Madhyanchal Vidut Vitran Nigam Limited has published Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw (Lnv-1) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly . Submission Date for this Tender is 17-05-2024. Electrification Work Tenders in bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Forthe work of giving new connection of 02 KW (LNV-1) to Smt. Naresh Kumari , Golul Dham Colony , Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly. |
2 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
3 | PCC Pole (8.5 Metre Long) |
4 | Distribution Box 03 Phase |
5 | ABC Cable (3x50 sqmm) |
6 | Stay Set |
7 | Erection Work |
8 | Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete. |
9 | Laying ,Stringing &Sagging of A B Cable (3x50 sqmm) |
10 | Erection of Stay Set with graouting |
11 | Fixing of Distribution Box alongwith making all connections . |
12 | Providing & Fixing of suspention clamps wiyth I-Hook |
13 | Providing & Fixing of Dead End Clamps |
14 | Forthe work of giving new connection to Shri Manohar sahani,Parsakhera Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly. |
15 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
16 | PCC Pole(8.5 Mtr. Long) |
17 | ABC Cable (3x50 sqmm) |
18 | Distribution Box 03 Phase |
19 | Stay Set |
20 | Erection Work |
21 | Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete. |
22 | Laying ,Stringing &Sagging of A B Cable (3x50 sqmm) |
23 | Erection of Stay Set with grouting |
24 | Fixing of Distribution Box alongwith making all connections . |
25 | Providing & Fixing of suspention clamps wiyth I-Hook |
26 | Providing & Fixing of Dead End Clamps |
27 | For the work of Shifting of HT Lines in front of Shri Sailesh Agarwal , parsakhera ,Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly. |
28 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
29 | ST Pole (11 Meter Long) |
30 | ACSR Dog Conductor |
31 | Stay Set |
32 | Other Line materails |
33 | Erection Work |
34 | Erection ofST D/Poleincluding digging of pit & grouting work complete and fitting of all accessories complete. |
35 | Erection ofST Poleincluding digging of pit & grouting work complete and fitting of all accessories complete. |
36 | Laying ,Stringing &Sagging of Dog Conductor |
37 | Erathing of Poles . |
38 | Erection of Stay Set with grouting |
39 | Provioding & Fixing Barbed Wire . |
40 | Provioding & FixingHolding Clampswith nuts & Bolts |
41 | Provioding & Fixing.Danger Board with Clamps. |
42 | Fixing of associated Items i.e.Top Channel-04 No.,T-off Channel- 03 No.,Base Angle -03 nos., Disc fitting-15 No., Pin Insulator with pin-20 Nos. |
43 | For the work of Giving New Connection of 200 kva to M/s Aman Industries at, Maheshpur Ataria, C.B. Ganj,Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly. |
44 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
45 | ST Pole (11 Meter Long) |
46 | ACSR Dog Conductor |
47 | 11 XLPE Cable (3x120 sqmm) |
48 | 11 KV Pilfer Proof metering Cublical |
49 | 11 KV XLPE Cable Box (3x120 sqmm0 O/D |
50 | Stay Set |
51 | Other Line Materials |
52 | Erection Work |
53 | Erection ofST D/Poleincluding digging of pit & grouting work complete and fitting of all accessories complete. |
54 | Laying ,Stringing &Sagging of Dog Conductor |
55 | Laying of11 KV XLPE Cable (3x120 sqmm) |
56 | Hoisting of40 meter 11 KV XLPE Cable (3x120 Sqmm) on double pole including the jumpering complete with clamps , nut and bolts |
57 | Fixng of 11 KV XLPE Cable Box (3x120 sqmm0 O/D |
58 | Erection& Fixing of 11 KV Pilfer Proof metering Cublical |
59 | Erction of Stay with grouting . |
60 | Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
61 | Provioding & Fixing stonePad |
62 | Provioding & Fixing.Danger Board with Clamps. |
63 | Provioding & Fixing.Number Plate |
64 | Provioding & Fixing.Holing Clamps with nut & Bolts . |
65 | Fixing of associated Items i.e.Top Channel-04 No.Pin Insulator with pin-12 Nos. |
66 | For the work of extention of LT Line of M/s Amber Enclave , Saidpur Hawkins , Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly. |
67 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
68 | PCC Pole (8.5 Mtr. Long) |
69 | AB Cable (3x120 sqmm) |
70 | Distribution Box 03 Phase |
71 | Saty Set |
72 | Erection Work |
73 | Erection ofPCC Pole including digging of pit & grouting work complete and fitting of all accessories complete. |
74 | Laying ,Stringing &Sagging of A BCable (3x120 sqmm) |
75 | Erection of Stay Set with grouting |
76 | Erection & Fixing of Distribution Box 03 Phase alongwith making all conections . |
77 | Provioding & Fixing.Suspention Clapms with I-HOOK . |
78 | Provioding & Fixing of Dead End Clapms |
79 | Provioding & Fixing of Holding Clapms with nut & Bolts |
80 | For thw eok of extention of Load 90 KW to 405 KW of M/s Mahalaxmi Chemicals, C.B. Ganj, Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly. |
81 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
82 | 11 KV XLPE Cable (3x120 sqmm) |
83 | 11 KV Cable Box (3x120 sqmm) O/D |
84 | 11 KV Pilfer Proof metering Cublical |
85 | Erection Work |
86 | Laying of 11 KV XLPE Cable (3x120 sqmm) |
87 | Fixng of 11 KV XLPE Cable Box (3x120 sqmm) O/D |
88 | Dismentling ofOld existing 11 KV Pilfer Proof metering Cublica and back carriagefrom Site to Central Store C.B Ganj,Bareilly . |
89 | Erection& Fixing of 11 KV Pilfer Proof metering Cublical |
90 | Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5” Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
91 | For the work of Extenstion of Load M/s Super Batteries ,Parsakhera Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly |
92 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
93 | ST Pole (11 Meter Long) |
94 | 11 KV XLPE Cable (3x70 sqmm) |
95 | 11 KV XLPE Cable Box (3x70 sqmm) |
96 | 11 KV Pilfer Proof metering Cublical |
97 | Other Line Materials |
98 | Erection Work |
99 | Erection ofST D/poleincluding digging of pit & grouting work complete and fitting of all accessories complete |
100 | Laying of 11 KV XLPE Cable (3x70 sqmm) |
101 | Fixng of 11 KV XLPE Cable Box (3x70 sqmm) O/D |
102 | Erection& Fixing of 11 KV Pilfer Proof metering Cublical |
103 | Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
104 | Erathing of Poles . |
105 | Provioding & Fixing.Holing Clamps with nut & Bolts |
106 | Fixing of associated Items i.e.Top Channel-02 No.Pin Insulator with pin-12 Nos., Base Angle-02 No. |
107 | For the work of Extenstion of Load M/s Vishnu Steel,Parsakhera Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly |
108 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. |
109 | ST Pole (11 Meter Long) |
110 | 11 KV XLPE Cable (3x120 sqmm) |
111 | 11 KV XLPE Cable Box (3x120 sqmm) |
112 | 11 KV Pilfer Proof metering Cublical |
113 | Other Line Materials |
114 | Erection Work |
115 | Erection ofST D/poleincluding digging of pit & grouting work complete and fitting of all accessories complete |
116 | Laying of 11 KV XLPE Cable (3x120 sqmm) |
117 | Hoisting of30 meter 11 KV XLPE Cable (3x120 Sqmm) on double pole bote with proviodingGI pipe(12 Meter) of size 6" dia including the jumpering complete with clamps , nut and bolts. |
118 | Fixng of 11 KV XLPE Cable Box (3x120 sqmm) O/D |
119 | Erection& Fixing of 11 KV Pilfer Proof metering Cublical |
120 | Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
121 | Erathing of Poles . |
122 | Provioding & Fixing.Holing Clamps with nut & Bolts |
123 | Fixing of associated Items i.e.Top Channel-02 No.Pin Insulator with pin-12 Nos., Base Angle-02 No. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail