Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Work Of Replacement Of Dilapidated Material Of Electric Line In The Jurisdiction Of Electricity Urban Distribution Division-I, Muzaffarnagar. Submission Date for this Tender is 14-05-2024. Electrification Work Tenders in muzaffarnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-May-2024 | Date extension | Date | 08-05-2024 |
2 | 08-May-2024 | Date extension 2 | Date | 14-05-2024 |
FileName | File Description | File Size |
9f3d5931-492d-4ca3-8985-88d52033b889.html | Tender Notice | 0 KB |
118to138DE..pdf | Tender Document | 0 KB |
BOQ_1594959.xls | Tender Document | 0 KB |
TenderDocument121202324.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
TermsConditions121202324.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Carriage of Following line materials from ESC, Muzaffarnagar to work sites including safe loading and unloading at both ends as per site condition |
2 | ACSR Dog Conductor |
3 | 33 KV Poly. Disc insulater |
4 | 33 KV Poly. Pin insulater |
5 | STP 13 Mtr. Long |
6 | 33 KV X-arm V-Type |
7 | 33 KV Disc Fitting |
8 | PCC Pole 11 Mtr. Long |
9 | Earthing Complete |
10 | 11 KV Polly Pin Insulater |
11 | 11 KV X-arm V-Type |
12 | ABC 3x120 mmsq. |
13 | LT XLPE Al. 3.5x150 mmsq. |
14 | LT XLPE Al. 1x240 mmsq. |
15 | LT XLPE Al. 1x400 mmsq. |
16 | Errection of PCC 11 mtr. with all Accessories as per norms (Nuts, Bolts, Washer and Clamps will be provided by contractor) |
17 | Errection of STP 13 mtr. with all Accessories as per norms (Nuts, Bolts, Washer and Clamps will be provided by contractor) |
18 | Grouting of PCC pole/STP with cement, sand, bricks CC ratio1:4:5 as per RESPO norms (all materila provided by contractor) |
19 | Laying of ACSR Dog Conductor |
20 | Laying of ABC 3x120 sqmm |
21 | Laying of LT XLPE Al. 3.5x150 mmsq. |
22 | Laying of LT XLPE Al. 1x240 mmsq. |
23 | Laying of LT XLPE Al. 1x400 mmsq. |
24 | Eraction of earthimg complete |
25 | Chemical earthing for Transformer body as per RESPO norms. (All material provided by contractor) |
26 | Chemical earthing for Transformer Neutral as per RESPO norms. (All material provided by contractor) |
27 | Dismantling of HT/LT connection and removal of LT distribution transformer form damaged plinth and repairing the plinth with cement, sand & bricks. After repairing the plinth, placing the concerned transformer on the plinth and making connections to start the power supply (all material will be provided by contractor). |
28 | The work of repairing the damaged facing of distribution transformer by providing new material.r as per RESPO norms. (all material provided by contractor) |
29 | Dismentling of Following line materials and carriage from work site to ESC, Muzaffarnagar including safe loading and unloading at both ends :- |
30 | LT XLPE |
31 | LT ABC |
32 | ACSR Dog Conductor |
33 | ST Pole 13 Mtr. |
34 | 33 KV X-arm V-Tpye |
35 | ST Pole Scrap |
36 | ACSR weasel scrap |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail