}

Tender For Fixing Of Rate Contract For Maintenance Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division Jpdcl Batote For The Financial Year 2024 25, ramban-Jammu And Kashmir

Power Development Department has published Tender For Fixing Of Rate Contract For Maintenance Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division Jpdcl Batote For The Financial Year 2024 25. Submission Date for this Tender is 06-05-2024. Civil Work Tenders in ramban Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43204823
Tender For Fixing Of Rate Contract For Maintenance Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division Jpdcl Batote For The Financial Year 2024 25
Open Tender
Indian
Jammu And Kashmir
ramban
06-05-2024

Tender Details

Fixing Of Rate Contract For Maintenance Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division Jpdcl Batote For The Financial Year 2024 25 Fixingofratecontractformaintenance Restoration And Works Of Emergent Natureofdistributionnetwork In The Jurisdiction Ofelectricdivision Jpdcl Batotefor The Financial Year 2024 25

Key Value

Document Fees
INR 2000 /-
EMD
INR 100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Fixing of Rate Contract for Maintenance, Restoration and Works of Emergent nature of Distribution Network in the Jurisdiction of Electric Division, JPDCL Batote for the financial year 2024-25..
Sl. No. Item Description
1Items of Emergent and Maintenance Works
2Unloading T&P items
3Carriage of T and P items upto 100 Mtr
4Carriage of T and P items for subsequent100 Mtr
5Branch Cutting along the DT/HT/LT network for providing standard ground clearance
6Route clearance for making pathfor safe working
7Unloading of PCC 8 Mtr Pole
8Average carriage of PCC 8Mtr Pole upto 100 Mtr
9Average carriage of PCC 8 Mtr Pole for subsequent100Mtr
10Erection of PCC 8Mtr Pole with Cross-Arm/U-clamp
11Dismantling ofPCC Pole 8 Mtr Long
12Unloading of ST 8 Mtr Pole
13Average carriage of ST 8 Mtr Pole upto 100 Mtr
14Average carriage of ST 8Mtr Pole for subsequent100Mtr
15Erection ofST 8 Mtr Pole with Cross-Arm/U-clamp
16Dismantling ofST Pole 8 Mtr Long
17Unloading of PCC 9 Mtr Pole
18Average carriage of PCC 9 Mtr Pole upto 100 Mtr
19Average carriage of PCC 9 Mtr Pole for subsequent100Mtr
20Erection of PCC 9 Mtr Pole with Cross-Arm/U-clamp
21Dismantling of PCC Pole 9 Mtr Long
22Unloading of ST 9 Mtr Pole
23Average carriage of ST 9 Mtr Pole upto 100 Mtr
24Average carriage of ST 9 Mtr Pole for subsequent100Mtr
25Erection ofST 9 Mtr Pole with Cross-Arm/U-clamp
26Dismantling ofST Pole 9 Mtr Long
27Unloading of PCC 11 Mtr Pole
28Average carriage of PCC 11 Mtr Pole upto 100 Mtr
29Average carriage of PCC 11 Mtr Pole for subsequent100Mtr
30Erection of PCC 11 Mtr Pole with Cross-Arm/U-clamp
31Dismantling ofPCC Pole11 Mtr Long
32Unloading of ST 11 Mtr Pole
33Average carriage of ST 11 Mtr Pole upto 100 Mtr
34Average carriage of ST 11 Mtr Pole for subsequent100Mtr
35Erection ofST 11 Mtr Pole with Cross-Arm/U-clamp
36Dismantling of ST Pole 11 Mtr Long
37Unloading of ST 13 Mtr Pole
38Average carriage of ST 13 Mtr Pole upto 100 Mtr
39Average carriage of ST 13 Mtr Pole for subsequent100Mtr
40Erection ofST 13 Mtr Pole with Cross-Arm/U-clamp
41Dismantling ofST Pole 13 Mtr Long
42Straightening of tilted 8Mtr PCC pole
43Straightening of tilted 9Mtr PCC pole
44Straightening of tilted 11Mtr PCC pole
45Straightening of tilted 8Mtr ST pole
46Straightening of tilted 9Mtr ST pole
47Straightening of tilted 11Mtr ST pole
48Straightening of tilted 13Mtr ST pole
49Fixing of GI Barbed Wire for anti Climbing
50Erection of Danger Plates with Clamps
51Dismantlingof Danger Plates with Clamps
52Erection of Anti Climbing Device with Clamps
53Dismantling of Anti Climbing Device with Clamps
54Painting of LT STPoles (8Mtr,9Mtr,11Mtr) andallied material( excluding cost of material)
55Painting of HT STPoles (8Mtr,9Mtr,11Mtr) andallied material( excluding cost of material)
56Painting of HT STPoles (13Mtr) andallied material( excluding cost of material)
57Painting of Substation Poles andallied material( excluding cost of material)
58Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor)
59Unloading of Line Material
60Loading of Line Material
61Loading of ACSR conductors of all sizes(scrap/roll/drum)
62Loading of HT/LT AB/XLPE Cables of all sizes( in scrap/roll/drum)of all sizes
63Watch and Ward of Material
64Punching/Making of Holes on M S Channel
65Punching/Making of Holes on M S Angle Iron/Braces
66Fabrication of Ms Steel i.e Channel , Angle Braces etc at site as requirements
67Drilling holes in the iron piece
68Fixing ofM S Channels 10/9/7/6 feet long
69Fixing ofMS Channels 4.5/3 feet long
70Fixing ofM S Angle Iron 10/9/7/6 feet long
71Fixing ofMS Angle Iron 5/4.5/3 feet long
72Dismantling ofM S Channels 10/9/7/6 feet long
73Dismantling ofMS Channels 4.5/3 feet long
74Dismantling ofM S Angle Iron 10/9/7/6 feet long
75DismantlingofMS Angle Iron 5/4.5/3 feet long
76Fixing of U-Clamps and Shackle Insulators
77Dismantlingof U-Clamps and Shackle Insulators
78Fixing/Installation of 11 KV Pin Insulators with Pins
79Dismantling of 11 KV Pin Insulators with Pins
80Fixing/Installation of Complete LT switchgear MCCBs(complete job)
81Fixing/Installation of 11 KV Disc Insulators with fittings
82Dismantling of 11KVDisc Insulators with fittings
83Installation of Link/DO set
84Installation of HG set
85Dismantling of Link/DO Set
86Dismantling of HG Set
87Installationof GO Set(complete)
88Dismantling of GO Set(complete)
89Installation of LA Set(Station type)
90Dismantlingof LA Set(Station type)
91Installation of LASet(Line Type)
92Dismantling of LASet(Line Type)
93Unloading of CT/PT Unit
94Average carriage of CT/PT Unit upto 100 Mtr
95Average carriage of CT/PT for subseqent 100mtrs
96Erection of CT/PT Unit along with Trivector Meter
97Erection of CT/PT Unit
98Dismantling of CT/PT Unit
99Testing and commissioning of CT/PT Unit
100Earthing of CT/PT Unit
101Unloading of 25/63/100KVA Transformer
102Unloading of 250/400/500/630 KVA Transformer
103Construction of Cement Platform (8x8x6), 3feet below ground level & 3feet below ground level for Distribution transformer 400/500/630 KVA (Matrerial to be provided by contractor)
104Average carriage of 25/63/100 KVA upto 100 Mtr
105Average carriage of 25/63/100 KVA for subsequent 100 Mtr
106Average carriage of 250/400/500/630 KVAupto 100 Mtr
107Average carriage of 250/400/500/630for subsequent 100 Mtr
108Mounting of 25/63/100 KVA Transformer
109Mounting of 250/400/500/630KVA Transformer
110Unmounting of 25/63/100KVA Transformer
111Unmounting of 250/400/500/630KVA Transformer
112Erection of HVDS 25KVA
113Dismantling of HVDS 25KVA
114Earthing of HVDS 25KVA
115Fixing of Jumpers
116Dismantling of Jumper
117Earthing of poles for HT Line
118Earthing of poles for LT Line
119Earthing of Substation complete(Poles,Transformer,LA) per qty
120Fixing of LT Circuit Component of Substation(LT cables,Thimbles, Busbar,Shackle insulators) with Fuse Set / MCCBwith Box
121Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU"s for Outgoing Circuits
122Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU"s for Outgoing Circuits
123Fixing of LT Distribution Box for 400/ 500/630 KVA DTR with MCCB for incomer & SFU"s for Outgoing Circuits
124Fabrication & fixing of LT Switch made of angle Iron 50x50x6 with LT busbar 50x6mmon bus bar insulator
125Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit
126Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps
127Dismantling of LT Circuit Component of Substation (LT cables,Thimbles, Busbar,Shackle insulators) with Fuse Set / MCCBwith Box
128Testing and commissioning of Substation
129Laying/Stringing of ACSR Conductor 20/30mmsq/Squirel /Weasel
130Dismantling of Old Squirell/Weasel ACSR Conductor
131Laying/Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog
132Dismantling of Old Dog/Rabbit ACSR Conductor
133Tightening of loose conductor
134Erection of Guys in HT/LT Line , with stay wire binding for eye bolt, Guy insulator & anchor rod and Back filling the stay pit
135Dismantling of Guys in HT/LT Linewith stay wire binding for eye bolt, Guy insulator & anchor rod and Back filling the stay pit
136Fixing of Suspension/Anchoring Clamps
137Laying/Erection/Stringining of HT AB/XLPE Cable (25/35/50 mmsq)
138Dismantling of HT AB/XLPE Cable 25/35/50 mmsq
139Laying/Erection/Stringining of HT AB/XLPE Cable 70/95/120 mmsq
140Dismantling of HT AB/XLPE Cable 70/95/120 mmsq
141Laying/Erection/Stringining of HT AB/XLPE Cable 150/185mmsq
142Dismantling of HT AB/XLPE Cable 150/185mmsq
143Laying/Erection/Stringining of HT AB/XLPE Cable 240/300 mmsq
144Dismantling of LT AB/XLPE Cable 240/300 mmsq
145Laying/Erection/Stringining of LT AB/XLPE Cable 25/35/50 mmsq
146Dismantling of LT AB/XLPE Cable 25/35/50 mmsq
147Laying/Erection/Stringining ofLT AB/XLPE Cable 70/95/120 mmsq
148Dismantling ofLT AB/XLPE Cable 70/95/120 mmsq
149Laying/Erection/Stringining of LT AB/XLPE Cable 150/185mmsq
150Dismantling of LT AB/XLPE Cable 150/185mmsq
151Laying/Erection/Stringining of LT AB/XLPE Cable 240/300/400 mmsq
152Dismantling of HT AB/XLPE Cable 240/300/400 mmsq
153Laying of LT PVC Single Core Cable 95 mm sq for Dt"s
154Laying of LT PVC Single Core Cable 185 mm sqfor Dt"s
155Laying of LT PVC Single Core Cable 300 mm sqfor Dt"s
156Laying of LT PVC Single Core Cable 400 mm sqfor Dt"s
157Laying of LT PVC Single Core Cable 630 mm sq for Dt"s
158Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines including jointing Kit ofsizes upto 95sqmm
159Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines including jointing Kit ofsizes95sqmm to 185sqmm
160Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines including jointing Kit ofsizes above 185sqmm
161Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofLT Lines of all sizes
162Fixing of Mid SpanStraight Jointer Kit for AB/XLPE cables ofHT Lines of all sizes
163Fixing of Mid SpanStraight Jointer Kit for AB/XLPE cables ofLT Lines of all sizes
164Earthing of Cable
165Fixing of IPC 120/50mm
166Fixing of Single Phase Meters
167Fixing of Three Phase Meters
168Labour charges for erection of HT metering cubicle including all connections and earthing as per departmental standards.
169Labour charges for erection of HT Trivector meter box including all connections and earthing as per departmental standards.
170Labour charges for testing and repairing of meters and rigging and modification of CT Boxes.
171Sealing of Meter bit, including inserting of wire
172Winding of trip and close coils including material and without bobbin
173Fixing of 3-Ph LT CT Meter at DTR (including transport)
174Replacement of existing S-Ph meter with H.A meter (all types including infrared(IR) meter) including writing meter change slip and handing over to Section office including transporting from section office to location and back.
175Replacement of existing 3-Ph meter with H.A meter (all types including infrared(IR) meter) including writing meter change slip and handing over to Section office including transporting from section office to location and back.
176Erection of 11KV and 0.440KV CTs including earthing & Jumpering with GI/Copper wire
177Erection of 11KV and 0.44KV CTs including earthing & Jumpering with GI/Copper/MS Flat Earthing
178Labour charges for sealing of single phase/3 phase meters including transportation of meter box carton to work spot, unpacking, packing of sealed meters and stocking etc., complete.
179Removing the meter back cover, cleaning the old meter cover, painting the meter top & bottom covers with good approved enamel black paint, cleaning the meter with petrol and oiling to bearings with good 2 in 1 oil (Usha make) refixing the meter in meter cover duly providing new gaskets. Testing and adjustments of the meter as per departmental standards, loading, transporting, and unloading including introducing sealing wire to each meter including replacement of glass wherever necessary.
180Supply and rigging of meter with country wood of size 1’x1/2’, 7/20 finolex wire, bolts and nuts and screws along with lugs. Removing of metallic strip in syntex box, fixing of wooden board suitably, fixing of meter and CT in position including fixing of neutral terminal bolt. Providing of internal wiring duly giving proper connections, opening of internal link in the meter duly providing sealing after testing. (energy meter and box will be supplied by the deptt)
181Labour charges for fixing of tube light fitting for street light
182Dismantling of Single Phase Meters
183Dismantling of Three Phase Meters
184Laying& Erection of Service Wire Twin Core 4/6 mmsq
185Laying & Erection of Service Wire Twin Core 10/16 mmsq
186Dismantlingof Service Wire Twin Core 4/6 mmsq
187Dismantling of Service Wire Twin Core 10/16 mmsq
188Installation of 3 Phase 4 Wire Progidy Energy Meter
189Dismantling of 3 Phase 4 Wire Progidy Energy Meter
190Erection of DB/METER Box on PCC/ST Poles
191Fixing of Guard netting of HT/LT Line
192Dismantling/bundling of Guard netting of HT/LT Line
193Fixing/Crimping of Thimbles/Lugs of size 25sqmm to 75sqmm
194Fixing/Crimping of Thimbles/Lugs of size 75sqmm to 185sqmm
195Fixing/Crimping of Thimbles of size 185sqmm above
196Fixing of spacers for LT Line for 5 wires system
197Fixing of spacers for LT Line for 4 wires system
198Fixing of spacers for LT Line for 3/2 wires system
199Installationof MS V- Cross arm
200Installation/Erectionof MS Cross arm upto 3fts long
201Installationof MSCross arm above 3fts to 6fts long
202Installationof MS Cross arm above 6fts to 10fts long
203Fixing/ Erection of Braces
204Dismantling of Braces
205Fixing of Top Clamp for Pin Insulator(HT)/PG clamp
206Dismantling of Top Clamp for Pin Insulator(HT)/PG clamp
207Fixing of U/D Clamp for LT insulator
208Dismantling of U/D Clamp for LT insulator
209Dismantling ofCross Arm upto 3ft long
210Dismantling of Cross Arm above 3ft to 6fts long
211Dismantling ofCross Arm above 6ft to 10fts long
212Dismantling of V Cross Arm
213Replacement/Refitting of HT Bush Rod at site
214Replacement/Refitting of HT Bushing at site
215Replacement/Refitting of LT Bush Rod at site
216Replacement/Refitting of LT Bushing at site
217Fixing of Bi- Metallic Clamps
218Fixing of Aluminium Jointing Sleeve
219Fixing of Wedge connectors/PG clamps
220Stone Pad(300mmX300mmX75mm)
221Topping of oil in DT at site
222Carriage of Material for repair and maintenance work at site upto 100mtrs
223Carriage of Material for repair and maintenance work at site for subsquent 100 Mtr
224Providing code numbers to transformers / structures including cost of paint.
225Charges of Crane / Hydra for loading and unloading works at site (like DT/HT/LT poles and other allied material on per hour basis)
226Erection of Pipe Earthing using CI/GI pipes including pit excavation, backfilling, charcoal&salt/betonite powder and cement collar of 2" dia and 1" height etc complete
227Erection of Spike Earthing as per IS Standards
228Charging for Re- stringing of Loose Span
229Erection ofStrut in DP structure
230Dismantling ofStrut in DP structure
231Fixing/unfasteningof Nuts/Bolts/Washers (Galvanized of sort) as per IS standards
232Concreting of pole of pit of size 2"x2"x5" (0.6mx0.6mx1.5m) with C.C(1:4:8) using 40mm HBG metal.
233Concreting of pole of pit of size 2"x2"x5" (0.6mx0.6mx1.5m) with C.C(1:3:6) using 20mm and 12mmHBG metal.
234Concreting of stay pit of size 1"-6" x 1"-6" x 4"6" (0.45mx0.45x1.35m) with C.C. (1:4:8) using 40 mm and 20mm HBG metal
235Concreting of stay pit of size 1" 6"x 1"-6" x 4" 6"(0.45mx0.45x1.35m) with C.C. (1:3:6) using 20 mm and 12mm HBG metal
236Installation/Fixing of Street Light fixture
237Dismantling/unFixing of Street Light fixture
238Labour charges for Survey and pit marking of HT/LT lines in Plain area
239Labour charges for Survey and pit marking of HT/LT lines in Hilly area
240Excavation of pits in all soils, i.e, mixture of gravel and soft disintegrated rock like shales ordinary gravel, stony earth and earth mixed with fair sized boulders.
241for 8mtr and 9 mtr STpoles
242for 11mtr and 13 mtr STpoles
243for 8mtr and 9 mtr PCC poles
244for 11mtr and 13 mtr PCC poles
245Supply and installation of Chain link security Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations with PCC(1:3:6)and chain link fencing meshof 8guage 50.8mm x 50.8mm(2"" x 2"") size, MS angle 50 x 50 x 6, MS flat 25 x 6 ft height, bolts,nutsAldrop, hinges, with access doora nd lockingfacility including Painting with one coatred oxide, 02 coats aluminum paint of approved brand and Manufacture to give an even shade.(Material will be provided by the Division)
246Carriage ofDismantledMaterial from site upto 100mtrs for Write Back toDivisional Store
247Carriage ofDismantledMaterial from site upto 100mtrs for Write Back toDivisional Store for subsequent 100mts carriage from site
248Unloadingof write backMaterial/ other material for maintenance work
249Loadingof write back Material at site for operation -Maintenance work
250Hiring Charges of Tractor with Trolleyfor shifting of material (including POL and operation charges)
251Hiring Charges of Mini Truck/Carrier for shifting of material (including POL and operation charges)
252Labour charges for erection of LT Dist. Box including earthing as per departmental standards.
253Erection of AB switches: 11 KV AB switch (400Amps)
254Erection of 1-Ph 11KV AB Switch, Operating rod
255AB Switch OFF & ON Base with Clamp
256Earthing of DTR:Running of No 8 G.I wire from Distribution Transformer (3 Phase) AB Switch, HG Fuse Set V’X’ Arm etc running of 14 SWG G.I. Wire including double earthing as per specification for running of total 10 Nos GI wires. (Per Lead Per length)
257General Tree/ Branchespruning/cutting per one day - Semi skilled labour
258Earthing of DTR:Running of No 8 G.I wire from Distribution Transformer (3 Phase) AB Switch, HG Fuse Set V’X’ Arm etc running of 14 SWG G.I. Wire including double earthing as per specification for running of total 10 Nos GI wires. (Per Lead Per length)
259Fixing of Bobin Insulator
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail