Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Replacement Of Damaged 33Kv Underground Cable 33/11Kv Substation 142 Emanating From 220Kv S/S Sector 129, Noida Under Eudd – Iii, Noida. Submission Date for this Tender is 29-04-2024. Substation Tenders in Ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Replacement of Damaged 33KV underground Cable 33/11KV Substation 142 emanating from 220KV S/S Sector 129, Noida under EUDD – III, Noida |
2 | Safe carriage of following stock material, from any of the Store Center of PVVNL to work siteincluding Loading from Store and safe unloading at site for Item No. 3 to5 |
3 | 33KV 3X300SQMM XLPE CABLE |
4 | Heat Shrinkable outdoor type end termination cable jointing kit suitable for 33KV XLPE 3x300Sq.mm. cable(Make - Raychem/3M/Denson) |
5 | Heat Shrinkable Straight Through suitable for 33KV XLPE 3x300Sq.mm. cable(Make - Raychem/3M/Denson) |
6 | Errection of above Following material and Supply and errection of the below material for completing the works as per RESPO. |
7 | Supply of 140mm OD PN-4-PE-80 Grade UV Stabilized HDPE Pipe.(PVVNL GTP APPROVED) |
8 | Drilling of dia 220 mm in two parallel bores for Double Curcuit by trenchless method by horizontal boring machine at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level with complete work in all respect as per RESPO. |
9 | Laying ofHDPE Pipe PE-80, PN-6, DN-160mm dia by HDD trenchless method for 33 KV 3x300sq.mm XLPE cable as per site requirement. (PVVNL GTP APPROVED HDPE PIPE SHALL BE SUPPLIED WITH INSPECTION.) |
10 | Laying and commissiong of 33 KV 3x300sqmm XLPE CableDouble Ckt. in HDPE Pipe dia after digging HDD trenchless methodboring including complete connections at both ends after providing and crimping of lugs of proper size for completion of work.as per site requirement. |
11 | Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop and making risers at double pole and re-filling of pits in proper manner with required material at kacha/pakka and hot mix road. (All Work and materialin the scope of contractor) |
12 | Laying and commissiong of 33KV 3x300sqmm XLPE CableDouble Ckt. after digging trenchof dia 220 mm in two parallel bores for Double Curcuit by manual method at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level withfor laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and Providing & Laying of Ist Class Bricks, along the length on both side of 33KV XLPE Cable in Cable Trench (minium 18No. Bricks/Mtr per Cable) and Stone Slab of size 450x600x50mm on top of the each Cable, Providing 150 thickness mm River sand for cushion beneath and 150mm above the cable and Back filling of excavated earth in the cable trench upto the ground level and ramming properly. |
13 | Preparation of 33 KV Power Cable ends: Making of 33 KV XLPE Heat shrinkable outdoor jointing kits suitable for 3x300sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect. |
14 | Preparation of 33 KV Power Cable ends: Making of 33 KV XLPE Straight Through suitable for 3x300sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy