Tender For Work Of Replacement Of Jarjar Conductor, Poles And Associated Work On 33/11Kv/Lt Lines Required Due To Strom/Devi Aapda Under Edc, Etah., etah-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Work Of Replacement Of Jarjar Conductor, Poles And Associated Work On 33/11Kv/Lt Lines Required Due To Strom/Devi Aapda Under Edc, Etah.. Submission Date for this Tender is 04-05-2024. Electrification Work Tenders in etah Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43257894
Tender For Work Of Replacement Of Jarjar Conductor, Poles And Associated Work On 33/11Kv/Lt Lines Required Due To Strom/Devi Aapda Under Edc, Etah.
Open Tender
Indian
Uttar Pradesh
etah
04-05-2024

Tender Details

Tender For Work Of Replacement Of Jarjar Conductor, Poles And Associated Work On 33 / 11Kv / Lt Lines Required Due To Strom / Devi Aapda Under Edc, Etah.

Key Value

Document Fees
INR 3540 /-
EMD
INR 15000.0 /-
Tender Value
INR 15 Lakhs /-

BOQ Items

Name of Work:Work of Replacement of Jarjar conductor, poles and associated work on 33 kv/11 KV/ LT Lines required due to Storm/Devi Aapda under EDC-Etah.
Sl. No. Item Description
1Safe carriage of 8.5 mtr. Long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. Including loading & unloading at both ends.
2Safe carriage of 9/11 mtr. Long STP pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends.
3Safe carriage of line material from store center Etah to pit site in distance range 0 to 60 km. Including loading & unloading at both ends.
4Errection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
5Errection of 9/11 mtr. Long ST poles as single support including fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
6Errection of 8.5 mtr. long PCC poles as D.Pole/section poleincluding fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
7Errection of 9/11 mtr. long PCC poles as D.Pole/section poleincluding fixing of all HT/LT accessories etc and other work complete as per RESPO norms.
8Dismantling and removal of following conductor from the various area, stacking and placement their coils and their in the safer place including cost of lobour T&P etc. required for proper completion of work.(i)ACSR weasel conductor
9(ii) Raccoon / Dog conductor
10(iii) ABC Cable 3x120+1x70+1x16
11(IV) ABC Cable 3x95+1x35+1x16
12(V) ABC Cable 3x50+1x35+1x16
13Opening of the accessories from damaged/brocken Double pole including all cost of labour and T&P etc.
14Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. (i)ACSR weasel conductor
15(ii) Raccoon / Dog conductor
16(iii) ABC Cable 3x120+1x70+1x16
17(IV) ABC Cable 3x95+1x35+1x16
18(V) ABC Cable 3x50+1x35+1x16
19Straighting of tilted PCC/R.S.Joist poles/Round Pole of HT/LT line after opening of nozzling, digging of pit applying anti direction force for making of proper alignment of line.
20Strainthing of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line.
21Opening of HT/LT connections & lowering of 25/63 KVA T/F from D/P and shifting up to in safer place.
22Re-sagging of following loose conductor as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work. (a) ACSR Weasel cunductor
23( b ) Raccoon / Dog conductor
24(c) ABC Cable 3x120+1x70+1x16
25(d) ABC Cable 3x95+1x35+1x16
26(e) ABC Cable 3x50+1x35+1x16
27Earthling of PCC Pole with MS Earth Rod as per RESPO Specification.
28Retightening of Stay rod. Etc. complete.
29Providingfixing of stay rod with nuzzling etc. complete.
30Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing. (i)11 KV cross arms ‘V’ type
31(ii) 11 KV pin insulator
32(iii)11 KV pin with nut
33(iv)11 KV disc insulator
34(v) Cross arms holding clamps
35(vi) F clamps
36(vii)Stays Clamp
37(viii) LT pin clamp
38(ix)Shackle insulator
39Carriage of old material from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.
40Mounting of 25/63 KV Transformers on double pole including making of the connection etc complete.
41Repairing/ resagging/ new guardingof HT Line with GI wire as per RESPO Norms.
42Chopping of tree branches
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail