Archaeological Survey Of India-ASI has published Tender For Execution Of Work Namely Removal Of Vegetation And Minor Repairs To Adjoining Fortification Wall From Asad Burj Towards City Wall Portion Back Side Of T-5 Parking At Red Fort Delhi. Submission Date for this Tender is 02-05-2024. Civil Work Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Conservation Work |
2 | Dismantling & taking out old budged R.R masonry for removing and uprooting of tree inside the wall manually means including shorting out the servicieable material and stacking at suitable place & removal of refused debris & malwa from site to a lead of 300 mtr & lift 10 to 15 mtr and removing the vegitation growth roots & plants on the wall surface area. |
3 | R R Masonry with lime mortar 1:1:1(1 lime:1 surkhi:1sand) with DQ stone(40% old present at side after dismantling and 60% new ) and removing the vegitation growth roots & plants on the wall surface area. |
4 | Provision for core filling with 70% new & 30% old available CR Masonry/RR hard stone in superstructure above plinth level with lime mortar (1:1:1) and stone aggregate 20 to 40 mm nominal size for leveling of the coarses of masonry to match the original including supply of all material,T&P and required labour to complete the work upto a height 3 to 5 mtr. |
5 | Recessed pointing the joints of R.R. stone masonry in 1:1:1 (1 U/Lime ,1 Surkhi , 1 Sand) mixed with adhesive material within 300mtr lead and lift of 6mtr etc complete. |
6 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In Cement Mortar |
7 | Providing and laying 100mm thick lime concrete bed with 20mm to 25mm thick brick blast mixed with 50% lime mortar in ratio of 1:1:1 (1 U/lime ,1 surkhi ,1 Sand )after compacting of loose soil, including beation and ramming for finishing the top surface and adding adhesive material comlete with in 300m lead and lift of approx 6m. |
8 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil |
9 | Errection and dismantling tubular scaffolding with the help of wooden planks and narial rope etc. complete |
10 | Removal of malba/rubbish by mechanical transportation upto dumping ground lead 10 to 15 km approx |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy