|
| 1 | SITC of Wi-Fi infra - Supply Portion |
| 2 | Unified Threat Management System(UTM) |
| 3 | Wireless LAN Controller |
| 4 | Indoor Access Point |
| 5 | Outdoor Access Point |
| 6 | Access Logging System |
| 7 | 24 Ports Switch |
| 8 | 24 Port Core Switch |
| 9 | 8 Port PoE+ Switch |
| 10 | P2P RF Antenna(UBR) with all accessories |
| 11 | OLT 8 GePON Port |
| 12 | ONU with LAN,Wifi and FXS Port |
| 13 | Splitter(1:64) |
| 14 | Rack 42 U |
| 15 | RACK 9U |
| 16 | 12-Port LIU fully Loaded with SC-SC Adap |
| 17 | 24-Port LIU fully Loaded with SC-SC Adap |
| 18 | Fiber Patch Cord SC to SC Simplex |
| 19 | Fiber Patch Cord LC to SC Duplex |
| 20 | 6-Core Armoured SM OFC |
| 21 | 12-Core Armoured SM OFC |
| 22 | Fiber Flexible Drop Wire 2-Core |
| 23 | FTTH I/O with SC Keystone and SM-SC Pigt |
| 24 | 24-Port Cat 6 FullyLoaded Jack Panel |
| 25 | Cat-6 STP Cable |
| 26 | Cat 6 IO Box |
| 27 | Cat 6 Patch Chord (3m) |
| 28 | Permanently Lubricated ISI40 mm HDPE T |
| 29 | PVC Conduit - 25mm Día,ISI Marked |
| 30 | PVC Casing Caping25 x 16mm,ISI Marke |
| 31 | PVC FlexiblePipe 1\",ISI Marked |
| 32 | GI Pipe 72mm Dia, 10 Feet long, ISI Mark |
| 33 | UPS5KVA with Battery Bank (6 hrs backu |
| 34 | Underground Fiber Spliceng Box 24X4 Fibe |
| 35 | SITC of Wi-Fi infra - Installation &Comm |
| 36 | Installation Active Components Sr 1to12 |
| 37 | Installation of9 & 42 U Racks |
| 38 | Installation of 12& 24-Ports LIU |
| 39 | 24 Port Cat 6 FullyLoaded Jack Panel |
| 40 | Fixing of Cat-6 IO Box |
| 41 | Laying of Cat 6 STP |
| 42 | Laying of OFC-12/6 Cores |
| 43 | Laying of OFC Drop wire |
| 44 | OFC Splicing |
| 45 | Permanently Lubricated ISI40 mm HDPE T |
| 46 | Fixing or Laying of 25 mm dia PVC condui |
| 47 | UPS5KVA with Battery Bank (# hrs backu |
| 48 | GI 75mmISIGI Pole 10 Feet |
| 49 | Hard Digging (2 Feet deep) |
| 50 | Soft Diging(2 Feet deep) |
| 51 | Warranty Support Services for 03 Years |
| 52 | Monthly Warranty Support Services (Refer Units-Month for Clarity) |