Tender For Work Related To Installation Of New Distribution Transformers And Capacity Increase Etc. In The Area Of ​​Electricity Distribution Division-Iii Moradabad Under Electricity Distribution Board-I Moradabad, Electricity Distribution Sub-Division-Pi, moradabad-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Work Related To Installation Of New Distribution Transformers And Capacity Increase Etc. In The Area Of ​​Electricity Distribution Division-Iii Moradabad Under Electricity Distribution Board-I Moradabad, Electricity Distribution Sub-Division-Pi. Submission Date for this Tender is 08-05-2024. Distribution Board Tenders in moradabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43276978
Corrigendum : Tender For Work Related To Installation Of New Distribution Transformers And Capacity Increase Etc. In The Area Of ​​Electricity Distribution Division-Iii Moradabad Under Electricity Distribution Board-I Moradabad, Electricity Distribution Sub-Division-Pi
Open Tender
Indian
Uttar Pradesh
moradabad
08-05-2024

Tender Details

Tender For Work Related To Installation Of New Distribution Transformers And Capacity Increase Etc. In The Area Of ​​Electricity Distribution Division-Iii Moradabad Under Electricity Distribution Board-I Moradabad, Electricity Distribution Sub-Division-Pipalsana And Thakurdwara Area Under The Business Plan 2024-25.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-May-2024 DateExtend Date 08-05-2024

Key Value

Document Fees
INR 1180 /-
EMD
INR 5000.0 /-
Tender Value
INR 5 Lakhs /-

BOQ Items

Name of Work:fo|qr forj.k e.My&izFke] eqjknkckn ds v/khu fo|qr forj.k [k.M&r`rh;] eqjknkckn ds {ks=k/khu fo|qr forj.k mi[k.M&ihiylkuk ,oa Bkdqj}kjk ds {ks= esa fctusl IykWu 2024&25 ds vUrxZr uohu forj.k ifjorZdksa dh LFkkiuk] ,oa {kerko`f} lEcU/kh vkfn dk;ZaaaA
Sl. No. Item Description
1Safe carriage of the following material from store center PVVNL to site of workwith loading and unloading at both ends.
2PCC pole 8.5 meter long.
3250 KVA transformer.
411 KV pin insulator with pin
511 KV disc insulator with fitting
6Earthing set complete (MS earth rod 20x2500 mm and 06 SWG earthing wire etc.)
7M.S angle for transformer base 75x75x6x2028 mm with clamp and bolts and nut.
8M.S. Dropper channel 100x50x2028 mm.
9Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.)
10M.S. Top channel 125x65x2240 mm.
1125 KVA transformer
12100 KVA transformer
13Erection/Fixing & laying/Installation of following materials as per RESPO manual and as per direction to Supervising Engineer (complete in all respect). Work includes the cost of labour,T&Pproviding nut, bolt and all other acessaries/material for proper completion of work.
14Double pole structure with PCC Pole 8.5 mtr with grouting by providing sand, cement and bricks etc. complete work as per RESPO norms.
15Fixing of dropper channel on pole as per norms.
16Filling stone pad in pits for errection of poleas per norms.
17Fixing of MS angle on double pole on pole as per norms.
18Earthing of pole by MS Earthing rod of 20x2500 mm and 6 swg earthing wire etc.
19Construction of plinth of size 2x2x1.5 meter by providing sand, cement and bricks and all type of material and T&P complete work as per norms.
20Safe installation of 250 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms by providing 20 meter L.T. XLPE of size 3.5x400 sq.mm. cable for connections..
21Safe installation of 25 KVA transformer on plinth, making H.T./L.T. connections and all other work as per norms by providing 20 meter L.T. XLPE of size 3.5x400 sq.mm. cable for connections..
22Fencing around 250 KVA transformer plinth by providing MS angle and mesh and and all type of material and T&P complete work as per norms.
23Uninstalltion of 10 KVA transformer from double pole by opening H.T./L.T. connections and received back to store center majhola Moradabad with loading and unloading at both ends.
24Uninstalltion of 100 KVA transformer from double pole by opening H.T./L.T. connections and received back to store center majhola Moradabad with loading and unloading at both ends.
25Making jumper with ACSR weasel conductor on pole.
26Installtion of 100 KVA transformer on double pole and making H.T./L.T. connections and all other work as per norms.
27Inslation of Stay Rod set complete (Stay rod 16x1800 mm, stay wire 5 Kg 7/10 SWG, stay clamp, bolt and nut with grouting etc.)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail