundation.Job includes transportation of machine from workshop or other location to site, fixing of chassis cover, installation of machine in chassis cover, testing and commissioning of machine at location complete in all respect as per the direction & instruction of the Engineer-in-Charge. |
| 4 | INSTALLATION OF WINDOW AC INCLUDING FIXING OF FRAME Installation of window air conditioner of different make & capacity at any location within the refinery premises, refinery township & air monitoring station.Job includes breaking of wall, supply & fixing of require wooden frame, repairing & plastering of broken wall. Transportation of WAC from workshop or other location to the site, fixing of chassis cover after drying, putting WAC in the chassis cover, testing and commissioning of machine at location. Job complete in all respect as per direction & instruction of the Engineer-in-Charge. 1. This item shall not be applicable for breaking/cutting the window with glass/grill or metal structure. 2. Transport for AMS (Outside battery areach) shall be provided by department. |
| 5 | SUPPLY AND FIXING OF PLYWOOD SHEET IN WINDOW AC OPENING Supply of plywood sheet 4mm thick, cutting to required size for covering the WAC opening of different make and fixing with nails. Job complete with men & material and as per direction & instruction of the Engineer-in-Charge. |
| 6 | REPLACEMENT OF OLD BODY KIT OF WINDOW AC Supply of following type, window air conditioner kit for replacement the old damaged/defective body/kit of window air conditioner. The new kit includes all the component such as condenser, cooling coil, blower motor, thermostat, control knob, control wiring kit, grill & other except the compressor.Job also includes dismantling of working compressor from the damaged machine, fixing the same in new kit, changing of refrigerant gas R-22, complete testing & commissioning. Job complete in all respect including supply of kit and required R-22 gas, transportation of kit to site.The defective/ damaged kit shall be retained by the owner. Job complete in all respect with men & material and as per direction & instruction of Site Engineer/Engineer-in-Charge |
| 7 | Cosmo type (Top flow of cold air) |
| 8 | National type (Right vertical side flow of cold air) |
| 9 | REPLACEMENT OF CONDENSER/ COOLING COILS OF WINDOW AC Supply, fixing, gas charging, testing and commissioning of following condenser or cooling coils suitable for different make & different capacity window air conditioner.Job includes dismantling of old damaged condenser/ cooling coil, supply & fixing new condenser/ cooling coil, gas charging, testing & commissioning.Job complete in all respect with men & material including refrigerant gas R-22 and as per direction and instruction of site engineer/Engineer-in-Charge. NOTE : Old damaged condenser/cooling coil shall be retained by the department. |
| 10 | Condenser coil complete |
| 11 | Cooling coil complete |
| 12 | MONTHLY ROUTINE MAINTENANCE OF WINDOW AC, SPLIT AC, WATER COOLERS ETC. Routine, regular and breachkdown maintenance of WAC, SAC, WC and cold storage of different make & different capacities. Installed at various location of refinery premises, refinery township & air monitoring station.Job includes attending the complaints of machinesas per the complaint register and instruction of site engineer.Job includes checking of machines, identification of defect, repair/replacement of defective component.Rewinding of blower motor.Replacement of Thermostat, Blower, Fan blade, electrical switches, control knob, wires.Cleachning of air filter, removal of dust from cooling coil & condenser by removing the machine from location ifrequired.Attending the minor/major leakage of refrigerant gas R-22/R-12 arresting the leak and recharging the gas.Repair/replacement of defective bush/bearing of blower motor including lubrication of blower motor, tightening of all the electrical connection.Repair/Replacement (by repaired compressor) of defective compressor.Job includes dismantling of defective compressor either at site or at workshop after transportation of machine to workshop, taking necessary gate pass/permission from concerned authority, sending the defective compressor to repairer shop and bringing back the same/replaced (repaired) compressor from repair shop to site, re-fixing, gas charging, testing & commissioning and making the machine in perfect working condition. Replacement of all type of defective capacitor.Job also includes connection/ disconnection for heater as per requirement and also eplacing/the new fixing the new heater in the machine.The heater be provided by the department.Job complete in all respect including all consumables including gas, men & material and as per direction and instruction of site Engineer / Engineer-in-Charge. Note: 1. Quoted rate will be on per month per machine basis. 2. The defective compressor shall be repaired through original supplier or their authorize representative. 3. The burnt copper of blower motor shall be retained by the Contractor. 4. All the defective/damage consumable shall be left with department in the scrap area & no out pass for such type of item shall be issued. 5. 3.0 TR SAC shall be equivalent to 2 nos. machine for billing purpose. 6. 2.0 TR/1.5 TR SAC shall be equivalent to 1 machine. |
| 13 | REMOTE CONTROL SWITCH FOR SPLIT AC Supply & fixing of remote control switch pendant type for temperature controlling of theVoltas/Amtrex/ Fedders Lloyds/ Carrier Aircon or any other make, split air conditioners of 2.0/3.0 (2x1.5 TR) TR capacity.Job includes dismantling of the defective switches and wire and installation of new switch.Job complete in all respect including man and material and as per the directions of Engineer-in-Charge. |
| 14 | FRONT GRILL FOR WINDOW AC Supply & fixing of PVC make front grill suitable for window air conditioner (Voltas/Carriers/Blue Star/Fedders Lloyds/ Usha, etc. ) as per direction of Engg.-in-Charge. |
| 15 | Dismantling & shifting of Split Air Conditioning Unit 1.0TR / 1.5TR / 2.0TR capacity including indoor and outdoor unit,refrigerant tubing etc. complete to new location or A/C workshop as per direction of Engineer-in-charge. |
| 16 | Installation of split type wall Mounted Air Conditioner indoor, outdoor unit fitted with rotary compressor, copper condenser and first charge refrigerant R410A/ R22/ Other, including connection of copper pipe and material supplied with complete unit etc. as required (Excluding cost of copper pipe) |
| 17 | ADDITIONAL COPPER TUBE FOR SPLIT AC Supply & fixing of additional length of copper tube for split A/C commissioning including all accessories. |
| 18 | REPLACEMENT OF BURNT UNCUT COMPRESSOR Replacement of burnt uncut compressor of 1.5-ton capacity from the manufacturer whenever required as per direction of engineer-in-charge. |
| 19 | GAS CHARGING OF AIR CONDITIONER UPTO 1.5 TON CAPACITY Gas charging of air conditioner upto 1.5ton capacity with job involved transportation of machine to vendors\" works. Checking of all components for leak by charging co2 gas & finally evacuating the compressor completely & charges of refrigerant gas - 22. A |
| 20 | SUPPLY OF THERMOSTAT SUITABLE FOR WATER COOLER Supply of thermostat suitable for water cooler, window type rac whenever require as per direction of site engineer/ engineer-in-charge. |
| 21 | SUPPLY OF AIR FILTER (NYLON MAKE) Supply of air filter (nylon make) suitable for 1.5 ton window type carrier, lg, vediocon, amtrex & any other make rac. |
| 22 | COPPER WIRING IN EXISTING CONDUIT / CASING CAPING Supplying and drawing following size of FRLS PVC insulated, copper conductor, single core cable in the existing surface / recessed, PVC/steel conduit / PVC casing and capping as required. Note: Only ISI marked cables shall be used. |
| 23 | 3 x 4 sq.mm |
| 24 | SUPPLY & FIXING OF MISC FIXTURES EXCLUDING PERPEX SHEET Supply, fixing and connection of 250 V flush type / tumbler Anchor make or approved equivalent switch, socket bell push etc. on perpex sheet on MS box inlcuding supply and fixing of nuts, bolts, etc. but excluding the perpex sheet all complete with labour and materials as per direction of the Engineer-in-Charge. |
| 25 | 3 pins 15 / 16 amps. ISI marked polycarbonate unbreakable plug top |
| 26 | SUPPLY & FIXING OF PVC CONDUIT ON SURFACE Supply and fixing of following size of PVC conduit alongwith the accessories in surface including cutting the wall and making good the same in case of recessed, conduit as required: Note: Only ISI marked conduits shall be used. |
| 27 | 25 mm |
| 28 | SUPPLY OF CONDENSATE DRAIN PIPE |
| 29 | AMC of Window, Split, casette AC-PetChem |
| 30 | OVERHAULING OF WINDOW AC, SPLIT AC, WATER COOLER ETC. Overhauling and painting of WAC, SAC, WC & Cold Storage of different make & different capacities located at various location within the refinery premises, refinery township and air monitoring stations, job includes removal of machines from location, dismantling, cleaning, washing, chemical cleaning of condenser & cooling coil, overhauling, lubrication of blower motor, checking, repair/rectification/replacement of effective control component. Painting of all metal part and chassis cover internal painting with primer & outer painting with synthetic enamel paint.Cleaning of coil & condenser to be done with wire brush.Defective/damage insulation to be replaced.All the electrical wires must be dressed properly. Defective wires to be replaced including supply of wires.Defective/ damage asbestos sheet to be replaced.Asbestos sheet shall be provided by the owner.Cleaning/replacement of filter by Nylon filter.Re-assembly of machine, shifting to location & testing of machine.Job complete in all respect including men & material and as per direction and instruction of Site Engineer/Engineer-in-Charge. |
| 31 | INSTALLATION OF WINDOW AC , WATER COOLER IN EXISTING FRAME Installation of window A/C, water cooler of different make and different capacities at any location within the refinery premises, refinery township & at any other location of refinery in the existing readymade frame/foundation.Job includes transportation of machine from workshop or other location to site, fixing of chassis cover, installation of machine in chassis cover, testing and commissioning of machine at location complete in all respect as per the direction & instruction of the Engineer-in-Charge. |
| 32 | INSTALLATION OF WINDOW AC INCLUDING FIXING OF FRAME Installation of window air conditioner of different make & capacity at any location within the refinery premises, refinery township & air monitoring station.Job includes breaking of wall, supply & fixing of require wooden frame, repairing & plastering of broken wall. Transportation of WAC from workshop or other location to the site, fixing of chassis cover after drying, putting WAC in the chassis cover, testing and commissioning of machine at location. Job complete in all respect as per direction & instruction of the Engineer-in-Charge. 1. This item shall not be applicable for breaking/cutting the window with glass/grill or metal structure. 2. Transport for AMS (Outside battery areach) shall be provided by department. |
| 33 | SUPPLY AND FIXING OF PLYWOOD SHEET IN WINDOW AC OPENING Supply of plywood sheet 4mm thick, cutting to required size for covering the WAC opening of different make and fixing with nails. Job complete with men & material and as per direction & instruction of the Engineer-in-Charge. |
| 34 | REPLACEMENT OF OLD BODY KIT OF WINDOW AC Supply of following type, window air conditioner kit for replacement the old damaged/defective body/kit of window air conditioner. The new kit includes all the component such as condenser, cooling coil, blower motor, thermostat, control knob, control wiring kit, grill & other except the compressor.Job also includes dismantling of working compressor from the damaged machine, fixing the same in new kit, changing of refrigerant gas R-22, complete testing & commissioning. Job complete in all respect including supply of kit and required R-22 gas, transportation of kit to site.The defective/ damaged kit shall be retained by the owner. Job complete in all respect with men & material and as per direction & instruction of Site Engineer/Engineer-in-Charge |
| 35 | Cosmo type (Top flow of cold air) |
| 36 | National type (Right vertical side flow of cold air) |
| 37 | REPLACEMENT OF CONDENSER/ COOLING COILS OF WINDOW AC Supply, fixing, gas charging, testing and commissioning of following condenser or cooling coils suitable for different make & different capacity window air conditioner.Job includes dismantling of old damaged condenser/ cooling coil, supply & fixing new condenser/ cooling coil, gas charging, testing & commissioning.Job complete in all respect with men & material including refrigerant gas R-22 and as per direction and instruction of site engineer/Engineer-in-Charge. NOTE : Old damaged condenser/cooling coil shall be retained by the department. |
| 38 | Condenser coil complete |
| 39 | Cooling coil complete |
| 40 | MONTHLY ROUTINE MAINTENANCE OF WINDOW AC, SPLIT AC, WATER COOLERS ETC. Routine, regular and breachkdown maintenance of WAC, SAC, WC and cold storage of different make & different capacities. Installed at various location of refinery premises, refinery township & air monitoring station.Job includes attending the complaints of machinesas per the complaint register and instruction of site engineer.Job includes checking of machines, identification of defect, repair/replacement of defective component.Rewinding of blower motor.Replacement of Thermostat, Blower, Fan blade, electrical switches, control knob, wires.Cleachning of air filter, removal of dust from cooling coil & condenser by removing the machine from location ifrequired.Attending the minor/major leakage of refrigerant gas R-22/R-12 arresting the leak and recharging the gas.Repair/replacement of defective bush/bearing of blower motor including lubrication of blower motor, tightening of all the electrical connection.Repair/Replacement (by repaired compressor) of defective compressor.Job includes dismantling of defective compressor either at site or at workshop after transportation of machine to workshop, taking necessary gate pass/permission from concerned authority, sending the defective compressor to repairer shop and bringing back the same/replaced (repaired) compressor from repair shop to site, re-fixing, gas charging, testing & commissioning and making the machine in perfect working condition. Replacement of all type of defective capacitor.Job also includes connection/ disconnection for heater as per requirement and also eplacing/the new fixing the new heater in the machine.The heater be provided by the department.Job complete in all respect including all consumables including gas, men & material and as per direction and instruction of site Engineer / Engineer-in-Charge. Note: 1. Quoted rate will be on per month per machine basis. 2. The defective compressor shall be repaired through original supplier or their authorize representative. 3. The burnt copper of blower motor shall be retained by the Contractor. 4. All the defective/damage consumable shall be left with department in the scrap area & no out pass for such type of item shall be issued. 5. 3.0 TR SAC shall be equivalent to 2 nos. machine for billing purpose. 6. 2.0 TR/1.5 TR SAC shall be equivalent to 1 machine. |
| 41 | REMOTE CONTROL SWITCH FOR SPLIT AC Supply & fixing of remote control switch pendant type for temperature controlling of theVoltas/Amtrex/ Fedders Lloyds/ Carrier Aircon or any other make, split air conditioners of 2.0/3.0 (2x1.5 TR) TR capacity.Job includes dismantling of the defective switches and wire and installation of new switch.Job complete in all respect including man and material and as per the directions of Engineer-in-Charge. |
| 42 | FRONT GRILL FOR WINDOW AC Supply & fixing of PVC make front grill suitable for window air conditioner (Voltas/Carriers/Blue Star/Fedders Lloyds/ Usha, etc. ) as per direction of Engg.-in-Charge. |
| 43 | Dismantling & shifting of Split Air Conditioning Unit 1.0TR / 1.5TR / 2.0TR capacity including indoor and outdoor unit,refrigerant tubing etc. complete to new location or A/C workshop as per direction of Engineer-in-charge. |
| 44 | Installation of split type wall Mounted Air Conditioner indoor, outdoor unit fitted with rotary compressor, copper condenser and first charge refrigerant R410A/ R22/ Other, including connection of copper pipe and material supplied with complete unit etc. as required (Excluding cost of copper pipe) |
| 45 | ADDITIONAL COPPER TUBE FOR SPLIT AC Supply & fixing of additional length of copper tube for split A/C commissioning including all accessories. |
| 46 | REPLACEMENT OF BURNT UNCUT COMPRESSOR Replacement of burnt uncut compressor of 1.5-ton capacity from the manufacturer whenever required as per direction of engineer-in-charge. |
| 47 | GAS CHARGING OF AIR CONDITIONER UPTO 1.5 TON CAPACITY Gas charging of air conditioner upto 1.5ton capacity with job involved transportation of machine to vendors\" works. Checking of all components for leak by charging co2 gas & finally evacuating the compressor completely & charges of refrigerant gas - 22. A |
| 48 | SUPPLY OF THERMOSTAT SUITABLE FOR WATER COOLER Supply of thermostat suitable for water cooler, window type rac whenever require as per direction of site engineer/ engineer-in-charge. |
| 49 | SUPPLY OF AIR FILTER (NYLON MAKE) Supply of air filter (nylon make) suitable for 1.5 ton window type carrier, lg, vediocon, amtrex & any other make rac. |
| 50 | COPPER WIRING IN EXISTING CONDUIT / CASING CAPING Supplying and drawing following size of FRLS PVC insulated, copper conductor, single core cable in the existing surface / recessed, PVC/steel conduit / PVC casing and capping as required. Note: Only ISI marked cables shall be used. |
| 51 | 3 x 4 sq.mm |
| 52 | SUPPLY & FIXING OF MISC FIXTURES EXCLUDING PERPEX SHEET Supply, fixing and connection of 250 V flush type / tumbler Anchor make or approved equivalent switch, socket bell push etc. on perpex sheet on MS box inlcuding supply and fixing of nuts, bolts, etc. but excluding the perpex sheet all complete with labour and materials as per direction of the Engineer-in-Charge. |
| 53 | 3 pins 15 / 16 amps. ISI marked polycarbonate unbreakable plug top |
| 54 | SUPPLY & FIXING OF PVC CONDUIT ON SURFACE Supply and fixing of following size of PVC conduit alongwith the accessories in surface including cutting the wall and making good the same in case of recessed, conduit as required: Note: Only ISI marked conduits shall be used. |
| 55 | 25 mm |
| 56 | SUPPLY OF CONDENSATE DRAIN PIPE |