Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Work Related To Installation Of New Distribution Transformers And Capacity Increase Etc. In The Area Of Electricity Distribution Division-Iii Moradabad Under Electricity Distribution Board-I Moradabad, Electricity Distribution Sub-Division-Pi. Submission Date for this Tender is 08-05-2024. Distribution Board Tenders in moradabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-May-2024 | DateExtend | Date | 08-05-2024 |
Sl. No. | Item Description |
1 | Safe carriage of the following material from store center PVVNL to site of workwith loading and unloading at both ends. |
2 | PCC pole 8.5 meter long. |
3 | 250 KVA transformer. |
4 | 11 KV pin insulator with pin |
5 | 11 KV disc insulator with fitting |
6 | Earthing set complete (MS earth rod 20x2500 mm and 06 SWG earthing wire etc.) |
7 | M.S angle for transformer base 75x75x6x2028 mm with clamp and bolts and nut. |
8 | M.S. Dropper channel 100x50x2028 mm. |
9 | Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.) |
10 | M.S. Top channel 125x65x2240 mm. |
11 | 25 KVA transformer |
12 | 100 KVA transformer |
13 | Erection/Fixing & laying/Installation of following materials as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Work includes the cost of labour,T&Pproviding nut, bolt and all other acessaries/material for proper completion of work. |
14 | Double pole structure with PCC Pole 8.5 mtr with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms. |
15 | Fixing of dropper channel on pole as per norms. |
16 | Filling stone pad in pits for errection of poleas per norms. |
17 | Fixing of MS angle on double pole on pole as per norms. |
18 | Earthing of pole by MS Earthing rod of 20x2500 mm and 6 swg earthing wire etc. |
19 | Construction of plinth of size 2x2x1.5 meter by providing sand, cement and bricks and all type of material and T&P complete work as per norms. |
20 | Safe installation of 250 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms by providing 20 meter L.T. XLPE of size 3.5x400 sq.mm. cable for connections.. |
21 | Safe installation of 25 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms by providing 20 meter L.T. XLPE of size 3.5x400 sq.mm. cable for connections.. |
22 | Fencing around 250 KVA transformer plinth by providing MS angle and mesh and and all type of material and T&P complete work as per norms. |
23 | Uninstalltion of 10 KVA transformer from double pole by opening H.T./L.T. connections and received back to store center majhola Moradabad with loading and unloading at both ends. |
24 | Uninstalltion of 100 KVA transformer from double pole by opening H.T./L.T. connections and received back to store center majhola Moradabad with loading and unloading at both ends. |
25 | Making jumper with ACSR weasel conductor on pole. |
26 | Installtion of 100 KVA transformer on double pole and making H.T./L.T. connections and all other work as per norms. |
27 | Inslation of Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.) |