Tender For The Electrification Work Of 11 No. Stw At Various Places/Villages Under Edd, Banda (Rural), 1 The Following Works Under Various Places/Sub-Stations Under Full Deposit Scheme 2023-24 Under Edd, Banda (Rural), Including Carriage Of All Required, banda-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For The Electrification Work Of 11 No. Stw At Various Places/Villages Under Edd, Banda (Rural), 1 The Following Works Under Various Places/Sub-Stations Under Full Deposit Scheme 2023-24 Under Edd, Banda (Rural), Including Carriage Of All Required. Submission Date for this Tender is 22-05-2024. Electrification Work Tenders in banda Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43263971
Corrigendum : Tender For The Electrification Work Of 11 No. Stw At Various Places/Villages Under Edd, Banda (Rural), 1 The Following Works Under Various Places/Sub-Stations Under Full Deposit Scheme 2023-24 Under Edd, Banda (Rural), Including Carriage Of All Required
Open Tender
Indian
Uttar Pradesh
banda
22-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For The Electrification Work Of 11 No. Stw At Various Places / Villages Under Edd, Banda ( Rural ) , 1 The Following Works Under Various Places / Sub-Stations Under Full Deposit Scheme 2023-24 Under Edd, Banda ( Rural ) , Including Carriage Of All Required Material From Esc Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Safe Carriage Of Old Line Material / Scraped From Site To Store Centre, If Any. The Bidder Shall Be Responsible For Complete Execution Of The Work Under The Scope Of Tender Specification. Any Work / Activity Not Specifically Indicated But Is Required For Systematic Execution Of Job Shall Be Carried Out By The Contractor Without Any Extra Payment. Details Of The Work As Given Below ;- 2 Erection Of 11 Kv Lines And 63 Kva Sub-Staions Work -For Electrification Of Stw At Various Places As 51-Naraini Vill. Ajitpura, 05-Jaspura Vill. Raipura ( Gadariya ) , 21-Jaspura Vill. Rampur, 27-Jaspura Vill. Sikahula ( Sikuwa ) , 28-Jaspura Vill. Gadariya, 29-Jaspura Vill. Raipura ( Gadariya ) , 41-Jaspura Vill. Rampur, 17-Jaspura Vill. Sonamau, 54-Jaspura Vill. Dandamau, 59-Jaspura Vill. Pachakauri, 29-Banda Vill. Gokharahi Etc. 3 Safely Cartage Of Following Poles From Esc To Site Of Work - 4 Pcc Poles 8.5 Mtr. Long 5 Safely Cartage Of Line Material Viz. Conductor, Cable, Wire, X-Arm, Clamps, Channels, Angles, Earthing Rod, Stay Etc. 6 Erection Of Pcc Poles 8.5 Mtr. Long As Sp With Complete Ht / Lt Fittings Of All Accessories As Per Direction Of Engineer Incharge / Resspo Norms. 7 Erection Of Pcc Poles 8.5 Mtr. Long As Dp / Sdp With Complete Ht / Lt Fittings Of All Accessories As Per Direction Of Engineer Incharge / Resspo Norms. 8 Concreting / Grouting Of Newly Erected Single / Double Pole Structure On 8.5 Mtr. Pcc Poles Asper Direction Of Supervising Engineer / Resspo Manual. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 ( 0.285 Cu. Mtr. Each ) , Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Sire Requirement, Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 9 Laying, Sagging, Stringing, Binding And Jumpering Ofacsr Weasel Conductor On The Newly Erected Poles With Fitting Of All Related Accessories As Per Direction Of Supervising Engineer / Resspo Manual. 10 Laying, Sagging, Stringing, Binding And Jumpering Ofabc Cable On The Newly Erected Poles With Fitting Of All Related Accessories As Per Direction Of Supervising Engineer / Resspo Manual. 11 Erection Of Stay Set Complete As Per Resspo Norms Alongwith Nozeling & Binding Of Stay Set, Stay. 12 Fabrication Of 11 Kv V-Type X-Arm ( 16 Mm Hole, 02 No. Each V-Type X-Arm ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 13 Fabrication Of 11 Kv Sub-Station Base Angle ( 16 Mm Hole, 04 No. Each S / S Base Angle ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 14 Fabrication Of 11 Kv Top Channel ( 16 Mm Hole, 10 No. Each Top Channel ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 15 Fabrication Of 11 Kv Dropper Channel ( 16 Mm Hole, 07 No. Each Dropper Channel ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 16 Fabrication Of 11 Kv T-Off Channel ( 16 Mm Hole, 08 No. Each T-Off Channel ) As Per Resspo Drawings With Loading, Unloading & Cartage All Complete Work. 17 Grouting Of Stay Set Complete At Digging Of Pit Including The Cost Of Grouting With Cement, Sand And Brick Ballast / Stone In Ratio 1:4:8 As Per Resspo Norms. 18 Fixing Of Earthing Rod As Per Direction Of Supervising Engineer / Resspo Manual, Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 19 Safely Cartage Of 63 Kva Capacity Transformers From Esc / Ask Store To Site Of Work With Loading And Unloading On Both Sites As Per Direction Of Engineer Incharge / Resspo Manual. 20 Safely Installation Of 63 Kva Capacity Transformers On Double Pole Structure In Proper Alignment As Per Direction Of Engineer Incharge / Resspo Manual. 21 Safely Cartage Of Old 63 Kva Capacity Transformers From Site Of Work To Esc / Ask Store, Banda Alongwith Loading And Unloading On Both Sites As Per Direction Of Engineer Incharge. 22 Chopping Of Tree Branches In Visinity Of 11 Kv / Lt Lines At Various Places.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-May-2024 Date Extension Corrg.1 Date 10-05-2024
2 09-May-2024 Date Extension Corrg.2 Date 15-05-2024
3 15-May-2024 Date Extension Corrg. Date 18-05-2024
4 18-May-2024 Date Extension Cor. Date 22-05-2024

Key Value

Document Fees
INR 1180 /-
EMD
INR 4500.0 /-
Tender Value
INR 4.22 Lakhs /-

Attachment

FileName File Description File Size
4fc94d8a-be80-439e-a260-b23b14078843.html Tender Notice 0 KB
BOQ_1595267.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Tender_Document_SED2324_0_1.rar Tender Document 0 KB

BOQ Items

Name of Work: fo|qr forj.k [k.M] ckank ¼xzkeh.k½ dh lhekUrxZr iw.kZ tek ;kstuk ls 11 ux jktdh; uydwiksa ds ÅthZdj.k dk dk;ZA
Sl. No. Item Description
1The following works under various places/Sub-Stations under FULL DEPOSIT SCHEME 2023-24 under EDD, BANDA (RURAL), including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. Details of the work as given below ;-
2Erection of 11 KV Lines and 63 KVA Sub-Staions work - For electrification of STW at various places as 51-Naraini Vill. Ajitpura, 05-Jaspura Vill. Raipura (Gadariya), 21-Jaspura Vill. Rampur, 27-Jaspura Vill. Sikahula (Sikuwa), 28-Jaspura Vill. Gadariya, 29-Jaspura Vill. Raipura (Gadariya), 41-Jaspura Vill. Rampur, 17-Jaspura Vill. Sonamau, 54-Jaspura Vill. Dandamau, 59-Jaspura Vill. Pachakauri, 29-Banda Vill. Gokharahi etc.
3Safely cartage of following poles from ESC to site of work -
4PCC Poles 8.5 Mtr. Long
5Safely cartage of line material viz. conductor, cable, wire, x-arm, clamps, channels, angles, earthing rod, stay etc.
6Erection of PCC Poles 8.5 Mtr. Long as SP with complete HT/LT fittings of all accessories as per direction of engineer incharge/RESSPO norms.
7Erection of PCC Poles 8.5 Mtr. Long as DP/SDP with complete HT/LT fittings of all accessories as per direction of engineer incharge/RESSPO norms.
8Concreting/grouting of newly erected single/double pole structure on 8.5 Mtr. PCC Poles asper direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual sire requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
9Laying, sagging, stringing, binding and jumpering ofACSR Weasel conductor on the newly erected poles with fitting of all related accessories as per direction of supervising engineer/RESSPO manual.
10Laying, sagging, stringing, binding and jumpering ofABC Cable on the newly erected poles with fitting of all related accessories as per direction of supervising engineer/RESSPO manual.
11Erection of stay set complete as per RESSPO norms alongwith nozeling & binding of stay set, stay.
12Fabrication of 11 KV V-Type X-arm (16 mm Hole, 02 No. each V-type X-arm) as per RESSPO Drawings with loading, unloading & cartage all complete work.
13Fabrication of 11 KV Sub-Station Base Angle (16 mm Hole, 04 No. each S/S Base Angle) as per RESSPO Drawings with loading, unloading & cartage all complete work.
14Fabrication of 11 KV Top Channel (16 mm Hole, 10 No. each Top Channel) as per RESSPO Drawings with loading, unloading & cartage all complete work.
15Fabrication of 11 KV Dropper Channel (16 mm Hole, 07 No. each Dropper Channel) as per RESSPO Drawings with loading, unloading & cartage all complete work.
16Fabrication of 11 KV T-Off Channel (16 mm Hole, 08 No. each T-Off Channel) as per RESSPO Drawings with loading, unloading & cartage all complete work.
17Grouting of stay set complete at digging of pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 as per RESSPO norms.
18Fixing of earthing rod as per direction of supervising engineer/RESSPO manual, including the cost of labour, T&P etc. required for proper completion of work.
19Safely cartage of 63 KVA capacity transformers from ESC/ASK Store to site of work with loading and unloading on both sites as per direction of engineer incharge/RESSPO manual.
20Safely Installation of 63 KVA capacity transformers on double pole structure in proper alignment as per direction of engineer incharge/RESSPO manual.
21Safely cartage of old 63 KVA capacity transformers from site of work to ESC/ASK Store, Banda alongwith loading and unloading on both sites as per direction of engineer incharge.
22Chopping of tree branches in visinity of 11 KV/LT Lines at various places.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail