Madhyanchal Vidut Vitran Nigam Limited has published Maintenance And Repairing Of 33 Kv Line Ashrafpur Barwan In Distt Ambedkarnagar. Submission Date for this Tender is 10-05-2024. Transmission Line Tenders in Ambedkar Nagar Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 04-May-2024 | Date E | Date | 06-05-2024 |
2 | 06-May-2024 | Date Ex | Date | 08-05-2024 |
3 | 08-May-2024 | 508Dateex | Date | 10-05-2024 |
Sl. No. | Item Description |
1 | SafeLoading, Carriage and then safeunloading of the following material from Store Centres Under the jurisdiction of EE ESD Ayodhaya to dump site proper stacking. |
2 | STP 11 Mtr. |
3 | M.S. Top Channel 125x65mm 3200 mm |
4 | M.S. Angle 65x65x6 mm Bracing, 4300 mm |
5 | GI Wire 6 SWG |
6 | 33 KV Pin Insulator polymer type |
7 | ACSR Dog Conductor |
8 | 33 KV Cable 3x300 mm XLPE |
9 | 33 KV Straight through jointing kit indoor 3x300 sq.mm. XLPE |
10 | 33 KV cable jointing kit outdoor 3x300 sq.mm. XLPE |
11 | M.S. Channel 125x65 (for Structures) |
12 | M.S. Angle 75x75x6 (for Structures) |
13 | Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection forExpoure Double pole for 33 KV Line on 11.0 Mtr STP Pole with fitting of necessary clamp & other acessories like 3 No Top channel of 125x65x6 mm size 3200 mm . , Bracing angle 1 set.,and 9 No. Pin insulator as per norms. (Contractor shall provide all necessary clamps,Nut - Bolts&washer and e-bracket if required etc) |
14 | Stringing, sagging, binding and Jumpering of ACSR Dog conductor. 3 Phase of 33 KV Line including fixing, mounting of P.G.clamp suitable for Dog Conductor at sectional point. (Contractor shall provide necessary PG clamps etc) |
15 | Earthing by way of boring and lowering the "B" class GI pipe of 55 mm dia from ground upto water level not less than 20 mtr. As per standard practice . The G.I pipe which laid down below the railway crossing will be connected with G.I strip 50x6. (All material will be supplied by the contractor) |
16 | Laying & Dressing of 3x300 sq. mm XLPE Cable underground single Circuit. Laying of single circuit 3x300 sq .mm XLPE Cable in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required materials, as 1st class Bricks, Stone slabs and fine sand. Providing 150 mm fine sand cusion beneath, and 150 mm sand cusion above the cable. The cable shall be duly protected by Bricks, sand and stone slab. The inter axial spacing between two cables should be in between 0.25 to 0.04 M. After laying the cable refilling and ramming of the left out soil,closing the trench and leveling. |
17 | Installation of Heat Shrinkable Type cable jointing kits of following types/sizes for 33 XLPE Cable. |
18 | (a) Fixing of 33 KV 3x300 sq. mm Straight Throughjoints. (jointing kit supplied by dept.) |
19 | (b) Fixing of 33 KV 3x300 sq. mm Outdoor End Terminations(jointing kit supplied by dept.) |
20 | High Pressure testing to which 33 KV Line & cable to be stand for duration of 5 minutes after completion of Laying, Stringing, sagging, binding and Jumpering of ACSR Dog conductor. ( Testing equipment will be arranged by the contractor) |
21 | Hoisting of 33 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x300 sq mm cable fixing of proper support and its clamping, providing long barral lugs 6 nos and P.G. Clamps & "Y" shapejumpering properly and 02 nos. supporting angle 65X65X6, 2240 mm long and making connection including supply of jumpering cable ,mounting clamps as per RESSPO Norms. (All material will be supplied by the contractor like M.S Pipe , P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2240 mm and jumpering cable suitable for 33KV jumper). |
22 | Fabrication, Erection and grouting of route marker and marking 33 KV line by painting after grooving on the stone. (Contractor shall provide allmaterials) |
23 | Grouting of following structure by digging of pit 1.5 Mtr/1.83 Mtr deep for 9.0 Mtr PCC / 11 Mtr STP respectively, placing stone pad at bottom 450x450 size foundation is provided with help of steel or wooden formers, groutung with 1:4:8 Ratio cement, sand & first class brick ballast 0.268/0.285 cu mtr for 9.0 mtr PCC Pole & 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering. |
24 | 11 Mtr ST Poles |
25 | Supply and fixing of a stone pad of size 300x300x75 mm at PCC/STP Bottom of the pit ( Contractor shall provide all materials) |
26 | Fixing of barbed wire on pole Supply and fixing of barbed wire on the pole above 2750 mm ground level. Barbed wirewrapped for a distance of 0.9 mtr. with apitch of 13.mm at a height. (All materials supplied by the contractor) |
27 | Fixing of Danger board . Supply and fitting of Danger board of size 250x200x2 mm 3650 mm above ground level with the help of proper size of nuts, Bolts , washers and clamps as per Respo norms. RESPO Drawing No-55 (All materials supplied by the contractor) |
28 | Fixing of Number plate . Supply and fitting of Number plate of size 250x200x2 mm 3650 mm above ground level with the help of proper size of nuts, Bolts , washers and clamps as per Respo norms. RESPO Drawing No-55 (All materials supplied by the contractor) |
29 | Earthing ofPole Earthing of Pole STP/PCC by 6 SWG Wire by providing and fixing of 20 mm dia" earthing rod 2.550 Mtr. long as per norms complete in all respect. (Contractor shall provide all the material Like Earthing rod, 6 swg wire, Earthing clamps and nut & bolt etc.) |
30 | Providing of HDPE 6"Dia Pipe PN-6 Specification |
31 | Laying of cable & HDPE Pipe(double circuit) Laying of double circuit 33 KV 3x300 Sq mm XLPE cable and HDPE Pipe by drilling method below NHAI road crossing. The cable be laid at the depth of 3 mtr from the under surface in HDPE pipe (200 mm. dia.) |
32 | Laying of cable Through HDD method (double circuit) Laying of double circuit 33 KV 3x300 Sq mm XLPE cable HDD method below NHAI road crossing. The cable be laid at the depth of 3 mtr from the under surface in HDPE pipe. |
33 | Permission of NHAI/PWD etc. for road crossing..( Final settlement of the payment will be done after providing receipt, agreement and permission paper) |
34 | restoring the road as it is before after completion of work |
35 | Inspection Pit will be digged as per the direction and supervision of JE/AE/EE. |
36 | Painting of poles Painting of poles with one coat of red oxide, two coats of enamel paint ISI mark. (All required material will be supplied by the contractor) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy