Tender For Installation Of New Additional Transformer, Transformer Capacity Increasing, Line Related Work And Other Work Under The Area Of Electricity Distribution Division-Ist (Gauriganj), Distt. Amethi In Business Plan Year 2024-25.
Tender Overview
Project Description
Installation Of New Additional Transformer, Transformer Capacity Increasing, Line Related Work And Other Work Under The Area Of Electricity Distribution Division-Ist ( Gauriganj ) , Distt. Amethi In Business Plan Year 2024-25.
BOQ
| Sl. No. | Item Description |
| 1 | Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) |
| 2 | PCC/ST Pole |
| 3 | 11 KV X arm V Type |
| 4 | ACSR Weasel Conductor |
| 5 | 25/63 KVA Transformer |
| 6 | 250 KVA Transformer |
| 7 | 400 KVA Transformer |
| 8 | 11 KV VCB O/G CTR 200/100/5A |
| 9 | S/s base angle |
| 10 | 11 KV Pin Insulator with Pin |
| 11 | 11 KV Disc insulator with pin |
| 12 | Top Channel |
| 13 | F Braket |
| 14 | Stay set complete |
| 15 | Earthing complete |
| 16 | Dropper Channel |
| 17 | I Hook |
| 18 | T-Off Channel |
| 19 | 11 KV Cable Jointing Kit |
| 20 | 11 KV XLPE Cable 3x185 Sq.mm. |
| 21 | AB cable (3x50+1x35+1x16) Sq.mm. |
| 22 | L.T. Cable |
| 23 | Cross Bracing |
| 24 | Other Line Materials |
| 25 | Dragging of STP/PCC Pole from dump store to pit site. |
| 26 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/ST pole support including digging of pit & fixing of all accessories and clamps as per RESSPO norms .(All civil materialnuts, bolt & clamp etc. will be provided by the contractor). |
| 27 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C./ST pole includingdigging of pit & fixing of all accessories and clamps (All civil materialnuts, bolt & clamp etc. will be provided by the contractor ) as per RESPO norms. |
| 28 | Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. (All civil material will be provided by the contractor). |
| 29 | Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESSPO norms. |
| 30 | Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESSPO norm. |
| 31 | Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz.Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator |
| 32 | Laying of AB Cable (3x50+1x35+1x16) Sq.mm. as per RESSPO norms. |
| 33 | Laying of 11 KV XLPE Cable 3x185 Sq.mm. as per RESSPO norms. |
| 34 | Laying of L.T. Cable as per RESSPO norms. |
| 35 | Installation & Charging of 11 KV VCB O/G CTR 200/100/5Aas per RESSPO norms. |
| 36 | Fixing & installation of 11 KV Cable Jointing Kit as per RESSPO norms. |
| 37 | Construction of plinth for 250/400 KVA transformer of 2x2x1.2 mtr. with help of first class brick and masonry 1:4 cement & coarse sand. Filling the structure completely as per norm with RCC to 1:2:2 cement & stone grit with M.S. bar & M.S. for restling the transformer. |
| 38 | Installation of 250/400 KVA Transformer on newly constructed plinth making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 39 | Earthing of 11/0.4 KV T/F with sutable G.I. pipe and fixing sutable G.I. Strip including all material requaired to complete the work. |
| 40 | Construction of fencing for newely constructed Transformer plinth as per RESSPO norms. |
| 41 | Demounting & Installation of 25/63 KVA Transformer on constructed D/P making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 42 | Installation of 25 KVA Transformer on nwely constructed D/P making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 43 | Dismantling/Loading/unloading, carriage of Old Transformer from site store to store centerGauriganj/Sultanpur to dump store. (distance 0 to 40 Km.) |
| 44 | 10 KVA T/F |
| 45 | 16 KVA T/F |
| 46 | 25 KVA T/F |
| 47 | 100 KVA T/F |
| 48 | 250 KVA T/F |
| 49 | Note: If any work which has been left over in BOQ and is necessary to complete the work, the same will be carried outby working agency free of cost. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender