Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw (Lnv-1) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly , bareilly-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw (Lnv-1) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly . Submission Date for this Tender is 17-05-2024. Electrification Work Tenders in bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43280144
Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw (Lnv-1) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly
Open Tender
Indian
Uttar Pradesh
bareilly
17-05-2024

Tender Details

Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw ( Lnv-1 ) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 2 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 3 Pcc Pole ( 8.5 Metre Long ) 4 Distribution Box 03 Phase 5 Abc Cable ( 3X50 Sqmm ) 6 Stay Set 7 Erection Work 8 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 9 Laying , Stringing &Sagging Of A B Cable ( 3X50 Sqmm ) 10 Erection Of Stay Set With Graouting 11 Fixing Of Distribution Box Alongwith Making All Connections . 12 Providing & Fixing Of Suspention Clamps Wiyth I-Hook 13 Providing & Fixing Of Dead End Clamps 14 Forthe Work Of Giving New Connection To Shri Manohar Sahani, Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 15 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 16 Pcc Pole ( 8.5 Mtr. Long ) 17 Abc Cable ( 3X50 Sqmm ) 18 Distribution Box 03 Phase 19 Stay Set 20 Erection Work 21 Erection Of Pcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 22 Laying , Stringing &Sagging Of A B Cable ( 3X50 Sqmm ) 23 Erection Of Stay Set With Grouting 24 Fixing Of Distribution Box Alongwith Making All Connections . 25 Providing & Fixing Of Suspention Clamps Wiyth I-Hook 26 Providing & Fixing Of Dead End Clamps 27 For The Work Of Shifting Of Ht Lines In Front Of Shri Sailesh Agarwal , Parsakhera , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 28 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 29 St Pole ( 11 Meter Long ) 30 Acsr Dog Conductor 31 Stay Set 32 Other Line Materails 33 Erection Work 34 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 35 Erection Ofst Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 36 Laying , Stringing &Sagging Of Dog Conductor 37 Erathing Of Poles . 38 Erection Of Stay Set With Grouting 39 Provioding & Fixing Barbed Wire . 40 Provioding & Fixingholding Clampswith Nuts & Bolts 41 Provioding & Fixing.Danger Board With Clamps. 42 Fixing Of Associated Items I.E.Top Channel-04 No., T-Off Channel- 03 No., Base Angle -03 Nos., Disc Fitting-15 No., Pin Insulator With Pin-20 Nos. 43 For The Work Of Giving New Connection Of 200 Kva To M / S Aman Industries At, Maheshpur Ataria, C.B. Ganj, Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 44 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 45 St Pole ( 11 Meter Long ) 46 Acsr Dog Conductor 47 11 Xlpe Cable ( 3X120 Sqmm ) 48 11 Kv Pilfer Proof Metering Cublical 49 11 Kv Xlpe Cable Box ( 3X120 Sqmm0 O / D 50 Stay Set 51 Other Line Materials 52 Erection Work 53 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 54 Laying , Stringing &Sagging Of Dog Conductor 55 Laying Of11 Kv Xlpe Cable ( 3X120 Sqmm ) 56 Hoisting Of40 Meter 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Including The Jumpering Complete With Clamps , Nut And Bolts 57 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm0 O / D 58 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 59 Erction Of Stay With Grouting . 60 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 61 Provioding & Fixing Stonepad 62 Provioding & Fixing.Danger Board With Clamps. 63 Provioding & Fixing.Number Plate 64 Provioding & Fixing.Holing Clamps With Nut & Bolts . 65 Fixing Of Associated Items I.E.Top Channel-04 No.Pin Insulator With Pin-12 Nos. 66 For The Work Of Extention Of Lt Line Of M / S Amber Enclave , Saidpur Hawkins , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 67 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 68 Pcc Pole ( 8.5 Mtr. Long ) 69 Ab Cable ( 3X120 Sqmm ) 70 Distribution Box 03 Phase 71 Saty Set 72 Erection Work 73 Erection Ofpcc Pole Including Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete. 74 Laying , Stringing &Sagging Of A Bcable ( 3X120 Sqmm ) 75 Erection Of Stay Set With Grouting 76 Erection & Fixing Of Distribution Box 03 Phase Alongwith Making All Conections . 77 Provioding & Fixing.Suspention Clapms With I-Hook . 78 Provioding & Fixing Of Dead End Clapms 79 Provioding & Fixing Of Holding Clapms With Nut & Bolts 80 For Thw Eok Of Extention Of Load 90 Kw To 405 Kw Of M / S Mahalaxmi Chemicals, C.B. Ganj, Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 81 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 82 11 Kv Xlpe Cable ( 3X120 Sqmm ) 83 11 Kv Cable Box ( 3X120 Sqmm ) O / D 84 11 Kv Pilfer Proof Metering Cublical 85 Erection Work 86 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) 87 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) O / D 88 Dismentling Ofold Existing 11 Kv Pilfer Proof Metering Cublica And Back Carriagefrom Site To Central Store C.B Ganj, Bareilly . 89 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 90 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5” Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 91 For The Work Of Extenstion Of Load M / S Super Batteries , Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly 92 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 93 St Pole ( 11 Meter Long ) 94 11 Kv Xlpe Cable ( 3X70 Sqmm ) 95 11 Kv Xlpe Cable Box ( 3X70 Sqmm ) 96 11 Kv Pilfer Proof Metering Cublical 97 Other Line Materials 98 Erection Work 99 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 100 Laying Of 11 Kv Xlpe Cable ( 3X70 Sqmm ) 101 Fixng Of 11 Kv Xlpe Cable Box ( 3X70 Sqmm ) O / D 102 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 103 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 104 Erathing Of Poles . 105 Provioding & Fixing.Holing Clamps With Nut & Bolts 106 Fixing Of Associated Items I.E.Top Channel-02 No.Pin Insulator With Pin-12 Nos., Base Angle-02 No. 107 For The Work Of Extenstion Of Load M / S Vishnu Steel, Parsakhera Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly 108 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 109 St Pole ( 11 Meter Long ) 110 11 Kv Xlpe Cable ( 3X120 Sqmm ) 111 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) 112 11 Kv Pilfer Proof Metering Cublical 113 Other Line Materials 114 Erection Work 115 Erection Ofst D / Poleincluding Digging Of Pit & Grouting Work Complete And Fitting Of All Accessories Complete 116 Laying Of 11 Kv Xlpe Cable ( 3X120 Sqmm ) 117 Hoisting Of30 Meter 11 Kv Xlpe Cable ( 3X120 Sqmm ) On Double Pole Bote With Proviodinggi Pipe ( 12 Meter ) Of Size 6 Dia Including The Jumpering Complete With Clamps , Nut And Bolts. 118 Fixng Of 11 Kv Xlpe Cable Box ( 3X120 Sqmm ) O / D 119 Erection& Fixing Of 11 Kv Pilfer Proof Metering Cublical 120 Earthing Of11 Kv Pilfer Proof Meetring Cubical Water Level Body & Neutral, With Gi Pipe Of 1.5 Dia. Including Mild Steel Strip Size 35X6 Mm. ( Material Will Be Supplied By Contractor ) . 121 Erathing Of Poles . 122 Provioding & Fixing.Holing Clamps With Nut & Bolts 123 Fixing Of Associated Items I.E.Top Channel-02 No.Pin Insulator With Pin-12 Nos., Base Angle-02 No.

Key Value

Document Fees
INR 1180 /-
EMD
INR 4350.0 /-
Tender Value
INR 4.35 Lakhs /-

BOQ Items

Name of Work: : Different Electrification work under Deposit Scheme 2024-25 under EUDD-II Bareilly.
Sl. No. Item Description
1Forthe work of giving new connection of 02 KW (LNV-1) to Smt. Naresh Kumari , Golul Dham Colony , Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
2Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
3PCC Pole (8.5 Metre Long)
4Distribution Box 03 Phase
5ABC Cable (3x50 sqmm)
6Stay Set
7Erection Work
8Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
9Laying ,Stringing &Sagging of A B Cable (3x50 sqmm)
10Erection of Stay Set with graouting
11Fixing of Distribution Box alongwith making all connections .
12Providing & Fixing of suspention clamps wiyth I-Hook
13Providing & Fixing of Dead End Clamps
14Forthe work of giving new connection to Shri Manohar sahani,Parsakhera Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
15Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
16PCC Pole(8.5 Mtr. Long)
17ABC Cable (3x50 sqmm)
18Distribution Box 03 Phase
19Stay Set
20Erection Work
21Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
22Laying ,Stringing &Sagging of A B Cable (3x50 sqmm)
23Erection of Stay Set with grouting
24Fixing of Distribution Box alongwith making all connections .
25Providing & Fixing of suspention clamps wiyth I-Hook
26Providing & Fixing of Dead End Clamps
27For the work of Shifting of HT Lines in front of Shri Sailesh Agarwal , parsakhera ,Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
28Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
29ST Pole (11 Meter Long)
30ACSR Dog Conductor
31Stay Set
32Other Line materails
33Erection Work
34Erection ofST D/Poleincluding digging of pit & grouting work complete and fitting of all accessories complete.
35Erection ofST Poleincluding digging of pit & grouting work complete and fitting of all accessories complete.
36Laying ,Stringing &Sagging of Dog Conductor
37Erathing of Poles .
38Erection of Stay Set with grouting
39Provioding & Fixing Barbed Wire .
40Provioding & FixingHolding Clampswith nuts & Bolts
41Provioding & Fixing.Danger Board with Clamps.
42Fixing of associated Items i.e.Top Channel-04 No.,T-off Channel- 03 No.,Base Angle -03 nos., Disc fitting-15 No., Pin Insulator with pin-20 Nos.
43For the work of Giving New Connection of 200 kva to M/s Aman Industries at, Maheshpur Ataria, C.B. Ganj,Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
44Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
45ST Pole (11 Meter Long)
46ACSR Dog Conductor
4711 XLPE Cable (3x120 sqmm)
4811 KV Pilfer Proof metering Cublical
4911 KV XLPE Cable Box (3x120 sqmm0 O/D
50Stay Set
51Other Line Materials
52Erection Work
53Erection ofST D/Poleincluding digging of pit & grouting work complete and fitting of all accessories complete.
54Laying ,Stringing &Sagging of Dog Conductor
55Laying of11 KV XLPE Cable (3x120 sqmm)
56Hoisting of40 meter 11 KV XLPE Cable (3x120 Sqmm) on double pole including the jumpering complete with clamps , nut and bolts
57Fixng of 11 KV XLPE Cable Box (3x120 sqmm0 O/D
58Erection& Fixing of 11 KV Pilfer Proof metering Cublical
59Erction of Stay with grouting .
60Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
61Provioding & Fixing stonePad
62Provioding & Fixing.Danger Board with Clamps.
63Provioding & Fixing.Number Plate
64Provioding & Fixing.Holing Clamps with nut & Bolts .
65Fixing of associated Items i.e.Top Channel-04 No.Pin Insulator with pin-12 Nos.
66For the work of extention of LT Line of M/s Amber Enclave , Saidpur Hawkins , Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
67Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
68PCC Pole (8.5 Mtr. Long)
69AB Cable (3x120 sqmm)
70Distribution Box 03 Phase
71Saty Set
72Erection Work
73Erection ofPCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
74Laying ,Stringing &Sagging of A BCable (3x120 sqmm)
75Erection of Stay Set with grouting
76Erection & Fixing of Distribution Box 03 Phase alongwith making all conections .
77Provioding & Fixing.Suspention Clapms with I-HOOK .
78Provioding & Fixing of Dead End Clapms
79Provioding & Fixing of Holding Clapms with nut & Bolts
80For thw eok of extention of Load 90 KW to 405 KW of M/s Mahalaxmi Chemicals, C.B. Ganj, Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly.
81Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
8211 KV XLPE Cable (3x120 sqmm)
8311 KV Cable Box (3x120 sqmm) O/D
8411 KV Pilfer Proof metering Cublical
85Erection Work
86Laying of 11 KV XLPE Cable (3x120 sqmm)
87Fixng of 11 KV XLPE Cable Box (3x120 sqmm) O/D
88Dismentling ofOld existing 11 KV Pilfer Proof metering Cublica and back carriagefrom Site to Central Store C.B Ganj,Bareilly .
89Erection& Fixing of 11 KV Pilfer Proof metering Cublical
90Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5” Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
91For the work of Extenstion of Load M/s Super Batteries ,Parsakhera Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly
92Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
93ST Pole (11 Meter Long)
9411 KV XLPE Cable (3x70 sqmm)
9511 KV XLPE Cable Box (3x70 sqmm)
9611 KV Pilfer Proof metering Cublical
97Other Line Materials
98Erection Work
99Erection ofST D/poleincluding digging of pit & grouting work complete and fitting of all accessories complete
100Laying of 11 KV XLPE Cable (3x70 sqmm)
101Fixng of 11 KV XLPE Cable Box (3x70 sqmm) O/D
102Erection& Fixing of 11 KV Pilfer Proof metering Cublical
103Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
104Erathing of Poles .
105Provioding & Fixing.Holing Clamps with nut & Bolts
106Fixing of associated Items i.e.Top Channel-02 No.Pin Insulator with pin-12 Nos., Base Angle-02 No.
107For the work of Extenstion of Load M/s Vishnu Steel,Parsakhera Bareilly under Full deposited fund-2024-25 under EUDD-II, Bareilly
108Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
109ST Pole (11 Meter Long)
11011 KV XLPE Cable (3x120 sqmm)
11111 KV XLPE Cable Box (3x120 sqmm)
11211 KV Pilfer Proof metering Cublical
113Other Line Materials
114Erection Work
115Erection ofST D/poleincluding digging of pit & grouting work complete and fitting of all accessories complete
116Laying of 11 KV XLPE Cable (3x120 sqmm)
117Hoisting of30 meter 11 KV XLPE Cable (3x120 Sqmm) on double pole bote with proviodingGI pipe(12 Meter) of size 6" dia including the jumpering complete with clamps , nut and bolts.
118Fixng of 11 KV XLPE Cable Box (3x120 sqmm) O/D
119Erection& Fixing of 11 KV Pilfer Proof metering Cublical
120Earthing of11 KV Pilfer Proof meetring Cubical water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
121Erathing of Poles .
122Provioding & Fixing.Holing Clamps with nut & Bolts
123Fixing of associated Items i.e.Top Channel-02 No.Pin Insulator with pin-12 Nos., Base Angle-02 No.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail