Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For 1. Capacity Increasing 1×5+1×8 Mva To 1×5+1×10 Mva Power Transformer At 33/11 Kv Sub-Station Sulatanganj In Distt. Mainpuri On Semi Turnkey Basis.2. Capacity Increasing 2×5 Mva To 1×5+1×10 Mva Power Transformer At 33/11 Kv Sub-Station Shamserga. Submission Date for this Tender is 10-05-2024. Power Transformer Tenders in mainpuri Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 03-May-2024 | Date Extension-1 of Ten No. EWCA/T-25 (2023-24) for Increasing capacity 33, 11 Sub-Station Sulatanganj, Shamserganj, Chauraipur, Manchana, Aramsarai, Bhogaon Dehat and installation of additional 5 MVA Transformer at Bewar Sub station in Distt.- Mainp | Date | 10-05-2024 |
FileName | File Description | File Size |
52f86e7c-0a2f-485c-8b41-601b74e058eb.html | Tender Notice | 0 KB |
BOQ_1594899.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tendoc25.rar | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Carriage of 33 KV Bus Isolator, Lightening Arrestors, 33 KV VCB, Control Panel, CT, PT, 11 KV SWITCH GEARS of Incoming & Outgoing, 11 KV Cable, jointing kit, Pole, ACSR Dog Conductor, etc. from Center Store to Site |
2 | 33 KV Bus Isolator |
3 | G.I. Structure for 33 KV Bus Isolator |
4 | 33 KV Post Insulator |
5 | G.I. Structure for 33 KV Post Insulator |
6 | 33 KV Lightening Arrestors |
7 | G.I. Structure for 33 KV Lightening Arrestors |
8 | 33/11 KV Transformer 5 MVA |
9 | 33/11 KV Transformer 10 MVA |
10 | 90 Lbs. Rail pieces for T/F |
11 | 33 KV Fuse Set |
12 | G.I. Structure for 33 KV Fuse Set |
13 | 33 KV VCB 800A, 750 MVA with structure |
14 | 33 KV Control Panel for single T/F |
15 | 33 KV CT 400/200/1A |
16 | G.I. Structure of 33 KV CT |
17 | Plinth & foundation of 33 KV VCB. |
18 | 11 KV SWITCH GEARS Incoming 600/300/5A, 350MVA, I /C |
19 | 11 KV SWITCH GEARS Outgoing 200/100/5A, 350MVA |
20 | 11KV 3 Core XLPE Cable3 × 300 Sq.mm |
21 | 11KV 3 Core XLPE Cable 3 × 185 Sq.mm |
22 | Laying and dressing of 11 KV , 3x300/185 Sq. mm. under ground cable in the trench as per Resspo norms. The work includes supplying of fine sandand bricks, refilling and ramming of the left out soil, closing the trench and leveling. |
23 | 11KV Cable jointing kit. Heat Shrinkable 3x300 Sq.mm Indoor |
24 | 11KV Cable jointing kit. Heat Shrinkable 3x300 Sq.mm Outdoor |
25 | 11KV Cable jointing kit. Heat Shrinkable 3x185 Sq.mm. Indoor |
26 | 11KV Cable jointing kit. Heat Shrinkable 3x185 Sq.mm. Outdoor |
27 | 33 KV 1 Ph PT 33 KV/110 V |
28 | PCC Pole8.5 Mtr. long |
29 | G.I. Nut, bolt with washer |
30 | GI Stay Rod 16x1800mm |
31 | 11 KV Stay clamp |
32 | 11 KV Stay Insulator |
33 | Stay wire 7/10 SWG |
34 | Concreting of Stay Road 16x1800mm |
35 | Concreting of support (0.268 Cub.M/Pole) |
36 | Supply & Laying of 4 x 2.5 mm² control cable through cable trench in SGR interlinking through proper connections Transformer control panel/ Protection board/Battery & Battery Charger/buchholtz relay/ 33/11 KV Transformer junction box/ 33 KV VCB, CTs, PT etc. as per site conditions. |
37 | Supply & Laying of 2 x 2.5 mm² control cable through cable trench in SGR interlinking through proper connections Transformer control panel/ Protection board/Battery & Battery Charger/buchholtz relay/ 33/11 KV Transformer junction box/ 33 KV VCB, CTs, PT etc. as per site conditions. |
38 | Outdoor Equipment (Earth Mat) of Sub-Station as per Resspo norms |
39 | Indoor Equipment (Earth Mat) of Sub-Station as per Resspo norms |
40 | ACSR Dog conductor |
41 | Pipe Earthing of Power Transformer by way of boring and loweringof “B” class G.I. pipe 50 mm. dia. into the ground up to the water level to the lower end of which a solid copper con approx 9 inches long and 750 gram in weight provided and screwed in connecting and bringing out continuous copper wire 8 SWG from the cone to the ground surface where it will be bolted to the G.I. Earth strip for Transformer neutral connection. The earth strip will be welded to the G.I. pipe. The work also includes cap and clamp for pouring water, the cost of all material with all labour and T&P etc. complete in all respect. |
42 | Chemical Pipe earthing |
43 | P.G. clamp |
44 | 24 V Battery with Battery Charger Cabinet. |
45 | Fabrication and grouting of G.I. Channel 100x50x6 mm. in L shape & in proper size and alignment to provide support for the two separate Earthingstrips for power transformer neutral including supply & fixing of two nos. flexible copper bonds for neutral Earthing. The work also includes painting of G.I. Channel with two coats of aluminium paint. |
46 | Fabrication and erection of cable support made of two pieces ofG.I. 65x65x6 mm. 3.00mtr. long, joined to each other by means of 5 Nos. M.S. flat 50x6 mm. pieces of size 150 mm. long each by welding at equal intervals as per drawing and grouting in a block of size 300x300x700 mm complete with two coats of Aluminum paint. This includes providing of four nos. G.I. clamp made of G.I. flat for holding the cable including Nuts & bolts. |
47 | PLINTH OF 5 MVA, 33/11 KV TRANSFORMERS : Construction of plinth of size 3.46x4.46 Mtr. for 5 MVA Transformers having 0.5 Mtr. below ground level and 0.4 Mtr. above ground level.The work also includes laying of 2 Nos. 3.46 Mtrs. long each rail pieces complete with cutting welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/finished on top and sides of the plinth. |
48 | Protection board |
49 | Connecting T/F body and structure of 33 KV VCB, 33 KV CT, PT and 11 KV VCB, etc. to earthmat through G.I. flat |
50 | Sundry Stores (Connecting clamps for all equipment & T/F ) |
51 | LED light 100 Watt complete with fitting and accessories |
52 | Barbed wire fencing with gate etc (switchyard) |
53 | Dismantling charges of Transformer and keeping it at safe place in Sub-Station |
54 | Dismantling & Carrige of 33 KV VCB with structure (Including cartage of dismantled material from site to concerning store of DVVNL) |
55 | Dismantling charges of yard fencing and keeping it safe place at Sub-Station |
56 | Dismantling charges of 02 No. 8.5 Mtr. Double Pole Structure and re-installation of fittings on new Double Pole Structure |
57 | Road restoration charges for pucca road crossing |