Tender For Construction Of Link Road Rzingbo To Garpong And Imam Bada To Spangjuk Apatee, Kargil-Jammu And Kashmir

Public Works Department-PWD has published Tender For Construction Of Link Road Rzingbo To Garpong And Imam Bada To Spangjuk Apatee. Submission Date for this Tender is 13-05-2024. Road Work Tenders in Kargil Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43263739
Tender For Construction Of Link Road Rzingbo To Garpong And Imam Bada To Spangjuk Apatee
Open Tender
Indian
Jammu And Kashmir
Kargil
13-05-2024

Tender Details

Construction Of Link Road Rzingbo To Garpong And Imam Bada To Spangjuk Apatee

Key Value

Document Fees
INR 3000 /-
EMD
INR 246000.0 /-
Tender Value
INR 1.23 Crore /-

BOQ Items

Name of Work:Construction of Link Road Rzingbo to Garpong and Imam Bada to Spangjuk Apatee
Sl. No. Item Description
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2All kinds of soil
3Ordinary rock
4Hard Rock (RB)
5Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
6All kinds of soil
7Soft Rock
8Hard Rock (RB)
9Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Including all sort of carriage complete
10Centering and shuttering including strutting, propping etc. and removal of form for:
11Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand)
13Dry random rubble masonry with hard stone in foundation and plinth: With bond stone.
14Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
15Dumping stone filling in horizontal on level incld. Cost of stone.
16Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
17Rzingboo to Gongma Garpong:-Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
18All kinds of soil
19Ordinary rock
20Hard Rock (RB)
21Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
22All kinds of soil
23Soft Rock
24Hard Rock (RB)
25Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Including all sort of carriage complete
26Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and sturts, etc. upto floor five level including cost of centring, shuttering, finishing and reinforcement. 1:1 ½ :3 (1 cement: 1.5coarse sand: 3 graded crushed stone aggregate 20mm nominal size.Incld. Carriage complete.
27Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (Thermo-Mechanically treated bars.)
28Centering and shuttering including strutting, propping etc. and removal of form for:
29Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
30Dumping stone filling in horizontal on level incld. Cost of stone.
31Disposal of available excavated earth for an avg lead of 5Km by MT
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail