| 1 | Erection and Dismantling of HT and LT overhead lines at Amlai OCM, Sohagpur Area |
| 2 | HT Line Erection - Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc.as required. Above 08.00 metre and upto 11.00 metre |
| 3 | Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc.as required. Above 11.00 metre and upto 13.00 metre |
| 4 | Supplying and erection of stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 mm X 60 cm ), 7/ 4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required. |
| 5 | Supplying and erection of a set of cross bracing frame work for 11 KV over head line double pole structure having four members fabricated out of 50 mm X 50 mm X 6 mm angle iron to form a rectangle of minimum size 1400 mm width X 2500 mm height, complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts and nuts etc (as per drawing) and painting with primer and finish paint as required (Required steel materials shall be supplied by the contractor) |
| 6 | Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole for 11/22/33 KV as required. |
| 7 | Erection of double pole 3 wire cross arm for 11KV/ 22KV/ 33 KV over head lines as required. |
| 8 | Erection of disc/ pin insulator for 11 KV over head lines as required. |
| 9 | Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. (All required materials shall be supplied by the contractor) |
| 10 | Fixing of 11 KVAB Switch |
| 11 | StringingofLine (ACSR DOG conductor) ALL 03 Condtr |
| 12 | StringingofLine (ACSR Rabbit conductor) single condtr |
| 13 | Carpet Guarding(Material will be supplied by the company) |
| 14 | Supply of flat ironClamp ( 50mm x 6mm) for pipe/pole |
| 15 | HT Danger Notice plate250mmx200mm |
| 16 | Painting of poles ( AL Paint) (All materials shall be supplied by the contractor) |
| 17 | HT Line Dismantling - Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required. |
| 18 | Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required. |
| 19 | LT Line Erection - Erection of metallic pole of 8.0 meter and upto 11.0 meter following length in cement concrete 1 :3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. |
| 20 | Supplying and erection ofstay set complete (galvanised)with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, bow tightener, 7/ 3.15 mm dia G.I. stay wire andstrain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required |
| 21 | Providing of Shackle insulator ( 100mm x110mm) WITH GI Bolts and nuts |
| 22 | Providing of Pin insulator (100mm x80mm) WITH GI Spindle and nut |
| 23 | Erection of angle iron/ channel iron cross arm onRCC/ PCC pole |
| 24 | Erection of LV/MV shackle/pin insulator Complete |
| 25 | Stringing of Line (acsr rabbit condtr) 03 wire |
| 26 | Erection of Cradle Guard (Material will be supplied by the company) |
| 27 | LT Line Dismantling- Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required. |
| 28 | Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required. |
| 29 | Total impact of GST for the purpose of CTC |