Tender For Routine Maintenance Of Ht And Lt Transformers Along With Breakdown Maintenance Of Ht/Lt Transformers And Round The Clock Routine And Preventive Maintenance Work Of 6.6 Kv Buses With Their Associated Panels And Their Up-Keeping Of Unit 5 An, aliganj-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Tender For Routine Maintenance Of Ht And Lt Transformers Along With Breakdown Maintenance Of Ht/Lt Transformers And Round The Clock Routine And Preventive Maintenance Work Of 6.6 Kv Buses With Their Associated Panels And Their Up-Keeping Of Unit 5 An. Submission Date for this Tender is 13-05-2024. clocks Tenders in aliganj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43213171
Tender For Routine Maintenance Of Ht And Lt Transformers Along With Breakdown Maintenance Of Ht/Lt Transformers And Round The Clock Routine And Preventive Maintenance Work Of 6.6 Kv Buses With Their Associated Panels And Their Up-Keeping Of Unit 5 An
Open Tender
Indian
Uttar Pradesh
aliganj
13-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Routine Maintenance Of Ht And Lt Transformers Along With Breakdown Maintenance Of Ht / Lt Transformers And Round The Clock Routine And Preventive Maintenance Work Of 6.6 Kv Buses With Their Associated Panels And Their Up-Keeping Of Unit 5 And 6

Key Value

Document Fees
INR 1180 /-
EMD
INR 50000.0 /-
Tender Value
INR 28.68 Lakhs /-

Attachment

FileName File Description File Size
774098fb-88b8-47fb-a350-7fdc59c9a00e.html Tender Notice 0 KB
BOQ_1593756.xls Tender Document 0 KB
TENDERDOCS.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work: "Routine Maintenance & Up-keeping of HT & LT Transformers along with breakdown maintenance of HT/LT Transformers and round the clock routine and preventive maintenance work of 6.6 KV buses with their associated Panels and their up-keeping of UNIT#5&6 of 2X250MW PTPP, Parichha"
Sl. No. Item Description
1Routine Maintenance and upkeeping of HT/LT Transformers installed in the premises of Unit #5 and unit #6of 2X250 MW Parichha Thermal Power Project Parichha Jhansi as per scope of work from Sl. No. 1 to 24 for Part A & from Sl. No. 1 to 3 for Part B. 5
2Round the clock routine and Preventive Maintenance Work of complete 6.6 KV Unit switchgear (5CA,5CB,6CA&6CB), Station switchgear ( OCA,OCB,OCC& OCD)& 6.6KVAsh HandlingSwitchgear (OCF)with their associated UECP/CECP Panels of UNIT#5&6 of 2X250MW PTPP, Parichha (Jhansi) as per scope of work from Sl. No. 1 to 10 for Part 2A, Sl. No. 1 to 18 for Part 2B, Sl. No. 1 to 23 for Part 2Cand Sl. No. 1 to 5 for Part 2d including their upkeeping as per scope of work.(Total 144 Nos. Panels)
3Removal & reconnection of 220/400 KV top bushing connection.
4Checking of oil level in 220/400 KV bushing.
5Proper cleaning of 220/400 KV bushing with suitable cleaning agent to restore its shining.
6Draining of Transformer oil upto required level from the main tank of transformer in available Transformer oil barrels/Tank etc.
7Centrifuging of Transformer oil using filtration plant provided by the Deptt. (* hrs shift).
8Filling/topping up of Transformer oil in HT/LT transformers.
9Opening & closing of Inspection cover of HT Transformer.
10Removal & reconnection of 220/400 KV bushing connection with Transformer winding of GT/ST.
11Shifting of 220/400 KV bushing from central store to G.T./S.T. Transformer yard/shifting of damaged bushing from sideto the place to be intimated.
12Removal & installation of 220/400 KV bushing.
13Replacement of worn out/damaged gasket of marshaling box cover as per the size of original gasket by applying rubber solution after removing old worn out/damaged gasket. a. HT Transformer
14b. LT Transformer
15Filling of Transformer oil in 220/400 KV bushing by erecting scaffolding & removal after completion of work.
16Arresting oil leakages from HT/LT Transformers by tightening flanges or applying M-seal / Devcon make titanium putty.
17Checking & servicing of Magnetic oil gauge as per scope of work Sl. No. 1 to 7.
18Overhauling of OLTC operating system of GT/ST as per scope of work Sl. No. 1 to 9.
19Delinking & relinking Generator phase or Neutral side 16.5 KV bushing connection from IP busduct.
20Delinking & relinking Generator transformer from IP busduct.
21Delinking & relinking of 16.5 KV bushing of UAT from IP busduct.
22Delinking & relinking of PTSP form IP busduct.
23Delinking & relinking of 16.5 KV bushing connection from Transformer winding of (a) Generator Transformer
24(b) Unit Auxiliary Transformer
25Shifting of 16.5 KV bushing from central store to G.T./S.T. Transformer yard.
26Removal & installation of 16.5 KV bushing.
27Removal & Installation of rubber bellow of IP busduct after shifting of rubber bellow from CSD store to site.
28Opening & closing of upper manhole of SP busduct of UAT/Station Transformer.
29Opening & closing of lower manhole of SP busduct of UAT/ Station Transformer.
30Opening & closing of upper manhole of IP busduct.
31Opening & closing of lower manhole of IP busduct.
32Partitioning & reconnection of SP busduct.
33Opening & closing of rubber bellow/ring of IP busduct.
34Opening & closing of rubber bellow of SP busduct.
35Cleaning of 16.5 KV support insulator inside IP busduct with petrol/CTC.
36Cleaning of 6.6 KV support insulator/seal of bushing inside SP busduct with Petrol/CTC.
37Removal & installation of 6.6 KV bushing of UAT/Station T/F.
38Removal & installation of 16.5 KV support insulators inside IP busduct.
39Removal & installation of 6.6 KV support insulators inside SP busduct.
40Removal & installation of 6.6 KV seal of bushing inside SP busduct.
41Delinking & relinking of 6.6 KV bushing of station Transformer or UAT from SP busduct.
42Opening & closing of upper manhole of 0.4 KV side NSP busduct of LT Transformer.
43Opening & closing of lower manhole of 0.4 KV side SP busduct of LT Transformer.
44Cleaning of 0.4 KV support insulator inside NSP busduct of LT Transformer.
45Removal & installation of 6.6 KV bushing of L.T. Transformer.
46Removal & installation of 0.4 KV bushing of L.T. Transformer.
47Removal & installation of 0.4 KV support insulator inside busduct of L.T. Transformers.
48Cleaning & servicing of dry type transformer as per scope of work mentioned at Sl. No. 01 to 07.(a) 6.6/0.4 KV 2500 KVA Dry type Transformer
49(b) 6.6/0.4 KV 2000 KVA Dry type Transformer
50(c) 6.6/0.4 KV 1600 KVA Dry type Transformer
51(d) 6.6/0.4 KV 1000 KVA Dry type Transformer
52Drying out of LV Bushings / Seal off Bushings of Generator / GT/ ST/UAT and bring IR values upto the mark as per instruction of AE/JE.
53Cleaning of HT Transformers after completion of centrifuging/ overhauling work.(a) Generator Transformer
54(b) Station Transformer
55(c) Unit Auxiliary Transformer
56Overhauling of LT Transformer as per scope of work mentioned at Sl. No. 01 to 15. (a) 6.6/0.4 KV 1000 KVA Transformer
57b) 6.6/0.4 KV 1600 KVA Transformer
58(c) 6.6/0.4 KV 2000 KVA Transformer
59(d) 6.6/0.4 KV 2500 KVA Transformer
60Overhauling of Marshalling Boxes of HT Transformers.
61Overhauling of Marshalling Boxes of LT Transformers.
62Cleaning & checking of C.T. & tightening of C.T. connection inside IP Busduct.
63Checking of space Heaters inside the SP Busduct.
64Dismantling / remounting of PRV of Generator Transformer or station Transformer or Unit Auxiliary Transformer for its checking or replacement.
65Dismantling & remounting of Buchholz Relay of Generator Transformer or station Transformer or Unit Auxiliary Transformer for checking or replacement.
66Dismantling & remounting of surge Relay of Generator Transformer or station Transformer for checking or replacement.
67Dismantling & remounting of Buchholz Relay of LT transformers.
68Shifting of filtration plant and storage tank from transformer yard of Unit No.5 to that of Unit No. 6 or vice versa.
69Cleaning of 10 KL capacity transformer oil tank.
70Filling of air in the tyres of filtration plant and oil storage tank.
71CLEANING AND PAINTING OF VARIOUS ELECTRICAL EQUIPMENTS IN TRANSFORMER YARD.
72Cleaning/drying out of flexible links of Generator/GT /ST /UAT.
73Removal of top cover of L.T. Transformer & installation after completing work.
74Replacement of top cover cork sheet gasket of L.T. Transformer.
75Cleaning, checking and tightening of electrical components and PT inside SVPT as per scope of work from Sl. No. 1 to 11.
76Cleaning, checking and tightening of neutral grounding system of generator including Neutral grounding Transformer as per scope of work from Sl. No. 1 to 11.
77Shifting of new transformer oil filled drums from central store/ any site within Plant to transformer yard/shifting of old Transformer oil filled drum from site to CSD store or at the assigned site.
78Tightening of upper manhole of IP/SP busduct.
79Tightening of lower manhole of IP/SP busduct.
80Shifting of empty Transformer oil drums from site to CSD store.
81Cleaning and Maintenance of Centrifuging Machine(a)        Internal And external Cleaning of Centrifuging machine
82b)       Replacement of filter by new one.
83c)        Replacement of heaters
84d)       Rectification of control and instrumentation problems of starting panels of centrifuging machine.
85e)        Changing of various Gaskets.
86Cleaning and painting of various electrical equipments in transformer yard.
87Disconnection & reconnection of(a)Neutral Grounding Transformer of Generator.
88(b)Neutral Grounding of Generator Transformer.
89(c)Neutral Grounding of station Transformer.
90(d)Neutral Grounding of UAT.
91Removal of 3 Phase LT motor from its foundation and installation after completion of work.(a) 0.37 KW to 1.0 KW
92(b) 1.1 KW to 1.5 KW
93(c) 2.2 KW to 3.75 KW
94(d) 7.5 KW
95(e) 11 KW
96Removal and installation of fan/coupling/ bearing from /on rotor shaft.(a) 0.37 KW to 1.0 KW
97(b)1.1 KW to 1.5 KW
98(c)2.2 KW to 3.75 KW
99(d)7.5 KW
100(e)11 KW
101O/H of 3 Phase LT motor by shifting, dismantling, assembling & reshifting to its foundations for installation. (a) 0.37 KW to 1.0 KW
102(b) 1.1 KW to 1.5 KW
103(c) 2.2 KW to 3.75 KW
104(d) 7.5 KW
105(e)11 KW
106Rewinding of 3 Phase LT motor with new copper wire exactly similar to original winding.(a)0.37 KW to 1.0 KW
107(b) 1.1 KW to 1.5 KW
108(c) 2.2 KW to 3.75 KW
109(d) 7.5 KW
110(e)11 KW
111Repairing of DE/NDE side bearing housing by remetallizing & machining to original size. (a)0.37 KW to 1.0 KW
112(b) 1.1 KW to 1.5 KW
113(c)2.2 KW to 3.75 KW
114(d) 7.5 KW
115(e) 11 KW
116Repairing of DE or NDE side bearing sheet by remetallizing & machining to original size.(a)0.37 KW to 1.0 KW
117(b) 1.1 KW to 1.5 KW
118(c)2.2 KW to 3.75 KW
119(d) 7.5 KW
120(e) 11 KW
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail