Madhyanchal Vidut Vitran Nigam Limited has published Tender For Quantum Of Works (Part A 30 Works) Involved In Increasing Capacity, Additional Distribution Transformer And Other Work At Diff. Sites Under The Business Plan Year 2024-25 (2.11 Cr) Under The Area Of Edsd-Iii Bangarmau Gramin Under The Edd-Iv Ba. Submission Date for this Tender is 24-05-2024. Distribution Transformer Tenders in unnao Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-May-2024 | Corrigendum18 | Date | 15-05-2024 |
2 | 16-May-2024 | Corrigendum19 | Date | 24-05-2024 |
FileName | File Description | File Size |
b1a8de4f-4cf5-4793-8e7a-f65d4cb3a9fd.html | Tender Notice | 0 KB |
BOQ_1595214.xls | Tender Document | 0 KB |
Dateextension.pdf | Tender Document | 0 KB |
DOC369.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Safe Carriage of following T/Ffrom Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. |
2 | T/F 250 KVA 11/0.4 KV |
3 | T/F 100 KVA 11/0.4 KV |
4 | T/F 63 KVA 11/0.4 KV |
5 | T/F 25 KVA 11/0.4 KV |
6 | Mobile Trolly For 250 KV T/F |
7 | Other loose line materials with including conductor, PVC Cable, Insulator, Single Pole accessories etc.from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. |
8 | Three Phase LT Line by ABC (3X50 sqmm) |
9 | Three Phase LT Line by ABC (3X95 sqmm) |
10 | Three Phase LT Line by ABC (3X120 sqmm) |
11 | LT PVC Cable size 1x240 sq mm |
12 | 11 KV XLPE Cable size 3x185 sq mm |
13 | PCC Pole 9 mtr long |
14 | PCC Pole 8.5 mtr long |
15 | ST Pole 11 mtr long |
16 | 11 KV O/H Line by ACSR Weasel Conductor |
17 | 33 KV Control Pannal (Line side Braker) |
18 | 11 KV VCB O/G CTR 200/100/5A |
19 | Safe Carriage of following Battery and Charger Set dump site along with loading unloading and propoer stocking. |
20 | BATTERY SET 24 VOLT |
21 | BATTERY CHARGER 24 VOLT |
22 | INVERTER WITH BATTARY (12 Volt) |
23 | ErectionofPCC/STPole(11KVLine)includingdiggingofpits,fittingofallaccessoriesalongwith cartage & dragging from dump site to pit site. |
24 | Erection of PCC/ST Pole (LT Line) including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
25 | Erection of PCC Pole (33 KV Line) between long span including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
26 | Making T-off and V Type Cross Arm arrangement including fabrication & fitting of accessories. |
27 | Grouting of PCC/ST Pole as per RESPO Norms with grouting materials. |
28 | Earthing of pole as per RESPO Norms. |
29 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
30 | Erection of PCC DoublePole following type HT Lines including all associated work with joint/jumpers and binding of insulator with complete all work as required.( One pole already install at the site) |
31 | Laying of 11 KV 3-phase line stringing and sagging of ACSR weasel conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required. |
32 | Laying stringing and sagging of LT Lines including all associated work with joint/jumpers and binding of insulator as required. |
33 | Proper Laying & Commissioning of(3x50/95/120+1x35/70/95+1x16) mm2 XLPE Aerial Bunched Conductor. Only ABC Provided by deptt. |
34 | Fixing of Single/Three Phase distribution boxes/Kiosk on the LT poles including all clamps and material required for mounting connections & sealing. Only distribution box Shall be supplied by deptt. |
35 | Layingof11KVXLPEcableByDrillmathodinHDPEPipe150mm forunderground(6inchdia) (HDPE pipe Proviede by the Contractor except cable ) |
36 | Laying of 11 KV XLPE cable By Sand and Brick in HDPE Pipe 150 mm for underground (6 inch dia) (HDPE pipe Proviede by the Contractor except cable ) |
37 | Cable Hosting in G.I. Pipe of 6" dia. (Two no. Job each D/Pole) |
38 | Fixing of 11 KV O/D Jointing Kit for XLPE Cable size 3x185 sq mm with complete all work as required. |
39 | High pressure testing of 11 KV 3x185 XLPE cable along with arrangement of High Pressure equipment. |
40 | Construction of T/F Plinth of size 2x2x1.5 m on a padding 0.25 M deeo in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed.Restwallshouldbe0.23mtrthick,brickworkinration1:4cement&coressandinthe hollow portion the sand should be filled from the ground level up to 15 centimeter below from the top of wall, cement, sand & brick ballasts should be filled up to 15 centimeter. Two nos. of channel 100x50 in length 1500 mm will be grouded, 0.35 CM. RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4. The T/Fs plinth should be plastered on all sides 12 mm thick in ratio 1:6 by cement and cores sand. (All the material will be arranged by the contractor) |
41 | Placementof11/0.4KVT/FfromdumpsitetonewlyconstructedT/FsPlinth&installationand commissioning of 250 KVA T/Fs of T/F Plinth and including jumpering with the system. (All the required materials as Al. Lugs Crimping Type for 250 KVA T/F, Copper L-piece 62x225x12 mm etc for above job shall be provided by contractor except T/Fs and LT PVC Cable) |
42 | Constructionofretainingwall,fabrication&erectionofWiremeshfencingaroundTransformerwith retainingwall&01nos.gatewithlockingarrangementmadeofMSAngleIronofsize50x50x6mm jointed with nuts and bolts. Wiremesh of size 10 swg rectangle type, its painting as per norms of RESPO. (All the materials will be arrangement by the contractor) |
43 | Earthing of Neutral of Transformer, Transformer body and double pole by way of boring and lowering of ‘B’ class G.I. Pipe 1.5” dia from ground up to the water level (Minimum 20 Mtr. Deep) with a solid cone at the lower end of G.I. pipe. Connecting and bringing out contineous G.I. Strip size 32X6 mm. from the conetothegroundsurfacewhereitwillbeconnectedwithG.I.pipeclampfromwhichTransformer neutral, Body & D.P. connection being done by G.I. Strip.(All the materials will be arrangement by the contractor) |
44 | Constuctionofmasonrymetalictypedistributionpillar ofsize 1x1.5x2.5Mtr.Withsupply&fixingof fabricated 4 Nos. doors (2ftx4ft) made of BP sheet of 18 SWG with locking arrangement, 2 Nos. straight MS angle 50x50x6 mm (1800 mm long) 2 Nos. 500 Amp. 300 Amp henely Type Tailess Fuse Unit, 3 Nos. coperbusbarofsize1000x50x6mmandoneNo.alumbusbar1000x50x6includingallcivilmaterial required for work. All material shall be supplied by contractor. |
45 | SupplyandfixingofCopperL-piece250/400sq.mm.4Nos.andAllu.Lugs400sq.mm12no.All Material provided by contractor. |
46 | Installation of 11 KV VCB O/G, CTR 200/100/5A, 350 MVA at 33/11 KV S/s F 84 I Takiya |
47 | Installationof33KVControlPannalinControlRoomandWorkofProperwirringwithLineside Bracker |
48 | Safe Carriage of following Mobile Trollyfrom Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. |
49 | T/F 250 KVA 11/0.4 KV WITH MOBILE TROLLY |
50 | Installation of Battery & Charger Set |
51 | Dismantling of old Battery Set |
52 | Dismantling of old Charger Set |
53 | Installation of new Battery Set with complete all work as required |
54 | Installation of new Charger Set with complete all work as required |
55 | Installation of new Inverter and Battery Set with complete all work as required |
56 | Safe Carriage of old and jarjar Battery & Charger Set from dump site to ESC Unnao with loading, unloading and proper stacking. |
57 | Fabrication, erection & commissioning of 25 KVA/63 KVA/100KVA T/F on double pole/single pole with all accessries. |
58 | Supply and fixing of Allu. Lugs 160 sq.mm. 4 No.All Material provided by contractor. |
59 | Safe Carriage of following T/F from work dump site to Electricity store center Unnao with loading, unloading and proper stocking. |
60 | T/F 10 KVA 11/0.4 KV |
61 | T/F 16 KVA 11/0.4 KV |
62 | T/F 25 KVA 11/0.4 KV |
63 | T/F 63 KVA 11/0.4 KV |
64 | T/F 100 KVA 11/0.4 KV |