Public Works Department-PWD has published Tender For Construction Of Link Road Rzingbo To Garpong And Imam Bada To Spangjuk Apatee. Submission Date for this Tender is 13-05-2024. Road Work Tenders in Kargil Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
2 | All kinds of soil |
3 | Ordinary rock |
4 | Hard Rock (RB) |
5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
6 | All kinds of soil |
7 | Soft Rock |
8 | Hard Rock (RB) |
9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Including all sort of carriage complete |
10 | Centering and shuttering including strutting, propping etc. and removal of form for: |
11 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
12 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) |
13 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. |
14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
15 | Dumping stone filling in horizontal on level incld. Cost of stone. |
16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
17 | Rzingboo to Gongma Garpong:-Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
18 | All kinds of soil |
19 | Ordinary rock |
20 | Hard Rock (RB) |
21 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
22 | All kinds of soil |
23 | Soft Rock |
24 | Hard Rock (RB) |
25 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Including all sort of carriage complete |
26 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and sturts, etc. upto floor five level including cost of centring, shuttering, finishing and reinforcement. 1:1 ½ :3 (1 cement: 1.5coarse sand: 3 graded crushed stone aggregate 20mm nominal size.Incld. Carriage complete. |
27 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (Thermo-Mechanically treated bars.) |
28 | Centering and shuttering including strutting, propping etc. and removal of form for: |
29 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
30 | Dumping stone filling in horizontal on level incld. Cost of stone. |
31 | Disposal of available excavated earth for an avg lead of 5Km by MT |