Public Works Department-PWD has published Tender For Temporary Electrification Work And Other Utlity Related To Infrastructural Arrangement At Counting For General Election To The House Of The People, 2024 At Jis Medical College, Howrah.. Submission Date for this Tender is 10-05-2024. Electrification Work Tenders in howrah West Bengal. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
73d1d22d-49ec-4d33-9580-30596058ba6a.html | Tender Notice | 0 KB |
2911.pdf | Tender Document | 0 KB |
BOQ_1500646.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | TEMPORARY ELECTRICAL INSTALLATIONS: (with effect from 20th May"2024 to 4th June "2024. / may be changed as per actual demand) Storing of EVMs after election. 16 Days |
2 | SWITCHES |
3 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing interconnection wiring with socketing, earthing attachment etc. and dismentling at the of end function (with PWD / E.I.C. approved materials) |
4 | 240V, 16 amp DP switch with rewirable fuse(for upto3days). |
5 | 240V, 32 amp DP switch with rewirable fuse(for upto3days). |
6 | 415V, 32 amp TPN switch with rewirable fuse (for upto3days). |
7 | 415V, 63 amp TPN switch with rewirable fuse (for upto3days). |
8 | 415V, 100 amp TPN switch with rewirable fuse (for upto3days). |
9 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter- connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) |
10 | 415V, 100 amp, Offload Change Over Switch (for upto3days). |
11 | Providing on hire basis following bus bar on wooden plank board or suitable angle iron frame incl. provoding interconnection wiring with socketing earthing attachment etc & dismantling at the function (with PWD approved materials). |
12 | 415V, 150 - 400 amp TPN Bus bar Chamber with 4 (four) bars (Upto 3 Days) |
13 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter- connection wiring with socketing, earthing attachment etc. and dismantaling at the of end function (with PWD / E.I.C. approved materials) |
14 | 240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming. (for upto3days). |
15 | 415V, Upto 6 Way TPNBDB With 1 No. - 63 amp FP MCB as Incoming & 18 No. 6-32 amp SPMCB as Outgoing (for upto3days). |
16 | 415V, Upto 8 Way 160 amp,VTPNDB With 100/160 amp MCCB As Incoming 8 No. - 63 amp TPMCB as Outgoing (for upto3days). |
17 | Supplying & Providing And dismantling on hire basis the Voltmeter(0-600v) with selector switch. (for upto3days) |
18 | Supplying & Providing And dismantling on hire basis theIndicating lamp. (for upto3days) |
19 | WIRING |
20 | Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 2.5/ 4/6 Sqmm with Earth Wire (1x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter(for upto3days) |
21 | Supplying & Drawing on Hire Basis Three Phase Dist Wiring With 4 x 2.5/ 4/6 Sqmm with Earth Wire (1x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring insuitable alkhathene pipe on the hire basis incl. dismantling the same per meter(for upto3days) |
22 | Supplying & Drawing on Hire Basis Three Phase Dist Wiring With 4 x 10 Sqmm with Earth Wire (2x 6 ) Sqmm Or its equivalent PVC copper wiring or its amp equivalent on the hire basis incl. dismantling the same per meter(for upto3days) |
23 | ALKHATHENE PIPE |
24 | Supplying & Laying/fixing 25mm alkathene pipe on hire basis and dismantling.(for upto3days) |
25 | DISTRIBUTION WIRING WITH GROUP CONTROL |
26 | Distribution wiring in 2 or 3 x 1.5 Sqmm single core PVC copper wire to light/fan points incl. fixing holder, switch and double board etc. complete on hire basis and dismantling the same (Av. Run 6 mtr.)(for upto3days) |
27 | Providing on hire basis 15A 230VAC control switch / starter normally on switch complete with all arrangements & install at the door of strong room which control the same room"s lights. (Lights will be on when door is open).(for upto3days) |
28 | CABLE LAYING |
29 | Providing on hire main wiring with 1.1 KV grade Aluminium Conductor PVC / XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same and mending good the damages. (for upto3days) |
30 | 4 Core 185 Sq. mm PVC / XLPE armorured cable per meter |
31 | 4 Core 50 Sq. mm PVC / XLPE armorured cable per meter |
32 | 4 Core 25 Sq. mm PVC / XLPE armorured cable per meter |
33 | 4 Core 16 Sq. mm PVC / XLPE armorured cable per meter |
34 | 2 Core 16 Sq. mm PVC / XLPE armorured cable per meter |
35 | SWITCH BOARDS |
36 | Supplying & providing 1 no Seperate 6 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same.(for upto3days) |
37 | Supplying & providing 1 no Seperate 20 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same.(for upto3days) |
38 | Supplying & providing on Hire Basis 2nos. 6A Switch and 2nos. 6A 3pin socket and 2 nos. 20A Switch and 2 nos. 20A 3pin socket on suitable size MS/TW Board and dismantling the same.(for upto3days) |
39 | FITTING & FIXTURE |
40 | Supplying & providing single LED fitting complete with tube, commercial type (4 ft) fitting on hire basis and dismantling the same (As per approved by E.I.C.)(for upto3days) |
41 | Supplying & providing on hire basis pendent light fittings with 18 watt LED lamp holder shade etc. complete including dismantling the same.(Upto 3 Days) |
42 | Supplying & providing on hire basis 100 watt LED Flood light complete with bracket and clamps on the pole including dismantling incl. replacement of fused lamp (As per approved by E.I.C.)(for upto3days) |
43 | Supplying & providing on hire basis 150 watt LED Flood light complete with bracket and clamps on the pole including dismantling incl. replacement of fused lamp (As per approved by E.I.C.)(for upto3days) |
44 | Supplying & providing on hire basis 250 watt LED Flood light complete with bracket and clamps on the pole including dismantling incl. replacement of fused lamp (As per approved by E.I.C.)(for upto3days) |
45 | FAN |
46 | Supplying & providing on hire basis 240V A. C. 1200 mm / 48" sweep ceiling fan with down rod as required & dismantling the same.(Upto 3 Days) |
47 | Supplying & providing on hire basis 240V A. C. 600 mm / 24" sweep Air Circulater (Pedestal/Bracket) and dismantling the same.(Upto 3 Days) |
48 | EARTHING |
49 | Providing & Earthing on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs. Long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same(for upto3days) |
50 | Add: 2% Extra amount after three days from the date of commissioning on item no. 2 to 15.02 |
51 | DG SET |
52 | Supplying & providing & connecting with Existing electrical panel ( With appropriate cable supplied by Contractor )on hire basis different KVA Three phase DG set of Follwing Ratings and dismantling the same, excluding fuel charges. |
53 | 62.5 KVA Three phase for Each day(2 set/day x 3 days) |
54 | 62.5 KVA Three phase for each single day more than 3 days(2 set/day x 13 days) |
55 | DEPLOYMENT OF MAN POWER |
56 | Deployment of One no. Electrician & One no. Helper per shift per day (i.e. Total 3 nos Electrician & 3 nos Helper per day for 24 Hrs) for carring out all kind of EI maintenance & DG operations etc |
57 | TEMPORARY ELECTRICAL INSTALLATIONS: (with effect from 02nd June"2024 to 04th June"2024. / may be changed as per actual demand) Counting.3 Days |
58 | SWITCHES |
59 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing interconnection wiring with socketing, earthing attachment etc. and dismentling at the of end function (with PWD / E.I.C. approved materials) |
60 | 240V, 16 amp DP switch with rewirable fuse(for upto3days). |
61 | 240V, 32 amp DP switch with rewirable fuse(for upto3days). |
62 | 415V, 32 amp TPN switch with rewirable fuse (for upto3days) |
63 | 415V, 63 amp TPN switch with rewirable fuse (for upto3days). |
64 | 415V, 100 amp TPN switch with rewirable fuse (for upto3days) |
65 | 415V, 200 amp TPN switch HRC fuse type (for upto3days) |
66 | 415V, 300 amp TPN switch HRC fuse type (for upto3days) |
67 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter- connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) |
68 | 415V, 100 amp, Offload Change Over Switch(Upto 3 Days) |
69 | 415V, 200 amp, Offload Change Over Switch(Upto 3 Days) |
70 | Providing on hire basis following bus bar on wooden plank board or suitable angle iron frame incl. provoding interconnection wiring with socketing earthing attachment etc & dismantling at the function (with PWD approved materials). |
71 | 415V, 150 - 400 amp TPN Bus bar Chamber with 4 (four) bars (Upto 3 Days) |
72 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter- connection wiring with socketing, earthing attachment etc. and dismantaling at the of end function (with PWD / E.I.C. approved materials) |
73 | 240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing & 40/63 amp DPMCB as Incoming. (for upto3days). |
74 | 415V, Upto 6 Way TPNBDB With 1 No. - 63 amp FP MCB as Incoming & 18 No. 6-32 amp SPMCB as Outgoing (for upto3days). |
75 | 415V, Upto 8 Way 160 amp,VTPNDB With 100/160 amp MCCB As Incoming 8 No. - 63 amp TPMCB as Outgoing (for upto3days). |
76 | Supplying & Providing And dismantling on hire basis the Voltmeter(0-600v) with selector switch. (for upto3days) |
77 | Supplying & Providing And dismantling on hire basis theIndicating lamp. (for upto3days) |
78 | WIRING |
79 | Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 2.5/ 4/6 Sqmm with Earth Wire (1x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter(for upto3days) |
80 | Supplying & Drawing on Hire Basis Three Phase Dist Wiring With 4 x 2.5/ 4/6 Sqmm with Earth Wire (1x 2.5 / 1x4) Sqmm Or its equivalent PVC copper wiring insuitable alkhathene pipe on the hire basis incl. dismantling the same per meter(for upto3days) |
81 | Supplying & Drawing on Hire Basis Three Phase Dist Wiring With 4 x 10 Sqmm with Earth Wire (2x 6 ) Sqmm Or its equivalent PVC copper wiring or its amp equivalent on the hire basis incl. dismantling the same per meter(for upto3days) |
82 | ALKHATHENE PIPE |
83 | Supplying & Laying 25mm alkathene pipe on hire basis and dismantling.(for upto3days) |
84 | DISTRIBUTION WIRING WITH GROUP CONTROL |
85 | Distribution wiring in 2 or 3 x 1.5 Sqmm single core PVC copper wire to light/fan points incl. fixing holder, switch and double board etc. complete on hire basis and dismantling the same (Av. Run 6 mtr.)(for upto3days) |
86 | CABLE LAYING |
87 | Providing on hire main wiring with 1.1 KV grade Aluminium Conductor PVC / XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same and mending good the damages. (for upto3days) |
88 | 4 Core 120 Sq. mm PVC / XLPE armorured cable per meter |
89 | 4 Core 50 Sq. mm PVC / XLPE armorured cable per meter |
90 | 4 Core 25 Sq. mm PVC / XLPE armorured cable per meter |
91 | 4 Core 16 Sq. mm PVC / XLPE armorured cable per meter |
92 | 2 Core 16 Sq. mm PVC / XLPE armorured cable per meter |
93 | SWITCH BOARDS |
94 | Supplying & providing 1 no Seperate 6 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same.(for upto3days) |
95 | Supplying & providing 1 no Seperate 20 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same.(for upto3days) |
96 | Supplying & providing on Hire Basis 2nos. 6A Switch and 2nos. 6A 3pin socket and 2 nos. 20A Switch and 2 nos. 20A 3pin socket on suitable size MS/TW Board and dismantling the same.(for upto3days) |
97 | FITTING & FIXTURE |
98 | Supplying & providing single LED fitting complete with tube, commercial type (4 ft) fitting on hire basis and dismantling the same (As per approved by E.I.C.)(for upto3days) |
99 | Supplying & providing on hire basis pendent light fittings with 18 watt LED lamp holder shade etc. complete including dismantling the same.(Upto 3 Days) |
100 | Supplying & providing on hire basis 100 watt LED Flood light complete with bracket and clamps on the pole including dismantling incl. replacement of fused lamp (As per approved by E.I.C.)(for upto3days) |
101 | Supplying & providing on hire basis 150 watt LED Flood light complete with bracket and clamps on the pole including dismantling incl. replacement of fused lamp (As per approved by E.I.C.)(for upto3days) |
102 | FAN |
103 | Supplying & providing on hire basis 240V A. C. 1200 mm / 48" sweep ceiling fan with down rod as required & dismantling the same.(Upto 3 Days) |
104 | Supplying & providing on hire basis 240V A. C. 600 mm / 24" sweep Air Circulater (Pedestal/Bracket) and dismantling the same.(Upto 3 Days) |
105 | Supplying & providing on hire basis 240V A. C. 450 mm / 18" sweep Pedestal fan and dismantling the same.for existing plug point (Upto 3 Days) |
106 | EARTHING |
107 | Providing & Earthing on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs. Long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same(for upto3days) |
108 | DG SET |
109 | Supplying & providing & connecting with Existing electrical panel ( With appropriate cable supplied by Contractor )on hire basis different KVA Three phase DG set of Follwing Ratings and dismantling the same, excluding fuel charges. |
110 | 125 KVA Three phase for Each day(2 set/day x 3 days) |
111 | DEPLOYMENT OF MAN POWER |
112 | Deployment of One no. Electrician & One no. Helper per shift per day (i.e. Total 3 nos Electrician & 3 nos Helper per day for 24 Hrs) for carring out all kind of EI maintenance & DG operations etc |
113 | IT INFRASTRUCTURAL ITEMS |
114 | S & I on hire basis AC machine complete with indoor, outdoor units, refrigerant pipe lines,gas, electrical connections, loading unloading, lifting & transportation charges.(inst.as per direction by EIC) |
115 | Add GST @ 18 % |
116 | Add LWC @ 1% |
117 | Supply & pouring of HSD for the above hired DG Set incl. Handling cost as per log book & T.D. Sheet. Diesel (GST is not applicable on this item) |
118 | Diesel (GST is not applicable on this item) |
119 | No compensation will be allowed to the agency in case of any loss/damage of the temporary electrical installation incl DG sets. |