Paschimanchal Vidyut Vitran Nigam Limited has published Tender For The Work Of Increasing The Capacity Of Overloaded 11/0.4 Kv Sub-Stations Under Electricity Urban Distribution Division-Iii, Muzaffarnagar Under The Business Plan Year 2024-25 Scheme.. Submission Date for this Tender is 20-05-2024. Electrification Work Tenders in muzaffarnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 07-May-2024 | Date extension | Date | 13-05-2024 |
2 | 13-May-2024 | Date Extension2 | Date | 20-05-2024 |
FileName | File Description | File Size |
a544681f-ea24-4137-a0e8-bc526fb4dde5.html | Tender Notice | 0 KB |
123to138DE..pdf | Tender Document | 0 KB |
BOQ_1595633.xls | Tender Document | 0 KB |
TenderDocument135202324.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
TermsConditions135202324.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Carriage of Following line materials from ESC, Muzaffarnagar to work sites including safe loading and unloading at both ends as per site condition |
2 | 100 KVA T/F |
3 | 250 KVA T/F |
4 | ACSR Weasel conductor |
5 | 11 KV poly pin insulator |
6 | 11 KV poly disc insulator with fitting |
7 | 1x120 Sqmm LTXLPE Cable |
8 | 1x240 Sqmm LTXLPE Cable |
9 | 1x400 Sqmm LTXLPE Cable |
10 | ABC 3x95 sqmm |
11 | PCC 11 Mtr. long |
12 | PCC 8.5 Mtr. long |
13 | MS Channel |
14 | 11 KV D/o fuse set |
15 | 3 Ph. Distribution Box |
16 | Errection of double Pole 8.5/11 Mtr long and fixing all Accessories as per norms (Nuts, Bolts, Washer and Clamps will be provided by contractor) |
17 | Grouting of PCC pole with cement, sand, bricks CC ratio1:4:5 as per RESPO norms (all materila provided by contractor) |
18 | Laying of LT ABC 3x95 sqmm |
19 | Laying of ACSR Weasel conductor |
20 | Laying of 1x120 Sqmm LTXLPE Cable |
21 | Laying of 1x240 Sqmm LTXLPE Cable |
22 | Laying 1x400 Sqmm LTXLPE Cable |
23 | Installation of 100 KVA T/f with all accessories on pole as per norms (Nut, Bolts, washer and Crimping Lugs will be provided by contractor) |
24 | Installation of 250 KVA T/f with all accessories on Plinth as per norms (Nut, Bolts, washer and Crimping Lugs will be provided by contractor) |
25 | Febrication and fixing of MS channel/angle |
26 | Errection of 11 KV D/o fuse set on double pole |
27 | Installatino of 3 ph. distribution box. |
28 | Construction of plinth with cement, sand & bricks for 250 KVA T/F placing as per RESPO (all material provided by contractor) |
29 | Providing of iron fencing for 250 KVA Transformer as per RESPO norms. |
30 | Chemical earthing for T/F body as per RESPO norms. (All material provided by contractor) |
31 | Chemical earthing for T/F Neutral as per RESPO norms. (All material provided by contractor) |
32 | Dismentling of Following line materials and carriage from work site to ESC, Muzaffarnagar including safe loading and unloading at both ends as per site condition |
33 | 63 KV T/F old and used |
34 | 100 KV T/F old and used |