}

Increasing Capacity Of Distribution Transformer (05 Nos. 16 Kva Single Phase To 25 Kva Three Phase, 05 Nos. 25 Kva Single Phase To 63 Kva Three Phase, 12 Nos. 100 Kva To 250 Kva & 2 Nos. 100 Kva Additional) The Head Of Business Plan Year 2024-25 (Summer P, sultanpur-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Increasing Capacity Of Distribution Transformer (05 Nos. 16 Kva Single Phase To 25 Kva Three Phase, 05 Nos. 25 Kva Single Phase To 63 Kva Three Phase, 12 Nos. 100 Kva To 250 Kva & 2 Nos. 100 Kva Additional) The Head Of Business Plan Year 2024-25 (Summer P. Submission Date for this Tender is 14-05-2024. Distribution Transformer Tenders in sultanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43269374
Corrigendum : Increasing Capacity Of Distribution Transformer (05 Nos. 16 Kva Single Phase To 25 Kva Three Phase, 05 Nos. 25 Kva Single Phase To 63 Kva Three Phase, 12 Nos. 100 Kva To 250 Kva & 2 Nos. 100 Kva Additional) The Head Of Business Plan Year 2024-25 (Summer P
Open Tender
Indian
Uttar Pradesh
sultanpur
14-05-2024

Tender Details

Increasing Capacity Of Distribution Transformer ( 05 Nos. 16 Kva Single Phase To 25 Kva Three Phase, 05 Nos. 25 Kva Single Phase To 63 Kva Three Phase, 12 Nos. 100 Kva To 250 Kva & 2 Nos. 100 Kva Additional ) The Head Of Business Plan Year 2024-25 ( Summer Plan ) Under Edd-Ist / Iind, Sultanpur ( Different Location ) Along With Safe Carriage And Installation For Different Material And Associated Work.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 30-Apr-2024 Corrigendum Date 07-05-2024
2 07-May-2024 Date Extension Date 14-05-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 14500.0 /-
Tender Value
INR 14.18 Lakhs /-

BOQ Items

Name of Work: Increasing capacity of distribution transformer (05 Nos. 16 KVA Single Phase To 25 KVA Three Phase, 05 Nos. 25 KVA Single Phase To 63 KVA Three Phase, 12 Nos. 100 KVA To 250 KVA & 2 Nos. 100 KVA Additional) the head of Business Plan Year 2024-25 (Summer Plan) under EDD-Ist/IInd, Sultanpur (different location) along with safe carriage and installation for different material and associated work.
Sl. No. Item Description
1PART-A (Material)
2Following materials supplied by the contractor :-
3Stone Pad
411 KV Pin insulator with Nut Bolts
511 KV Disc insulator with fitting
6Clamp for Top/Dropper/T-off
7Bolts & Nuts
8Safe carriage/cartage of following items from Store Centre, Sultanpur to work site including loading, unloading and proper stacking and return back of balance material from site to store at Sultanpur (distance within0-50 Km.)
9Safe carriage of PCC Pole 8.5 Mtr. Long
10Safe carriage of LT PVC Cable 1x400 sq.mm.
11Safe carriage of XLPE Cable 3.5x150 sq.mm.
12Safe carriage of LT AB Cable (3x95+1x70+1x16) sq.mm.
13Safe carriage of LT AB Cable (3x50+1x35+1x16) sq.mm.
14Safe carriage of AB Cable (3x120+1x95+1x16) sq.mm.
15Safe carriage of ACSR weasel conductor
16Safe carriage of Other Line Materials
17Safe carriage ofT/F 25 KVA
18Safe carriage ofT/F 63 KVA
19Safe carriage ofT/F 100 KVA
20Safe carriage ofT/F 250 KVA
21Dragging of PCC Pole from site to pit point
22Fabrication & erection of Single pole support on PCC Pole including digging of pit & fixing of all accessories and clampsincluding grouting & earthing of pole as per RESPO norms.
23Fabrication & erection of double pole support on PCC Pole including digging of pit & fixing of all accessories and clampsincluding grouting & earthing of pole as per RESPO norms.
24Mounting of 25 KVA T/F on double pole.
25Mounting of 63 KVA T/F on double pole.
26Mounting of additional 100 KVA T/F on double pole.
27Installation of 250 KVA T/F on plinth and associated works.
28Construction of new plinth as per approved drawing for 11/0.4 KV 250 KVA T/F including all requred man and material along with construction of fencing round the transformer plint including man and material and earthing of fencing.
29Stringing and sagging of LT PVC Cable 1x400 sq.mm. from DT to Double pole including all associated work,
30Stringing and sagging of XLPE Cable 3.5x150 sq.mm. from DT to Double pole including all associated work,
31Stringing and sagging of LT AB Cable (3x95+1x70+1x16) sq.mm. from DT to Double pole including all associated work,
32Stringing and sagging of LT AB Cable (3x50+1x35+1x16) sq.mm. from DT to Double pole including all associated work,
33Stringing and sagging of AB Cable (3x120+1x95+1x16) sq.mm. from DT to Double pole including all associated work,
34Laying Stringing & sagging of ACSR Weasel Conductor etc.
35Providing and installation of Pipe type earthing as per approved drawing including all requred man and material.
36Earthing of Transformer through earthing rod as per approved drawing including all requred manpower.
37Providing and fixing of Al. Lug required size
38Safe carrige of old and used 16 KVA DT from site (different location) to central store, Sultanpur.
39Safe carrige of old and used 25 KVA DT from site (different location) to central store, Sultanpur.
40Safe carrige of old and used 100 KVA DT from site (different location) to central store, Sultanpur.
41Stay Complete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail