}

Tender For Reverse Reduction Gear Box System For 14, mumbai-Maharashtra

Mazagon Dock Limited has published Tender For Reverse Reduction Gear Box System For 14. Submission Date for this Tender is 21-05-2024. Commercial Marine Vehicle Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

43268956
Tender For Reverse Reduction Gear Box System For 14
Limitted
Indian
Maharashtra
mumbai
21-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Reverse Reduction Gear Box System For 14 Design, Manufacture, Supply, Installation, Commissioning And Training Of Reverse Reduction Gear Box System For Yard-16501 To Yard-16514 (14 Fpv) As Per Following Sotr No.3003 Rev 00 Dtd.26.03.24. , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 28 Feb,2025 B) Stw - Delivery Date: 30Sept,2025 C) Hats - Delivery Date: 31Oct ,2025 D) Sats - Delivery Date: 30 Nov,2025 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30Th Apr,2025 B) Stw - Delivery Date: 30Thnov,2025 C) Hats - Delivery Date: 31Stdec ,2025 D) Sats - Delivery Date: 30Th Jan,2026 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30Th Jun,2025 B) Stw - Delivery Date: 30Thjan,2026 C) Hats - Delivery Date: 28Thfeb ,2026 D) Sats - Delivery Date: 31St Mar,2026 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers For Reverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30Th Aug,2025 B) Stw - Delivery Date: 31St Mar,2026 C) Hats - Delivery Date: 30Thapr ,2026 D) Sats - Delivery Date: 30Th May,2026 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30Th Nov,2025 B) Stw - Delivery Date: 30Thjun,2026 C) Hats - Delivery Date: 31Stjuly ,2026 D) Sats - Delivery Date: 31St Aug,2026 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 28Th Feb,2026 B) Stw - Delivery Date: 30Thsept,2026 C) Hats - Delivery Date: 31Thoct ,2026 D) Sats - Delivery Date: 30Th Nov,2026 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30Th May,2026 B) Stw - Delivery Date: 31Stdec,2026 C) Hats - Delivery Date: 30Thjan ,2027 D) Sats - Delivery Date: 28Th Feb,2027 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2027 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 31St Aug,2026 B) Stw - Delivery Date: 31Stmar,2027 C) Hats - Delivery Date: 30Thapr ,2027 D) Sats - Delivery Date: 30Th May,2027 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond December 2028 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30Th Nov,2026 B) Stw - Delivery Date: 30Thjun,2027 C) Hats - Delivery Date: 30Thjuly ,2027 D) Sats - Delivery Date: 31 Aug,2027 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2029 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 28 Feb,2027 B) Stw - Delivery Date: 30Sept,2027 C) Hats - Delivery Date: 30Oct ,2027 D) Sats - Delivery Date: 30 Nov,2027 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond June 2029 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 31 Mar,2027 B) Stw - Delivery Date: 31Dec,2027 C) Hats - Delivery Date: 31Jan ,2028 D) Sats - Delivery Date: 29 Feb,2028 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond September 2029To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 31 Aug,2027 B) Stw - Delivery Date: 31Mar,2028 C) Hats - Delivery Date: 30Apr ,2028 D) Sats - Delivery Date: 31 May,2028 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2029 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers Forreverse Reduction Gear Box A) Installation Supervision - Delivery Date: 30 Nov,2027 B) Stw - Delivery Date: 30Jun,2028 C) Hats - Delivery Date: 30July ,2028 D) Sats - Delivery Date: 31 Aug,2028 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond March 2030 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months , Design, Manufacture, Supply And Commissioning Of Reverse Reduction Gear Box System As Per Attached Sotr. , On Board Spares Of Reverse Reduction Gear Box For Two Year From The Date Of Completion Of Standard Warranty , Documentation Of Reverse Reduction Gear Box System As Per Attached Sotr , Control & Monitoring Including Starting Panel , Services Of Engineers For Reverse Reduction Gear Box A) Installation Supervision - Delivery Date: 29 Feb,2028 B) Stw - Delivery Date: 30 Sept,2028 C) Hats - Delivery Date: 31Oct ,2028 D) Sats - Delivery Date: 30Nov,2028 E) Commissioning , Operation And Maintenance Training As Per Attached Sotr , Monthly Warranty Extension Charges For 12 Months Beyond June 2030 To Be Obtained From The Vendor , Extra Man-Days - 1St Year , Extra Man-Days - 2Nd Year , Re-Preservation Charges - 0-6 Months , Re-Preservation Charges - 7-12 Months => Limited

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

Attachment

FileName File Description File Size
17aac6b3-b813-491e-813f-8b774548f029.html Tender Notice 0 KB
1600001945.rar Tender Document 0 KB
BOQ_104292.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work:Design, Manufacture, Supply, Installation, Commissioning & Training of Reverse Reduction Gear Box System for Yard-16501 to Yard-16514 (14 FPV) of CGP Ships.
Sl. No. Item Description
1DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
2ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
3DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
4CONTROL & MONITORING INCLUDING STARTING PANEL
5SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 28 FEB,2025 b) STW - DELIVERY DATE: 30SEPT,2025 c) HAT"s - DELIVERY DATE: 31OCT ,2025 d) SAT"s - DELIVERY DATE: 30 NOV,2025 e) COMMISSIONING
6OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
7MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
8Extra Man-Days - 1st Year
9Extra Man-Days - 2nd Year
10RE-Preservation Charges - 0-6 months
11RE-Preservation Charges - 7-12 months
12DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
13ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
14DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
15CONTROL & MONITORING INCLUDING STARTING PANEL
16SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30TH APR,2025 b) STW - DELIVERY DATE: 30THNOV,2025 c) HAT"s - DELIVERY DATE: 31STDEC ,2025 d) SAT"s - DELIVERY DATE: 30TH JAN,2026 e) COMMISSIONING
17OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
18MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
19Extra Man-Days - 1st Year
20Extra Man-Days - 2nd Year
21RE-Preservation Charges - 0-6 months
22RE-Preservation Charges - 7-12 months
23DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
24ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
25DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
26CONTROL & MONITORING INCLUDING STARTING PANEL
27SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30TH JUN,2025 b) STW - DELIVERY DATE: 30THJAN,2026 c) HAT"s - DELIVERY DATE: 28THFEB ,2026 d) SAT"s - DELIVERY DATE: 31ST MAR,2026 e) COMMISSIONING
28OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
29MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
30Extra Man-Days - 1st Year
31Extra Man-Days - 2nd Year
32RE-Preservation Charges - 0-6 months
33RE-Preservation Charges - 7-12 months
34DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
35ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
36DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
37CONTROL & MONITORING INCLUDING STARTING PANEL
38SERVICES OF ENGINEERS FOR REVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30TH AUG,2025 b) STW - DELIVERY DATE: 31ST MAR,2026 c) HAT"s - DELIVERY DATE: 30THAPR ,2026 d) SAT"s - DELIVERY DATE: 30TH MAY,2026 e) COMMISSIONING
39OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
40MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
41Extra Man-Days - 1st Year
42Extra Man-Days - 2nd Year
43RE-Preservation Charges - 0-6 months
44RE-Preservation Charges - 7-12 months
45DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
46ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
47DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
48CONTROL & MONITORING INCLUDING STARTING PANEL
49SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30TH NOV,2025 b) STW - DELIVERY DATE: 30THJUN,2026 c) HAT"s - DELIVERY DATE: 31STJULY ,2026 d) SAT"s - DELIVERY DATE: 31ST AUG,2026 e) COMMISSIONING
50OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
51MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
52Extra Man-Days - 1st Year
53Extra Man-Days - 2nd Year
54RE-Preservation Charges - 0-6 months
55RE-Preservation Charges - 7-12 months
56DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
57ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
58DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
59CONTROL & MONITORING INCLUDING STARTING PANEL
60SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 28TH FEB,2026 b) STW - DELIVERY DATE: 30THSEPT,2026 c) HAT"s - DELIVERY DATE: 31THOCT ,2026 d) SAT"s - DELIVERY DATE: 30TH NOV,2026 e) COMMISSIONING
61OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
62MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
63Extra Man-Days - 1st Year
64Extra Man-Days - 2nd Year
65RE-Preservation Charges - 0-6 months
66RE-Preservation Charges - 7-12 months
67DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
68ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
69DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
70CONTROL & MONITORING INCLUDING STARTING PANEL
71SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30TH MAY,2026 b) STW - DELIVERY DATE: 31STDEC,2026 c) HAT"s - DELIVERY DATE: 30THJAN ,2027 d) SAT"s - DELIVERY DATE: 28TH FEB,2027 e) COMMISSIONING
72OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
73MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2027 TO BE OBTAINED FROM THE VENDOR
74Extra Man-Days - 1st Year
75Extra Man-Days - 2nd Year
76RE-Preservation Charges - 0-6 months
77RE-Preservation Charges - 7-12 months
78DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
79ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
80DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
81CONTROL & MONITORING INCLUDING STARTING PANEL
82SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 31ST AUG,2026 b) STW - DELIVERY DATE: 31STMAR,2027 c) HAT"s - DELIVERY DATE: 30THAPR ,2027 d) SAT"s - DELIVERY DATE: 30TH MAY,2027 e) COMMISSIONING
83OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
84MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND DECEMBER 2028 TO BE OBTAINED FROM THE VENDOR
85Extra Man-Days - 1st Year
86Extra Man-Days - 2nd Year
87RE-Preservation Charges - 0-6 months
88RE-Preservation Charges - 7-12 months
89DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
90ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
91DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
92CONTROL & MONITORING INCLUDING STARTING PANEL
93SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30TH NOV,2026 b) STW - DELIVERY DATE: 30THJUN,2027 c) HAT"s - DELIVERY DATE: 30THJULY ,2027 d) SAT"s - DELIVERY DATE: 31 AUG,2027 e) COMMISSIONING
94OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
95MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2029 TO BE OBTAINED FROM THE VENDOR
96Extra Man-Days - 1st Year
97Extra Man-Days - 2nd Year
98RE-Preservation Charges - 0-6 months
99RE-Preservation Charges - 7-12 months
100DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
101ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
102DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
103CONTROL & MONITORING INCLUDING STARTING PANEL
104SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 28 FEB,2027 b) STW - DELIVERY DATE: 30SEPT,2027 c) HAT"s - DELIVERY DATE: 30OCT ,2027 d) SAT"s - DELIVERY DATE: 30 NOV,2027 e) COMMISSIONING
105OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
106MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND JUNE 2029 TO BE OBTAINED FROM THE VENDOR
107Extra Man-Days - 1st Year
108Extra Man-Days - 2nd Year
109RE-Preservation Charges - 0-6 months
110RE-Preservation Charges - 7-12 months
111DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
112ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
113DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
114CONTROL & MONITORING INCLUDING STARTING PANEL
115SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 31 MAR,2027 b) STW - DELIVERY DATE: 31DEC,2027 c) HAT"s - DELIVERY DATE: 31JAN ,2028 d) SAT"s - DELIVERY DATE: 29 FEB,2028 e) COMMISSIONING
116OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
117MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND SEPTEMBER 2029TO BE OBTAINED FROM THE VENDOR
118Extra Man-Days - 1st Year
119Extra Man-Days - 2nd Year
120RE-Preservation Charges - 0-6 months
121RE-Preservation Charges - 7-12 months
122DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
123ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
124DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
125CONTROL & MONITORING INCLUDING STARTING PANEL
126SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 31 AUG,2027 b) STW - DELIVERY DATE: 31MAR,2028 c) HAT"s - DELIVERY DATE: 30APR ,2028 d) SAT"s - DELIVERY DATE: 31 MAY,2028 e) COMMISSIONING
127OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
128MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2029 TO BE OBTAINED FROM THE VENDOR
129Extra Man-Days - 1st Year
130Extra Man-Days - 2nd Year
131RE-Preservation Charges - 0-6 months
132RE-Preservation Charges - 7-12 months
133DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
134ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
135DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
136CONTROL & MONITORING INCLUDING STARTING PANEL
137SERVICES OF ENGINEERS FORREVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 30 NOV,2027 b) STW - DELIVERY DATE: 30JUN,2028 c) HAT"s - DELIVERY DATE: 30JULY ,2028 d) SAT"s - DELIVERY DATE: 31 AUG,2028 e) COMMISSIONING
138OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
139MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND MARCH 2030 TO BE OBTAINED FROM THE VENDOR
140Extra Man-Days - 1st Year
141Extra Man-Days - 2nd Year
142RE-Preservation Charges - 0-6 months
143RE-Preservation Charges - 7-12 months
144DESIGN, MANUFACTURE, SUPPLY AND COMMISSIONING OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR.
145ON BOARD SPARES OF REVERSE REDUCTION GEAR BOX FOR TWO YEAR FROM THE DATE OF COMPLETION OF STANDARD WARRANTY
146DOCUMENTATION OF REVERSE REDUCTION GEAR BOX SYSTEM AS PER ATTACHED SOTR
147CONTROL & MONITORING INCLUDING STARTING PANEL
148SERVICES OF ENGINEERS FOR REVERSE REDUCTION GEAR BOX a) INSTALLATION SUPERVISION - DELIVERY DATE: 29 FEB,2028 b) STW - DELIVERY DATE: 30 SEPT,2028 c) HAT"s - DELIVERY DATE: 31OCT ,2028 d) SAT"s - DELIVERY DATE: 30NOV,2028 e) COMMISSIONING
149OPERATION AND MAINTENANCE TRAINING AS PER ATTACHED SOTR
150MONTHLY WARRANTY EXTENSION CHARGES FOR 12 MONTHS BEYOND JUNE 2030 TO BE OBTAINED FROM THE VENDOR
151Extra Man-Days - 1st Year
152Extra Man-Days - 2nd Year
153RE-Preservation Charges - 0-6 months
154RE-Preservation Charges - 7-12 months
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail