Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Under Deposit Scheme, Executive Engineer, Power Distribution Division-Ii, Mirzapur Under Deposit Scheme, Municipal Council, Mirzapur Mrf Center, Kushwaha Nagar Mahuvaria Government Tube Well 242 Mg Village Gaura Iii, Central School Complex, Vil. Submission Date for this Tender is 13-05-2024. Electrification Work Tenders in mirzapur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply of following Decentralized materials at the works site as per RESSPO norms. |
2 | Stone Pad, 300x300x75 mm (Material Providing by Contractor) |
3 | Danger Board & clamps with nuts & bolts (Material Providing by Contractor) |
4 | All Lugs(Material Providing by Contractor) |
5 | Cable Jointer (Material Providing by Contractor) |
6 | Z-Clamp (Material Providing by Contractor) |
7 | Extension Bracket (Material Providing by Contractor) |
8 | Clamp for Top/Droper/T-off Channel (Material Providing by Contractor) |
9 | PG clamps (Material Providing by Contractor) |
10 | Clamps with nuts & bolts for Top /Dropper(Material Providing by Contractor) |
11 | Barbed wire GI (Material Providing by Contractor) |
12 | E-bracket with bolts & nuts (Material Providing by Contractor) |
13 | Cartage of following materials from Electricity Store Center, Mirzapur to dump site near work site including loading/ unloading and proper stocking. |
14 | STP Poles,11 meter long (Material Providing by Department) |
15 | PCC Poles, 8.5 meter long(Material Providing by Department) |
16 | M.S channel, 100x50x3200mm (Top-channel)(Material Providing by Department) |
17 | M.S channel, 100x50x2028 mm(Material Providing by Department) |
18 | 11 KV TPMO Set(Material Providing by Department) |
19 | 11 KV Fuse Set(Material Providing by Department) |
20 | 3Ph-3W Static TVM 11 KV(Material Providing by Department) |
21 | 11 Pilfer proof metering cubicle 20/5 A(Material Providing by Department) |
22 | ACSR Weasel Conductor(Material Providing by Department) |
23 | T/F 63 KVA 11/0.4 KVA (Material Providing by Department) |
24 | T/F 100 KVA 11/0.4 KVA (Material Providing by Department) |
25 | T/F 250 KVA 11/0.4 KVA (Material Providing by Department) |
26 | 11 KV Disc Insulators with fitting & clamps (Material Providing by Department) |
27 | 11 KV Pin Insulator with pins (Material Providing by Department) |
28 | 3x120 mm2 11KV XLPE Cable (Material Providing by Department) |
29 | Cable Jointing kit (Material Providing by Department) |
30 | Base Angle (Material Providing by Department) |
31 | T-off Channel(Material Providing by Department) |
32 | LT Cable(Material Providing by Department) |
33 | Stay Complete(Material Providing by Department) |
34 | Earthing Complete(Material Providing by Department) |
35 | MS 65x65x6mm Cross bracing Angle (Material Providing by Department) |
36 | Erection |
37 | Erection of Sectional Double Pole Structure of ST 11 mtr/PCC 8.5 mtrpole including fitting of accessories, |
38 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
39 | Earthing of Poles |
40 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. |
41 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying with 3x120XLPE cable Ovehead Double CKT |
42 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying with 3x120XLPE cable Ovehead Double CKT |
43 | sagging of LT Cable |
44 | Cable Joint For Cable Jointing kit |
45 | Mounting of 25 KVA T/F |
46 | Mounting of 100 KVA T/F |
47 | Construction of Transformer plinth for 250 KVA Transformer of2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials. |
48 | Fencing of 250 KVA T/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing |
49 | Well type earthing of 250 KVA Transformer by using B class G.I. pipe of 1.5 " dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor. |
50 | Recived Back 63 KVA t/F For Store |
51 | Shiffting Of 25 KVA T/F |
52 | Installation of 11 KV TPMO & fuse set complete work |
53 | Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber |
54 | Installation of 3 ph - 4 Wstatic TVM 11 KV |