Paschimanchal Vidyut Vitran Nigam Limited has published Tender For 1 Work In Head Construction Or Replacement Of Damaged 33 Kv Line At Dpr Sn 9 Under Eudd 5 Noida, Details Of Work And Quantity Against E-Tender No. 128/Eudc-I/2023-24/Noida (Works) For Carrying Out The 01 No. Work In Head Construction / Replacem. Submission Date for this Tender is 04-05-2024. Transmission Line Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - |
2 | 33 KV XLPE Cable of size 3x300 Sq.mm. |
3 | ST Pole 11 Mtr. long SP-55. |
4 | 33 KV Pin Insulator. |
5 | 33 KV Pin with nut. |
6 | Earthing Complete. |
7 | Top Channel 125x65x2240mm. |
8 | Dropper Channel 100x50x2000mm. |
9 | 33 KV Outdoor jointing kit suitable for 33 KV 3x300 sq.mm. XLPE cable. |
10 | 33 KV straight through suitable for 33 KV 3x300 sq.mm. XLPE cable. |
11 | Providing & fixing of following material of standard make / best quality for complete the work of double pole structure at 33 KV line as per RESPO norms by the contractor at his own cost : - |
12 | Stone pad 300x300x75mm. |
13 | MS Clamp with nuts & bolts. |
14 | G.I. Pipe 6" Dia. |
15 | Painting number mark with paint. |
16 | Danger board with clamp. |
17 | Barbed wire. |
18 | RCC / Stone Route Marker yellow colour with proper marking. |
19 | HDPE Socket suitable for HDPE pipe 160 mm dia. |
20 | The Excavation of foundation pit in CC road/ mix soil/ normal soil/ soft & hard rack by using heavy duty compressor and its back filling and leveling etc. The size of the pit will be 600x600x1800 mm for each pole and having a depth of 1/6 of the full length of the support. |
21 | Fabrication of MS channel / Angle as per site requirement complete in all respects. |
22 | Erection of Double pole structure on 11 Mtr. long ST Pole for 33 KV line including fixing of all accessories of 33KV line as per RESPO schedule Complete in all respects. |
23 | Grouting & concreting of each pole (In ratio of 1:4:8 in Cement, sand and Brick Ballast) in size 450mmx450mmx1800 mm as per RESPO schedule Complete in all respects. |
24 | Construction of Plinth in size 450x450x300 mm of each (0.880 Cu.m) pole above the ground level(In ratio of 1:3:6 in Cement, sand and Brick Ballast) as per RESPO schedule Complete in all respects. |
25 | Excavation of earth and driving of M.S. earthing rod of size 20x2500 mm in earth and jointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts etc. |
26 | Drilling of dia suitable for 160 mm dia by trench less method by horizontal boring machine at a depth of 1.5 mtrs below the ground level for laying of cable complete in all respects. |
27 | Digging of trench suitable for 160 mm dia by open cut method at a depth of 1.5 mtrs below the ground level for laying of cable complete in all respects. |
28 | Providing of 06 Mtr long pieces of HDPE pipe (4 Kg / m2) 160 mm Dia PN 4 PE 63 (PVVNL approved) after inspection of competent committee at manufacturing site of the items with actual guarantee period. |
29 | Laying and interconnecting of above 06 Mtr long pieces of HDPE pipe 160mm Dia PN 4 PE 63 (PVVNL approved) in above trench and open trench in switchyard sector-129 for laying of cable complete in all respects.. |
30 | Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop. |
31 | Road Restoration charges for hot mixed pakka road / CC road / kaccha road / mix soil/ normal soil/ soft & hard rack as it is when start of work as per authority norms. |
32 | Laying and pulling of 33 KV XLPE Cable 3x300 Sq.mm. through HDPE pipe, loop & riser complete in all respects. |
33 | Hi port test for 33 KV 3x300 sq.mm XLPE cable. |
34 | Fixing of 33 KV Outdoor jointing kit suitable for 33 KV 3x300 sq.mm. XLPE cable complete in all respect. |
35 | Fixing of straight through suitable for 33 KV 3x300 sq.mm. XLPE cable complete in all respect. |
36 | Hoisting of 33 KV 3x300 sq mmXLPE cable on section double / four pole structure through GI pipe 6 inch dia 3 mtr long fixed on pole structure including its jumpering complete with clamps, bolts and nuts. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy