}

Tender For Stage Contract For Annual Maintenance/Repairs Restortoration Of Damages Of Embankments, Plugging Of Breaches And Raising Of Bunds, Laying Of Ec Bags On Bank Tops, Cutting Of Trees Etc.On Encroached Land/Embankments For Various Nallahs For The Y, handwara-Jammu And Kashmir

Irrigation And Flood Control Department-IFCD has published Tender For Stage Contract For Annual Maintenance/Repairs Restortoration Of Damages Of Embankments, Plugging Of Breaches And Raising Of Bunds, Laying Of Ec Bags On Bank Tops, Cutting Of Trees Etc.On Encroached Land/Embankments For Various Nallahs For The Y. Submission Date for this Tender is 03-05-2024. Embankment Tenders in handwara Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43253145
Tender For Stage Contract For Annual Maintenance/Repairs Restortoration Of Damages Of Embankments, Plugging Of Breaches And Raising Of Bunds, Laying Of Ec Bags On Bank Tops, Cutting Of Trees Etc.On Encroached Land/Embankments For Various Nallahs For The Y
Open Tender
Indian
Jammu And Kashmir
handwara
03-05-2024

Tender Details

Stage Contract For Annual Maintenance / Repairs Restortoration Of Damages Of Embankments, Plugging Of Breaches And Raising Of Bunds, Laying Of Ec Bags On Bank Tops, Cutting Of Trees Etc.On Encroached Land / Embankments For Various Nallahs For The Year 2024-25. Litter Nallah- Talri Nallah, Baderkali Nallah And Their Tributries.

Key Value

Document Fees
INR 700 /-
EMD
INR 14000.0 /-
Tender Value
INR 7 Lakhs /-

BOQ Items

Name of Work: stage contract for annual maintenance/repairs restortoration of damages of embankments, plugging of breaches and raising of bunds, laying of EC bags on bank tops, cutting of trees etc.on encroached land/embankments for various nallahs for the year 2024-25. Litter Nallah- Talri Nallah, Baderkali Nallah and their tributries.
Sl. No. Item Description
1Hire and runnng charges of Tipper (min 8 hours)
2Engagement of cutting saw machine (min 8 hours)
3Engagement of Tractor with trolley (min 8 hours)
4Engagement of Blacksmith 1st class
5Engagement of carpenter 1st class
6Engagement of Beldar
7Engagement of Mason (average)
8Supply of stoneboulder (quarry) nominal size 225 mm (stack measurements reduced by 15%
9Supply of stone boulder (nallah) nominal size 225 mm (stack measurements reduced by 15%)
10Supply of stone for masonry work (Quarry)
11supply of stone for masonry work (nallah split) i
12supply of Soling stone
13Supply of Diesel
14supply of Petrol
15Supply of wire crate meshof size 100x100 with 4mm dia wire incld carriage, mechanical transport head load, etc complete
16Supply of Zinc Coated Gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120 mm & having mesh wire dia. 2.7 mm, Selvedge Wire dia: 3.4 mm & lacing wire dia. 2.2 mm & PVC coating thickness
17Hire charges of Generator 100 KVA/125 KVA
18Hire charges of pumpset of capacity 4000 litres/hour
19Engagement of hydraulic excavatr (Tyre mounted) incld cost of fuel and hire charges of operatormin08hours
20Engagement of hydraulic excavatr (chain mounted) incld cost of fuel and hire charges of operatormin08hours
21providing of polythene sheet for lining for water proofing
22Providing of plywood
234mm
246mm
259mm
2612mm
27construction muthu bunds, comprising boulders and wood bushes in alternate layers: incld working in water situation
28Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds Of soils.
29Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soils.
30Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge
31Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- Charge
32Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m..
33Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material
34Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
35Centering and shuttering including strutting, propping etc. and removal of form for
36Foundations, footings, bases of columns etc. for mass concrete
37Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
38Suspended floors, roofs, landings, balconies and access platforms.
39Columns, pillars, piers, abutments, posts and struts
40Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level withcomplete job
411:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
421:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
431:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
44Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. Complete Job
451:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
461:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
47Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level Complete Job
481:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)
491:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) Complete job
51Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement :1½ coarse sand: 3 graded Complete Job
52Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Thermo-Mechanically Treated bars of grade Fe-500D or more) Complete job
53Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Welded) Complete job
54Structural steel work in single section, fixedwith or without connecting plate, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer all complete. Complete Job
55Slip clearance
56In ordinary soils disposal lead upto 50 m and lift upto 1.5 m
57In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
58Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )
59Dry
60Wet
61Providing and laying S&S Centrifugally Ductile Iron Pipes conforming to IS : 8329 Complete job
62100 mm dia Ductile Iron Class K - 9 Pipes
63150mm dia Ductile Iron Class K - 9 Pipes
64200 mm dia Ductile Iron Class K - 9 Pipes
65providing flanged joints to double flanged C.I/D.I pipes to joints providing and laying S&S centrifuglly cost (Spun) iron pipes (Class L.A) confrimg to IS 1536 incl. all carriages (complete Job)
66100 mm dia. Pipe
67125 mm dia. Pipe
68150 mm dia. Pipe
69200 mm dia. Pipe
70Providing flanged joints to double flanged C.I. / D.I pipes and specials including testing to joints incld all carriages (complete job)
71100 mm dia. pipe
72125 mm dia. pipe
73150 mm dia. pipe
74200 mm dia. pipe
75Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete
76100 mm dia. R.C.C. pipe
77150 mm dia. R.C.C. pipe
78250 mm dia. R.C.C. pipe
79Providing of Chain link fabric fencing mesh of size 50x50 mm made of G.I. wire of dia 4 mm
80Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)
81Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
82Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
83Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: incld. all carriages (complete job)
84Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry
85Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
8612mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand)
87Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge:
881:3:6 or richer mix (i/c equivalent design mix)
891:4:8 or leaner mix (i/c equivalent design mix)
90Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge
91Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: (In cement mortar)
92Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix)
93Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:4:8 or leaner mix (i/c equivalent design mix)
94Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
95Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured) : (In cement mortar)
96Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: (In cement mortar)
97Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) :
98Dismantling old protection work including cutting of crates and stacking of stones
99Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
100Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
101Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m
102Loading sand / earth filled bags in boats; lead upto 50m.
103Unloading sand/earth filled bags from boats
104Placing in dry
105Placing in Water
106Hand-packing stones in wire-crates; excluding cost of crates and stones
107Tipping stone-filled wire crates in position; including equipment charges.
108Dumping stone excluding cost of stones in Horizontal on level
109Providing of uPVC pipes of required dia incld. All carriages (complete job)
11075 mm
111110 mm
112150 mm
113200 mm
114providng, laying and placing in postion of poplar piles haivng girth not less 1500 mm wit stiffness and fasteners incld. Loading/unloading and stacking at site complete job.
115P/Fitting of plain GI sheets 0.35 mm thick incld all carriages(complete job)
116Welding, including transportation of plant at site etc.complete
117By gas plant
118By electric plant
119Providing and laying of sand/earth filled geo bags with filled capacity 0.075 cum/no., including of cost of bag, filling of bags, sewing and strings and filling material placing in position dry/wet, all sorts of carriages, manual/mechanical, loading, unloading and stacking etc. but excluding cost of filling material complete job as per directions/satisfaction of Engineer in Charge.
120Providing and laying of sand/earth filled geo bags with filled capacity 0.075 cum/no., with 70% earth and 30% sand including of cost of bag, filling of bags, sewing and strings and filling material placing in position dry/wet, all sorts of carriages, manual/mechanical, loading, unloading and stacking etc. includingcost of filling material complete job as per directions/satisfaction of Engineer in Charge.
121Providing and laying of sand/earth filled mega bags with filled capacity 0.95 cum/no., with 70% earth and 30% sand including of cost of bag, filling of bags, sewing and strings and filling material placing in position dry/wet, all sorts of carriages, manual/mechanical, loading, unloading and stacking etc. including cost of filling material complete job as per directions/satisfaction of Engineer in Charge.
122Providing and laying of sand/earth filled mega bags with filled capacity 0.95 cum/no., including of cost of bag, filling of bags, sewing and strings and filling material placing in position dry/wet, all sorts of carriages, manual/mechanical, loading, unloading and stacking etc. excluding cost of filling material complete job as per directions/satisfaction of Engineer in Charge.
123Supply of following items (complete job)
124Coarse sand zone III
125Fine sand zoneIV
126Stone dust
127Earth
128Refreshments for special occasions of District Administration
129Tea/Cofee
130Tea with egg and samosa
131water
132veg Resfreshment pack
133No-Veg Reshment pack
134Mix Dry fruit per serving
135Interior finishing White washing with lime to give an even shade on New Work (three or more coats)
136FiExterior Finishing Finishing walls with water proofing cement paint of required shade on New Work (two or more coats applied @ 3.84 kg/10 sqm)
137Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws.Second class Kail wood
138Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):
139Providing and fixing of sign board.
140Tin sign board
141Electronic sign boards
142Flex sign board
143Flex Glow sign board
144Carriage as per SOR-2022 and to be paid as per actual.
145Hire charges of passenger vehicle (Sumo/tevera/scorpio/xylo) incld. POL and Driver complete for full day (8hours) to be paid as per actual mileage.
146close timbering in case of shafts, wells, cesspits, manholes and the like incld. Strutting, shoring and packing cavities (whereever required) etc. complete. (Measuremenets to be taken of the face area timbered)
147Depth not exceeding 1.5m
148Depth exceeding 1.5m but not exceeding 3m
149Depth exceeding 3m but not exceeding 4.50m
150Open timbering in trenches incld. Strutting and shoring complete (measurements to be taken of the face area timbered)
151Depth not exceeding 1.5m
152Depth exceeding 1.5m but not exceeding 3m
153Depth exceeding 3m but not exceeding 4.50m
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail