}

Tender For Repair /Maintenance Of Mt Vehicles And T And P Of Ge (Af) Stn Thoise Under Ge (Af) Thoise, Thoise-Jammu And Kashmir

Military Engineer Services-MES has published Tender For Repair /Maintenance Of Mt Vehicles And T And P Of Ge (Af) Stn Thoise Under Ge (Af) Thoise. Submission Date for this Tender is 22-05-2024. Vehicle Maintenance Service Tenders in Thoise Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43279243
Tender For Repair /Maintenance Of Mt Vehicles And T And P Of Ge (Af) Stn Thoise Under Ge (Af) Thoise
Open Tender
Indian
Jammu And Kashmir
Thoise
22-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Repair / Maintenance Of Mt Vehicles And T And P Of Ge ( Af ) Stn Thoise Under Ge ( Af ) Thoise

Key Value

Document Fees
INR 500 /-
EMD
INR 16000.0 /-
Tender Value
INR 8 Lakhs /-

Attachment

FileName File Description File Size
ca79b713-7179-4af3-bd16-aadc7e1e2096.html Tender Notice 0 KB
appdx.pdf Tender Document 0 KB
BOQ_729695.xls Tender Document 0 KB
tender.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work : REPAIR/ MAINT OF MT VEHICLES AND T&P OF GE (AF) STN THOISE UNDER GE (AF) THOISE
Sl. No. Item Description
1REPAIRS TO EICHER10.70/10.75:( From item No 1.01 to 1.25) M&L Taking out carefully Diesel Engine from Eicher10.70/10.75, Opening/ dismantlling Head Assembly Complete of Diesel Engine, Piston, Piston Rings, Connecting Rod and Crank Shaft, etc. complete in all respect and carry out the Machine Work, Re-metaling, Grinding, Polishing of Crank Shaft and Lapping, Housing, Reaming and Making Valve Seat of Head and Other Component of Head Assembly Standard size of worn out Spares as required, Replacement of Parts and Re-assembling after fitting of Parts, fitting of Diesel Engine after found Serviceable into the Vehicle, applying Two Coats of Aluminium Paint after making Surface Smooth and applying One Coat of Primer on Exhaust Pipe from Exhaust Valves to Silencer Assembly and Testing after Completion (after Running of Engine minimum 8-10 Hours on Static Run) On Full Load, complete all as specified and as directed. NOTE: Spares/Parts of the Diesel Engine will be Measured and Paid for separately as ‘Supply only’ here-in-after under Item No. 1.03 to 1.25
2M&L Denting Work where needed on Complete Vehicle EICHER 10.70/ 10.75, Removing Old Paint by scraping, cleaning with Caustic Soda and making surfaces Even and Smooth by applying Putty, Rubbing, Cutting, Polishing all as required and applying One Coat of Primer and Two Coat of NC Paint by Spray Painting in separate Booth (Workshop) as per existing Paint/Shape by preventing Non Painting Parts (as ordered by Engineer-in-Charge) including application Two Coats of Anti Corrosive Black Paint to Flooring Both Sides of Wheel Mud Guard Under Courage, Writing Vehicle BA No., Firm Name, complete all as specified and as directed. NOTE : Colour of Paint& Writing Vehicle BA No. & Firm Name will be decided by Engineer-in-Charge.
3M&L Opening/Dismantling carefully Fuel Injection Pump from EICHER 10.70/10.75, complete Servicing/Repair/Replacement of following unserviceable Parts (as approved/ as per existing Size and Make), Grinding of Nozzles Complete and Re-fixing the Same, Testing on completion, complete all as specified and as directed :- (a)Bearing - 04 No. (b)Bearing Bush - 04 No. (c)Delivery Valve - 04 No. (d)Fuel Pipe Line - 04 No. (e)Niddle Valve - 04 No. (e)Plunger - 04 No. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
4M&L Opening Dynamo from EICHER 10.70/10.75 for Servicing /Overhauling (at Contractor’s Workshop) including Replacement of Carbon Bushes, Armature Winding and Bush Bearing, Re-assembling and fixing to Vehicle including Testing, complete all as specified and as directed. MAKE : MICO/LUCAS or as approved NOTE : Cost of Materials required for Servicing /Overhauling and New Parts will deem to be included in the Quoted Unit Rate.
5M&L Opening Self Starter from EICHER 10.70/10.75 for Servicing/ Overhaulingat Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS or equivalent as recommended by Manufacturers.
6M&L Taking out/down the existing Clutch System from EICHER 10.70/ 10.75, Replacement of Clutch Plate (MAKE : CEEKAY/REPCO), Pressure Plate (MAKE : CEEKAY/REPCO), Withdral Bearing (MAKE : SKF/ CEEKAY) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
7M&L Taking out Front/Rear Wheels Complete from EICHER10.70/10.75, Cleaning, Polishing & Overhauling ofBrake System (2x4 No. of Wheels) by providing New Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/ RANE/ BOSCH), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/ Disc/ Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing All Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed.
8M&L Repairing/Servicing carefully of Water Pump alongwith Waterbody Assembly with necessary Accessories for EICHER10.70/10.75, repalcing Unserviceable Parts with existing shape/size, re-fitting the same, Testing on completion, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
9M&L Brake Master Cylinder Kit suitable for EICHER10.70/10.75 including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS or as approved
10M&L Cabin Desh Board suitable for EICHER10.70/10.75 complete as per existing Size and Shape including dismantaling existing broken/ scrached Desh Board carefully with all Accessories and Fittings, complete all as specified and as directed. MAKE : EICHER or as approved
11M&L Cabin Roof Clothes/Rexin (as approved) suitable for EICHER10.70/10.75including removing existing Cabin Roof Clothes/Rexin, complete all as specified and as directed. NOTE :Clothes/Rexin sample and colour will be decided by Engineer-in-Charge.
12M&L Front Wind Glass (as approved/ as per existing Size/Shape) suitable for EICHER 10.75, Checking/Servicing of Locking System and Minor Repairing of Opening/Closing of Window Glass including Taking down/out unserviceable Front Wind Glass by Inner Board/Cover, complete all as specified and as directed. MAKE : EICHER or as approved
13M&L Plastic Grill Bonnet Central Assembly (as approved) suitable for EICHER10.70/10.75 as per existing Shape and Size Opening including dismantaling existing broken Plastic Grill Bonnet Central Assembly, complete all as specified and as directed. MAKE : EICHER or as approved
14M&L Seat Covers (as approved/ as per existing) suitable for EICHER10.70/10.75 and fixing properly including Taking down wornout upholstry from Vehicle, complete all as specified and as directed. NOTE : Seat Covers will be as approved by GE/Engineer-in-Charge.
15M&L Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for EICHER10.75 including removing existing Seat Covers, Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed. MAKE : KK/LUCAS/TATA GENUINE
16M&L Side Indicator Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for EICHER10.70/10.75 including Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE :KK/LUCAS or as approved
17M&L Tail Light Assembly Complete (Brake Light/ Side Indicator Light/ Parking Light) with Lamps of appropriate Wattage and suitable for EICHER 10.70/10.75, Testing on Completion including Taking down/out Unserviceable Tail Light Assembly, complete all as specified and as directed. MAKE :KK/LUCAS/TATA GENUINE
18M&L Window Inner Cover as per existing Shape and Size including Checking/ Servicing of Locking System and Minor Repair of Opening /Closing of Window Glass for EICHER10.70/10.75 including removing/taking out Unserviceable Window Inner Cover, complete all as specified and as directed. MAKE : EICHER or as approved
19M&L Window Door Handle with Key & Lock - 1 No., without Key - 1 No. suitable for EICHER10.70/10.75 as per existing Size and Shape including dismantaling existing broken Window Door Handle carefully, complete all as specified and as directed. MAKE : EICHER or as approved
20M&L Window Rear View Mirror (as approved/ as per existing) suitable for EICHER10.70/10.75 including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD or as approved
21S&F Air Filter (as approved/ as per existing) suitable for EICHER10.70/10.75including Taking down existing Air Filter, complete all as as specified and as directed. MAKE : MICO/ELOFIC/ LEYPART
22S&F Diesel Filter (as approved/ as per existing) suitable for EICHER 10.70/10.75including Taking down existing Diesel Filter, complete all as as specified and as directed. MAKE :ELOFIC/ LEYPART/ MICO
23S&F Oil Filter (as approved/ as per existing) suitable for EICHER10.70/10.75 including Taking down existing Oil Filter, complete all as as specified and as directed. MAKE : MICO/ELOFIC/LEYPART
24M&L Fuel Gauge and Meter including Wiring System, suitable for EICHER10.70/10.75, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed. MAKE : EICHER or as approved
25M&L Temperature Gauge and Meter including Wiring System, suitable for EICHER 10.70/10.75, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed. MAKE : EICHER or as approved
26REPAIRS TO TATA Xenon 3.0:( From item No 2.01 to 1.27) M&L Taking out carefully Diesel Engine from TATA Xenon 3.0L , Opening/ dismantlling Head Assembly Complete of Diesel Engine, Piston, Piston Rings, Connecting Rod and Crank Shaft, etc. complete in all respect and carry out the Machine Work, Re-metaling, Grinding, Polishing of Crank Shaft and Lapping, Housing, Reaming and Making Valve Seat of Head and Other Component of Head Assembly Standard size of worn out Spares as required, Replacement of Parts and Re-assembling after fitting of Parts, fitting of Diesel Engine after found Serviceable into the Vehicle, applying Two Coats of Aluminium Paint after making Surface Smooth and applying One Coat of Primer on Exhaust Pipe from Exhaust Valves to Silencer Assembly and Testing after Completion (after Running of Engine minimum 8-10 Hours on Static Run) On Full Load, complete all as specified and as directed. NOTE: Spares/Parts of the Diesel Engine will be Measured and Paid for separately as ‘Supply only’ here-in-after under Item No. 2.03 to 2.27.
27M&L Denting Work where needed on Complete Vehicle TATA Xenon 3.0L, Removing Old Paint by scraping, cleaning with Caustic Soda and making surfaces Even and Smooth by applying Putty, Rubbing, Cutting, Polishing all as required and applying One Coat of Primer and Two Coats of NC Paint by Spray Painting in separate Booth (Workshop) as per existing Paint/Shape by preventing Non Painting Parts (as ordered by Engineer-in-Charge) including application Two Coats of Anti Corrosive Black Paint to Flooring both sides of Wheel Mud Guard under Courage, Writing Vehicle BA No., Firm Name, complete all as specified and as directed. NOTE : Colour of Paint& Writing Vehicle BA No. & Firm Name will be decided by Engineer-in-Charge.
28M&L Opening Alternator from TATA Xenon 3.0L for Servicing /Overhauling (at Contractor’s Workshop) including Replacement of Carbon Bushes, Armature Winding and Bush Bearing, Re-assembling and fixing to Vehicle including Testing, complete all as specified and as directed. MAKE : Siemens AG/ Cummins or as approved NOTE : Cost of Materials required for Servicing /Overhauling and New Parts will deem to be included in the Quoted Unit Rate.
29M&L Opening Self Starter from TATA Xenon 3.0L for Servicing/Overhaulingat Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS or equivalent as recommended by Manufacturers.
30M&L Opening/Dismantaling Suspension System (Complete) from the TATA Xenon 3.0L and replacement of Front Suspension Complete, Anti-Roll Bars, Rear Suspension complete, Shock Absorbers with necessary Nut, Bolts, Washers, etc. complete all as specified and as directed. MAKE : TATA Xenon or as approved
31M&L Opening Complete Window with Inner Flap, Locking, Opening (Outer and Inner) Arrangements, Servicing and Minor Repairs for Opening and Closing of Window Mirror including replacement of Locking Button, Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle for TATA Xenon and re-fixing of all Parts, Testing on completion, complete all as specified and as directed. NOTE : New Parts will be as per existing One and as approved by GE/ Engineer-in-Charge.
32M&L Repairing/Servicing carefully of Water Pump alongwith Waterbody Assembly with necessary Accessories for TATA Xenon 3.0L, repalcing Unserviceable Parts with existing shape/ size, re-fitting the same, Testing on completion, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
33M&L Taking down the existing Clutch System from TATA Xenon 3.0L, Replacement of Clutch Plate (MAKE : REPCO/ TATA GENUINE), Pressure Plate (MAKE : REPCO/ TATA GENUINE), Withdral Bearing (MAKE : SKF/ REPCO/ TATA GENUINE) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
34M&L Taking down Complete Gear Box from TATA Xenon 3.0L by Opening, Dismantall-ing, Taking Out All Parts, Cleaning of Serviceable Parts with Petrol, Replacement of Unserviceable Parts, Re-assembling Gear Box and Re-fixing to Vehicle, Testing on completion for the smooth functioning of shifting of all Forward and Reverse Gear, complete all as specified and as directed. MAKE : MARUTI GENUINE/ZF or as approved NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
35M&L Taking down Complete Steering System from TATA Xenon 3.0Lby Opening/ Dismantalling, Taking Out All Parts, Cleaning of Serviceable Parts and Replace-ment of Unserviceable Parts (Steering Column, Tie Rod, Spindles, Universal Joints, Pitman Arm, Steering Gear Box Assembly, Drag Link Assembly) and Re-assembling and fixing to Vehicle and Testing on completion, complete all as as specified and as directed. MAKE : MARUTI GENUINE/RANE/ZF or as approved NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
36M&L Taking out Front/Rear Wheels Complete from TATA Xenon 3.0L, Cleaning, Polishing & Overhauling ofBrake System (of 2x2 No. of Wheels) by providing new Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/BOSCH/TATA GENUINE), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/Disc/Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing all Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed.
37M&L Brake Master Cylinder Kit suitable for TATA Xenon 3.0L including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS/ TATA GENUINE or as approved
38M&L Seat Covers (as approved/ as per existing) suitable for TATA Xenon 3.0Land fixing properly including Taking down wornout upholstry from Vehicle, complete all as specified and as directed. NOTE : Seat Covers will be as approved by GE/Engineer-in-Charge.
39M&L Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for TATA Xenon 3.0Lincluding removing existing Seat Covers, Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed. MAKE : KK/LUCAS/TATA GENUINE
40M&L Side Indicator Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for TATA Xenon 3.0Lincluding Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : LUCAS or as approved
41M&L Tail Light Assembly Complete (Brake Light/ Side Indicator Light/ Parking Light) with Lamps of appropriate Wattage and suitable for TATA Xenon, Testing on Completion including Taking down/out Unserviceable Tail Light Assembly, complete all as specified and as directed. MAKE :KK/LUCAS/TATA GENUINE
42M&L Window Rear View Mirror (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD/TATA GENUINE or as approved
43S&F Air Filter (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Air Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA
44S&F Diesel Filter (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Diesel Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA
45S&F Oil Filter (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Oil Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA
46S&F Alternator (as approved/ as per existing), 12 Volt suitable for TATA xenon 3.0L including removing existing Alternator, complete all as specified and as directed. MAKE : LUCAS/ MICO or as approved
47M&L Temperature Gauge and Meter including Wiring System, suitable for TATA Xenon 3.0L, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed. MAKE : TATA or as approved
48Supply only Bearing Set for Connecting Rod (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved
49Supply only Connecting Rod Bush Set (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved
50Supply only Oil Pump Gear (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved
51Supply only Piston Ring Standard (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L , complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved
52Supply only V Belt Cogged (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved
53REPAIRS TO MARUTI GYPSY KING HARD TOP 4X4:( From item No 3.01 to 3.19) M&L Taking out carefully Diesel Engine from Maruti Gypsy dismantlling Head Assembly Complete of Diesel Engine, Piston, Piston Rings, Connecting Rod and Crank Shaft, etc. complete in all respect and carry out the Machine Work, Re-metaling, Grinding, Polishing of Crank Shaft and Lapping, Housing, Reaming and Making Valve Seat of Head and Other Component of Head Assembly Standard size of worn out Spares as required, Replacement of Parts and Re-assembling after fitting of Parts, fitting of Diesel Engine after found Serviceable into the Vehicle, applying Two Coats of Aluminium Paint after making Surface Smooth and applying One Coat of Primer on Exhaust Pipe from Exhaust Valves to Silencer Assembly and Testing after Completion (after Running of Engine minimum 8-10 Hours on Static Run) On Full Load, complete all as specified and as directed. NOTE: Spares/Parts of the Diesel Engine will be Measured and Paid for separately as ‘Supply only’ here-in-after under Item No. 3.03 to3.19 .
54M&L Denting Work where needed on Complete Vehicle Maruti Gypsy, Removing Old Paint by scraping, cleaning with Caustic Soda and making surfaces Even and Smooth by applying Putty, Rubbing, Cutting, Polishing all as required and applying One Coat of Primer and Two Coats of NC Paint by Spray Painting in separate Booth (Workshop) as per existing Paint/Shape by preventing Non Painting Parts (as ordered by Engineer-in-Charge) including application Two Coats of Anti Corrosive Black Paint to Flooring both sides of Wheel Mud Guard under Courage, Writing Vehicle BA No., Firm Name, complete all as specified and as directed. NOTE : Colour of Paint& Writing Vehicle BA No. & Firm Name will be decided by Engineer-in-Charge.
55M&L Opening Self Starter from Maruti Gypsy for Servicing/Overhaulingat Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS or equivalent as recommended by Manufacturers.
56M&L Opening Complete Window with Inner Flap, Locking, Opening (Outer and Inner) Arrangements, Servicing and Minor Repairs for Opening and Closing of Window Mirror including replacement of Locking Button, Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle for Maruti Gypsy and re-fixing of all Parts, Testing on completion, complete all as specified and as directed. NOTE : New Parts will be as per existing One and as approved by GE/ Engineer-in-Charge.
57M&L Repairing/Servicing carefully of Water Pump alongwith Waterbody Assembly with necessary Accessories for Maruti Gypsy, repalcing Unserviceable Parts with existing shape/ size, re-fitting the same, Testing on completion, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
58M&L Taking down the existing Clutch System from Maruti Gypsy, Replacement of Clutch Plate (MAKE : REPCO/ MARUTI GENUINE), Pressure Plate (MAKE : REPCO/ MARUTI GENUINE), Withdral Bearing (MAKE : SKF/ REPCO/ MARUTI GENUINE) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
59M&L Taking down Complete Gear Box from Maruti Gypsy by Opening, Dismantaling, Taking Out All Parts, Cleaning of Serviceable Parts with Petrol, Replacement of Unserviceable Parts, Re-assembling Gear Box and Re-fixing to Vehicle, Testing on completion for the smooth functioning of shifting of all Forward and Reverse Gear, complete all as specified and as directed. MAKE : MARUTI GENUINE/ZF or as approved NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
60M&L Taking down Complete Steering System from Maruti Gypsy by Opening/ Dismantalling, Taking Out All Parts, Cleaning of Serviceable Parts and Replace-ment of Unserviceable Parts (Steering Column, Tie Rod, Spindles, Universal Joints, Pitman Arm, Steering Gear Box Assembly, Drag Link Assembly) and Re-assembling and fixing to Vehicle and Testing on completion, complete all as as specified and as directed. MAKE : MARUTI GENUINE/RANE/ZF or as approved NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate.
61M&L Taking out Front/Rear Wheels Complete from Maruti Gypsy, Cleaning, Polishing & Overhauling ofBrake System (of 4X4 No. of Wheels) by providing new Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/BOSCH/MARUTI GENUINE), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/Disc/Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing all Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed.
62M&L Brake Master Cylinder Kit suitable for Maruti Gypsy including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS/ MARUTI GENUINE or as approved
63M&L Seat Covers (as approved/ as per existing) suitable for Maruti Gypsy and fixing properly including Taking down wornout upholstry from Vehicle, complete all as specified and as directed. NOTE : Seat Covers will be as approved by GE/Engineer-in-Charge.
64M&L Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for Maruti Gypsy including removing existing Seat Covers, Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed. MAKE : KK/LUCAS/MARUTI GENUINE
65M&L Side Indicator Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for Maruti Gypsy including Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : LUCAS or as approved
66M&L Window Rear View Mirror (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD/MARUTI GENUINE or as approved
67S&F Air Filter (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Air Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO
68S&F Fuel Filter (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Fuel Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO
69S&F Oil Filter (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Oil Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA
70M&L Fuel Gauge and Meter including Wiring System, suitable for Maruti Gypsy, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed. MAKE :MARUTI or as approved
71Supply only V Belt Cogged (as approved/ as per existing) suitable for Diesel Engine of Maruti Gypsy, complete all as specified. MAKE : GOETZE/IPL/MARUTI GENUINE/USHA or as approved
72REPAIRS TO MOTOR CYCLEM &Lfor servicing of Motor cycle Bajaj palatina.( Engine oil change, Fuel oil tank cleaning, Spark plug cleaning, Breaking system overhauling, New No Plate fixing and all the consumable items durring running of motor cycle.) NOTE: All the Spares/Parts of the Motor Cycle will be included in the quoted rate of this servicing and servicing of Motor cycle to be done two times in a year.
73MISC ITEMS FOR ALL TYPES VEHICLES:(( From item No 5.01 to 5.13) S&F Banjo Bolt 19 No. with Two Aluminium Washers (as approved/ as per existing sample) suitable for ALL TYPES VEHICLES including down/out existing Banjo Bolt, complete all as specified and as directed.
74S&F Battery Cable Heavy duty jumper booster cable 6 ft .gauge 4 12 v 1200 A cooper suitable for ALL TYPES VEHICLES including Taking down/out existing Battery Cable, complete all as specified and as directed. MAKE : AKKI or equivalent as approved
75S&F Mild Steel Nut & Bolts with Washers of different Sizes (as approved/ as per existing sample) suitable for ALL TYPES VEHICLES including Taking down/out existing Nut & Bolts with Washers, complete all as specified and as directed. MAKE : TVS or as approved
76Supply & Greasing with Grease LG 280 suitable for ALL TYPE VEHICLES including Cleaning Old used Grease, complete all as specified and as directed. MAKE : CASTROL/GULF
77Supply & Filling Brake Oil in 500 ml Packing including Draining out the Outlived Brake Oil, complete all as specified and as directed. MAKE : BOSCH/KBX/TVS GRILLING
78Supply & Filling Engine Oil 10W40 including Draining out the Outlived Engine Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO or equivalent as approved.
79Supply & Filling Gear Oil 75W-90 including Draining out the Outlived Gear Oil, complete all as specified and as directed. MAKE : CASTROL/GULF/HP or equivalent as approved
80Supply & Filling Engine Oil 15W40 including Draining out the Outlived Engine Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO or equivalent as approved.
81Supply & Filling Gear Oil 80W-90 including Draining out the Outlived Gear Oil, complete all as specified and as directed. MAKE : CASTROL/GULF/HP or equivalent as approved
82Supply & Filling Steering Oil including Draining out the Outlived Steering Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO or equivalent as approved
83Supply & Filling Radiator Coolant including Draining out used Radiator Coolent, complete all as specified and as directed. MAKE : CASTROL/GOLDEN CRUISER/SERVO
84Supply & Filling Distilled Water for Batteries, complete all as specified and as directed.
85Supply only Old Cotton Clothes width not less than 1.0 METRE without any Tearing suitable for cleaning of ALL TYPE VEHICLES, complete all as specified and as directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail