Madhyanchal Vidut Vitran Nigam Limited has published Tender For Work Related To Capacity Increase, Installation, Earthing, Protection And Power Lines Of Distribution Transformers Under The Regional Business Plan 2024-25.. Submission Date for this Tender is 13-05-2024. Electrification Work Tenders in gonda Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-May-2024 | date extension | Date | 13-05-2024 |
Sl. No. | Item Description |
1 | All these below items/materials from S.N. 1.01 to 1.40 will be given and errected by the contractor on his own cost as per estimate/Resspo Norms. |
2 | CLAMP FOR TOP, DROPPER AND T-OFF etc. |
3 | LT Clamp |
4 | LT SHACKLEINSULTER |
5 | M.S. NUT & BOLT |
6 | G.I. STRIP for Earthing |
7 | V TYPE X-ARM HOLDING CLAMP |
8 | Guarding Angle Holding Clamp |
9 | EYE HOOK |
10 | G.I. Pipe 6" Dia |
11 | 11 KV TPMO WITH COMPLETE FITTINGS |
12 | CLAMP FOR DROPPER ANGLE |
13 | DROPPER ANGLE (L/A) |
14 | D.O. FUSE SET (WITH CHANNEL AND CLAMP) |
15 | AL-LUG 95 SQMM |
16 | BRASS NUT 12 MM |
17 | BRASS NUT 20/30 MM |
18 | DISTRIBUTION BOX MASSIONARY TYPE (FUSE SET COMPLETE) |
19 | AL-LUG 400 SQMM |
20 | AL-LUG 250 SQMM |
21 | AL-LUG 630 SQMM |
22 | AL-LUG 240 SQMM |
23 | CONNECTOR FOR 630 KVA T/F |
24 | CONNECTOR FOR 100 KVA T/F |
25 | COPPER L - PIECE 62X250X12MM |
26 | FIRE BUCKET WITH SAND |
27 | FIRE BUCKET STAND |
28 | RUBBER EARTH MAT |
29 | Aluminium Paint |
30 | Sand Paper |
31 | Danger Board |
32 | Name Plate |
33 | Clamp for Danger Board & Name Plate |
34 | Dead - end Clamp |
35 | Pearsing Connector |
36 | I Hook Holding Clamp |
37 | Suspension Clamp |
38 | F- Bracket |
39 | Tyre for mobile trolly |
40 | EARTHING COMPLETE FOR STRUCTURE |
41 | Stone Pad |
42 | Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.60) from Electricity Store Centre, Gonda to the work site/dump site (Distance up to 40 km) |
43 | PCC Pole 8.5 METER |
44 | ST POLE11 METER |
45 | 25 KVA T/F |
46 | 63 KVA T/F |
47 | 100 KVA T/F |
48 | 250 KVA T/F |
49 | ABC CABLE 1×25sqmm |
50 | ABC CABLE 3×50 |
51 | ABC CABLE 3×95 |
52 | ABC CABLE 3×120 |
53 | ACSR Weasel Conductor |
54 | ACSR Dog Conductor |
55 | 11 KV XLPE CABLE 3 × 70 |
56 | 11 KV XLPE CABLE 3 × 120 |
57 | 11 KV XLPE CABLE 3 × 185 |
58 | 11 KV XLPE CABLE 3 × 300 |
59 | 11 KV XLPE CABLE AL. 1 × 400 |
60 | 33 KV XLPE CABLE 3 × 120 |
61 | Controll Cable 2x2.5sqmm |
62 | Controll Cable 4x2.5sqmm |
63 | 11 KV JOINTING KIT FOR 3 × 70 |
64 | 11 KV JOINTING KIT FOR O/D 3 × 120 |
65 | 11 KV JOINTING KIT FOR I/D 3 × 120 |
66 | 11 KV JOINTING KIT I/D FOR 3 × 185 |
67 | 11 KV JOINTING KIT O/D FOR 3 × 185 |
68 | 11 KV JOINTING KIT I/D FOR 3 × 300 |
69 | 11 KV JOINTING KIT O/D FOR 3 × 300 |
70 | 33KV JOINTING KIT O/D FOR 3 × 120 |
71 | 33KV3 × 120 Sqmm S/Th. Kit. |
72 | 11 KV V-Type X-Arm |
73 | 33 KV V-TYPE STEEL X-ARM |
74 | TOP CHANNEL |
75 | 11 KV DROPER CHANNEL |
76 | 33 KV DROPER CHANNEL |
77 | SUB STATION BASE |
78 | T-OFF CHANNEL |
79 | 11 KV PIN INSULATER WITH PIN |
80 | 33 KV POLYMERIC PIN INSULATOR WITH PIN |
81 | 11 KV DISC INSULATER WITH FITTING |
82 | 33 KV POLYMERIC DISC INSULATOR 70 KM (B & S TYPE) |
83 | EARTHING COMPLETE |
84 | STAY SET COMPLETE |
85 | 24 VOLT BATARY |
86 | BATARY CHARGER |
87 | G.I. Wire 8 SWG |
88 | Guarding Angle |
89 | Distribution Box 1 Phase |
90 | 11 KV PT COMPLETE SET (11000/110V) FOR TOSHIBA MAKE VCB |
91 | 11 KV CT (200/100/5A) FOR TOSHIBA MAKE VCB) |
92 | 11 KV FUSE SET |
93 | 33 KV CT 400/200/1-1-1A |
94 | 33 KV Transformer Control Pannel For Single Feeder |
95 | 33 KV Transformer Control Pannel For double Feeder |
96 | 33 KV LIGHTING ARRESTOR |
97 | 33 KV Vacume Circuit Brakar 1250 Amp. |
98 | LT PVC INSULATED CABLE 1X400 SQ.MM |
99 | LT PVC INSULATED CABLE 1X630 SQ.MM |
100 | LT PVC INSULATED CABLE 1X1000 SQ.MM |
101 | LT PVC INSULATED CABLE 1X240SQMM |
102 | Other material |
103 | Erection of single PCC/ST Poles (8.5/11 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site (All decentralize material shall be given by the contractor on his own cost.) |
104 | Erection of sectional double pole sectional PCC/STP pole (8.5/11 mtr long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. (All decentralize material shall be given by the contractor on his own cost.) |
105 | Earthing of pole. |
106 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
107 | Grouting of Poles with 1:4:8CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
108 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
109 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
110 | 25 KVA T/F |
111 | 63 KVA T/F |
112 | 100 KVA T/F |
113 | 250 KVA T/F |
114 | Laying, Stringing & Sagging of ABC Cable up to proper sag for the following size cable as per estimate/resspo norms |
115 | ABC CABLE 1×25sqmm |
116 | ABC CABLE 3×50 |
117 | ABC CABLE 3×95 |
118 | ABC CABLE 3×120 |
119 | Laying Stringing sagging & Binding of All size XLPE cable where is required as per estimate/Resspo norms. |
120 | 11 KV XLPE CABLE 3 × 70 |
121 | 11 KV XLPE CABLE 3 × 120 |
122 | 11 KV XLPE CABLE 3 × 185 |
123 | 11 KV XLPE CABLE 3 × 300 |
124 | 11 KV XLPE CABLE AL. 1 × 400 |
125 | 33 KV XLPE CABLE 3 × 120 |
126 | Installtion/Errection/Laying/stringing of the following items as per estimate/resspo norms. |
127 | Diffent size Controll Cable 2x2.5sqmm |
128 | 33/11 KV different size Jointing kit |
129 | 33KV3 × 120 Sqmm S/Th. Kit. |
130 | 33/11 KV PIN INSULATER WITH PIN |
131 | 33/11 KV DISC INSULATER WITH FITTING |
132 | 11 KV PT COMPLETE SET (11000/110V) FOR TOSHIBA MAKE VCB |
133 | 11 KV CT (200/100/5A) FOR TOSHIBA MAKE VCB) |
134 | 33 KV CT 400/200/1-1-1A |
135 | 33 KV Transformer Control Pannel For Single/double Feeder |
136 | 33 KV Vacume Circuit Brakar 1250 Amp. |
137 | Different size LT PVC INSULATED CABLE |
138 | G.I. Pipe 6" Dia |
139 | Installation of TPMO, D.O. fuse, Al-Lug, Brass Nut, DB box, L-Piece, Fire Bucket and stand, Rubber Mat, Danger Board, Name Place, type, Connector for T/F, Battry and charger, L.A. etc. and replacement of clamp /insulator/X-arm/CT/PT etc. |
140 | Gaurding of H.T./L.T. line with complete fittings as per estimate/resspo norms (All the decentralize material shall be given by the contractor) |
141 | Loading, Unloading and safe cartage of the following T/Fs from the work site/dump site to Electricity Store Centre, Gonda (Distance up to 40 km) |
142 | 10/16 KVA |
143 | 25 KVA |
144 | 63 KVA |
145 | 100 KVA |
146 | EARTHING OF CT WITH G.I. EARTHING STRIPUpto water lavel as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
147 | Chemical Earthing of t/f (with G.I. strip connection) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
148 | CHIMICAL EARTHING OF CT WITH G.I. EARTHING STRIP as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
149 | BORE TYPE DELTA EARTHING depth 40 feet for control room with GI strip as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
150 | BORE TYPE Pipe EARTHING depth 40 feet with GI strip as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
151 | Construction of Foundatin for VCB as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
152 | Construction of Foundatin for CT as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
153 | Construction of Foundatin forCONTROL PANNEL as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
154 | TRANSFORMER PLINTH REPAIRING as per Estimate/Resspo Norms.(All the required materialshall be given by contractor on his own cost.) |
155 | Wiremesh fencing with 1 door arrangement including grouting of footings and proper fxing as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
156 | CONSTRUCTION OF PLINTH WITH FENCING as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
157 | Construction of Plinth for DISTRIBUTION BOX MASSIONARY TYPE (WITHFUSE SET COMPLETE) as per Estimate/Resspo Norms. (All the required materialshall be given by contractor on his own cost.) |
158 | Interpolling in long span, resagging of loose conductor and replacement of damage X-Arm and F-Clamp and straightening of tilted pole providing stay set as required in HT line. |
159 | Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job) |
160 | Carrage of scrap/conductor from site to store |
161 | Dismentaling old material |
162 | Dismentaling old line |