}

Tender For Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds Boulder Bunds,Pcc Walls Channelization, Crates Buildings And Other Necessary Works As And When Required Of Irrigation F.C Sub Division No. I, Irrigat, rajouri-Jammu And Kashmir

Irrigation And Flood Control Department-IFCD has published Tender For Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds Boulder Bunds,Pcc Walls Channelization, Crates Buildings And Other Necessary Works As And When Required Of Irrigation F.C Sub Division No. I, Irrigat. Submission Date for this Tender is 09-05-2024. Crates Tenders in rajouri Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43284035
Corrigendum : Tender For Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds Boulder Bunds,Pcc Walls Channelization, Crates Buildings And Other Necessary Works As And When Required Of Irrigation F.C Sub Division No. I, Irrigat
Open Tender
Indian
Jammu And Kashmir
rajouri
09-05-2024

Tender Details

Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds Boulder Bunds, Pcc Walls Channelization, Crates Buildings And Other Necessary Works As And When Required Of Irrigation F.C Sub Division No. I, Irrigation F.C S Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds Boulder Bunds Pcc Walls Channelization, Crates Buildings And Other Necessary Works As And When Required Of Irrigation F.C Sub Division No. I, Irrigation F.C Sub

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 04-May-2024 change in class of contractor Other 09-05-2024
2 04-May-2024 Corrigendum Other 09-05-2024

Key Value

Document Fees
INR 300 /-
EMD
INR 1500.0 /-
Tender Value
INR 33000.0 /-

BOQ Items

Name of Work: Stage Contract for annual repairs and maintenance of various Structures Viz RBM Bunds Boulder Bunds,PCC walls Channelization, CratesBuildings and other Necessary works as and when required of IrrigationF.C Sub Division No. I, Irrigation & F.C Sub Division No II Irrigation Sub Division ANS I Irrigation Sub Division ANS II. of IrrigationF.C Division Rajouri.
Sl. No. Item Description
1Stage contract for I&FC Division Rajouri
2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m,includinggettingoutexcavatedearthanddisposalofsurplus excavated earth as directed: 1mtr from cutting edge(AKOS)
325 mtr beyond 1 m from cutting edge
450 mtr beyond 1 m from cutting edge
5Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposalofexcavatedearthleadupto50metersandlift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
6Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as wellas10 m2on plan)including disposalof excavatedearth lead upto50metersandliftupto1.5m,asdirectedbyEngineer-in- Charge. All kinds of soil.
7Earthworkinroughexcavation,bankingexcavatedearthinlayers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes anddressingupinembankmentsforroads,floodbanks,marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.
8Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
9Deduct for not watering the excavated earth for banking.
10Bankingexcavatedearthinlayersnotexceeding20cmindepth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankmentsforroads,floodbanks,marginalbanks,andguide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.
11Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil.
12Filling available excavated earth (excluding rock) in trenches, plinth, sidesoffoundationsetc.inlayersnotexceeding20cmindepth, consolidating each deposited layer byramming and watering, lead upto 50 m and lift upto 1.5m.
13Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones
14ProvidingBA WIRE crates made from 4.00mm wire (Wires as per IS280) Machine woven both ends bent with the following meshes and nominal sectional weight.Mesh+toi(150x150+6;Sec.wtKg/sqm Size 6mx1.5m x1.5m with lids
15Dumping stone excluding cost of stones. In Horizontal on level
16Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)
17Crates made of Mesh type 10x12 (D=100 mm) Zn+PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD).
18Crates made of Mesh type 10x12 (D=100 mm) Zn+10% Al alloy +PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD).
19Dismantling old protection work including cutting of crates and stacking of stones.
20Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates
21Extraction /collection and stacking of boulders within nallah pheriphery excluding all carriages
22Dry stone pitching (any thickness) excluding cost of stones.On Horizontal
23Dry stone pitching (any thickness) excluding cost of stones.On Slopes
24Opening out old wire crates those and re-binding after filling.
25Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates
26Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials
27Tipping stone-filled wire crates in position; including equipment charges.
28Loading/Unloading sand/ earth filled Geo bags (2.83 cft) in lorries; lead upto 50m.
29RandomRubblemasonrywithhardstoneinfoundationandplinth includinglevelingupwithcementconcrete1:6:12(1Cement:6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
30Providing and Laying PVC Polythene of special quality(LMR)
31Supply of A4 Paper 75 GSM for sub divisional use
32Carraige of materials by Mechanical transport: Earth upto 1 km
332 km
343 Km
354 km
365 km
37Beyond 5 Km upto 10 km /km
38Beyond 10 Km upto 20 km /km
39Beyond 20 km /everyadditional Km
40Crates upto 1 km
412 km
423 Km
434 km
445 km
45Beyond 5 Km upto 10 km /km
46Beyond 10 Km upto 20 km /km
47Beyond 20 km /everyadditional Km
48Stone /Boulder upto 1 km
492 km
503 Km
514 km
525 km
53Beyond 5 Km upto 10 km /km
54Beyond 10 Km upto 20 km /km
55Beyond 20 km /everyadditional Km
5640 mm & above Agregrate 1 Km
572 km
583 Km
594 km
605 km
61Beyond 5 Km upto 10 km /km
62Beyond 10 Km upto 20 km /km
63Beyond 20 km /everyadditional Km
64below 40mm Aggregate 1 Km
652 km
663 Km
674 km
685 km
69Beyond 5 Km upto 10 km /km
70Beyond 10 Km upto 20 km /km
71Beyond 20 km /everyadditional Km
72Sand 1 km
732 km
743 Km
754 km
765 km
77Beyond 5 Km upto 10 km /km
78Beyond 10 Km upto 20 km /km
79Beyond 20 km /everyadditional Km
80Carraige of materials fromroad siteto site of work by manual labour including loading , unloading and stacking(Earth for First 50mtrs)
81for every additional 50 mtrs
82stone/Boulders for first 50 mtrs
83for every additional 50 mtrs
8440 mm& above For First 50 Mtrs
85for every additional 50 mtrs
86below 40mm For First 50 Mtrs
87for every additional 50 mtrs
88Sand For First 50 Mtrs
89Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail