}

Tender For Under The Business Plan Year 2024-25 Scheme, Work Of Construction New 11/0.4 Kv Sub Stations In The Area Of Electricity Urban Distribution Division-Ii, Muzaffarnagar, muzaffarnagar-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Under The Business Plan Year 2024-25 Scheme, Work Of Construction New 11/0.4 Kv Sub Stations In The Area Of Electricity Urban Distribution Division-Ii, Muzaffarnagar. Submission Date for this Tender is 20-05-2024. Transmission Line Tenders in muzaffarnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43279107
Corrigendum : Tender For Under The Business Plan Year 2024-25 Scheme, Work Of Construction New 11/0.4 Kv Sub Stations In The Area Of Electricity Urban Distribution Division-Ii, Muzaffarnagar
Open Tender
Indian
Uttar Pradesh
muzaffarnagar
20-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Under The Business Plan Year 2024-25 Scheme, Work Of Construction New 11 / 0.4 Kv Sub Stations In The Area Of Electricity Urban Distribution Division-Ii, Muzaffarnagar

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-May-2024 Date extension Date 13-05-2024
2 13-May-2024 Date extension2 Date 20-05-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 22500.0 /-
Tender Value
INR 22.50 Lakhs /-

Attachment

FileName File Description File Size
68a03a87-ca52-42e2-9ab0-1e8f2d6dd5ea.html Tender Notice 0 KB
123to138DE..pdf Tender Document 0 KB
BOQ_1595626.xls Tender Document 0 KB
TenderDocument128202324.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
TermsConditions128202324.pdf Tender Document 0 KB

BOQ Items

Name of Work: fctusl Iyku o"kZ 2024&25 ;kstuk ds vUrxZr fo|qr uxjh; forj.k [k.M&f}rh;] eqt¶Qjuxj ds dk;Z{ks= esa u;s 11@0-4 midsUnzksa dk fuekZ.k dk;ZA
Sl. No. Item Description
1Carriage of Following line materials from ESC, Muzaffarnagar to work sites including safe loading and unloading at both ends as per site condition (0 to 15 Km.)
225 KVA T/F
363 KVA T/F
4100 KVA T/F
5250 KVA T/F
6ABC 3x50 sqmm.
7ABC 3x95 sqmm.
8ABC 3x120 sqmm.
9PCC 11 mtr. Long
10PCC 8.5 mtr. Long
1111 KV pin insulator
1211 KV disc insulator
13M/s Earthing complete
14ACSR weasel Conductor
15MS Channel
16MS Angle
1711 KV X-Arm V-Type
181x120 sqmm. LT XLPE cable
191x240 sqmm. LT XLPE cable
201x400 sqmm. LT XLPE cable
213.5x70 sqmm. LT XLPE cable
223.5x150 sqmm. LT XLPE cable
233ph Distribution Box
24Stay Set Complete
2511 KV fuse set
26Errection of PCC pole 11 mtr./8.5 mtr. as per norms and fixing all accessories (Nuts, Bolts, Washer and Clamps will be provided by contractor)
27Errection of double pole as per norms and fixing all accessories (Nuts, Bolts, Washer and Clamps will be provided by contractor)
28Febrication of MS channel/angle
29Errection of M.S. earthing complete
30Errection of fuse set on double pole
31Grouting of PCC pole with cement, sand, bricks CC ratio1:4:5 as per RESPO norms (all materila provided by contractor)
32Laying of 1x120 sqmm. LT XLPE cable
33Laying of 1x240 sqmm. LT XLPE cable
34Laying of 1x400 sqmm. LT XLPE cable
35Laying of 3.5x70 sqmm. LT XLPE cable
36Laying of 3.5x150 sqmm. LT XLPE cable
37Laying of ACSR weasel conductor.
38Laying of ABC 3x50 sqmm.
39Laying of ABC 3x95 sqmm.
40Laying of ABC 3x120 sqmm.
41Erection of 25 KVA T/F on D/P as per norms (Nuts, Bolts, Washer, Clamps and Lugs will be provided by contractor)
42Erection of 63 KVA T/F on D/P as per norms (Nuts, Bolts, Washer, Clamps and Lugs will be provided by contractor)
43Erection of 100 KVA T/F on D/P as per norms (Nuts, Bolts, Washer, Clamps and Lugs will be provided by contractor)
44Erection of 250 KVA T/F on D/P as per norms (Nuts, Bolts, Washer, Clamps and Lugs will be provided by contractor)
45Construction of plinth with cement, sand & bricks for 250 KVA T/F placing as per RESPO (all material provided by contractor)
46Providing of iron fencing for 250 KVA Transformer as per RESPO norms.
47Chemical earthing for T/F body as per RESPO norms. (All material provided by contractor)
48Chemical earthing for T/F Neutral as per RESPO norms. (All material provided by contractor)
49Fixing of distribution box and proper connection.
50Erection of stay set complete
51Grouting of stay set with cement, sand, bricks CC ratio1:4:5 as per RESPO norms (all materila provided by contractor)
52Dismentling of Following line materials and carriage from work site to ESC, Muzaffarnagar including safe loading and unloading at both ends as per site condition
5363 KV T/F old and used
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail