Power Development Department has published Tender For Fixing Of Rate Contract For Maintenance Restoration And Works Of Emergent Nature Of Distribution Network In The Jurisdiction Of Electric Division Jpdcl Batote For The Financial Year 2024 25. Submission Date for this Tender is 06-05-2024. Civil Work Tenders in ramban Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Items of Emergent and Maintenance Works |
2 | Unloading T&P items |
3 | Carriage of T and P items upto 100 Mtr |
4 | Carriage of T and P items for subsequent100 Mtr |
5 | Branch Cutting along the DT/HT/LT network for providing standard ground clearance |
6 | Route clearance for making pathfor safe working |
7 | Unloading of PCC 8 Mtr Pole |
8 | Average carriage of PCC 8Mtr Pole upto 100 Mtr |
9 | Average carriage of PCC 8 Mtr Pole for subsequent100Mtr |
10 | Erection of PCC 8Mtr Pole with Cross-Arm/U-clamp |
11 | Dismantling ofPCC Pole 8 Mtr Long |
12 | Unloading of ST 8 Mtr Pole |
13 | Average carriage of ST 8 Mtr Pole upto 100 Mtr |
14 | Average carriage of ST 8Mtr Pole for subsequent100Mtr |
15 | Erection ofST 8 Mtr Pole with Cross-Arm/U-clamp |
16 | Dismantling ofST Pole 8 Mtr Long |
17 | Unloading of PCC 9 Mtr Pole |
18 | Average carriage of PCC 9 Mtr Pole upto 100 Mtr |
19 | Average carriage of PCC 9 Mtr Pole for subsequent100Mtr |
20 | Erection of PCC 9 Mtr Pole with Cross-Arm/U-clamp |
21 | Dismantling of PCC Pole 9 Mtr Long |
22 | Unloading of ST 9 Mtr Pole |
23 | Average carriage of ST 9 Mtr Pole upto 100 Mtr |
24 | Average carriage of ST 9 Mtr Pole for subsequent100Mtr |
25 | Erection ofST 9 Mtr Pole with Cross-Arm/U-clamp |
26 | Dismantling ofST Pole 9 Mtr Long |
27 | Unloading of PCC 11 Mtr Pole |
28 | Average carriage of PCC 11 Mtr Pole upto 100 Mtr |
29 | Average carriage of PCC 11 Mtr Pole for subsequent100Mtr |
30 | Erection of PCC 11 Mtr Pole with Cross-Arm/U-clamp |
31 | Dismantling ofPCC Pole11 Mtr Long |
32 | Unloading of ST 11 Mtr Pole |
33 | Average carriage of ST 11 Mtr Pole upto 100 Mtr |
34 | Average carriage of ST 11 Mtr Pole for subsequent100Mtr |
35 | Erection ofST 11 Mtr Pole with Cross-Arm/U-clamp |
36 | Dismantling of ST Pole 11 Mtr Long |
37 | Unloading of ST 13 Mtr Pole |
38 | Average carriage of ST 13 Mtr Pole upto 100 Mtr |
39 | Average carriage of ST 13 Mtr Pole for subsequent100Mtr |
40 | Erection ofST 13 Mtr Pole with Cross-Arm/U-clamp |
41 | Dismantling ofST Pole 13 Mtr Long |
42 | Straightening of tilted 8Mtr PCC pole |
43 | Straightening of tilted 9Mtr PCC pole |
44 | Straightening of tilted 11Mtr PCC pole |
45 | Straightening of tilted 8Mtr ST pole |
46 | Straightening of tilted 9Mtr ST pole |
47 | Straightening of tilted 11Mtr ST pole |
48 | Straightening of tilted 13Mtr ST pole |
49 | Fixing of GI Barbed Wire for anti Climbing |
50 | Erection of Danger Plates with Clamps |
51 | Dismantlingof Danger Plates with Clamps |
52 | Erection of Anti Climbing Device with Clamps |
53 | Dismantling of Anti Climbing Device with Clamps |
54 | Painting of LT STPoles (8Mtr,9Mtr,11Mtr) andallied material( excluding cost of material) |
55 | Painting of HT STPoles (8Mtr,9Mtr,11Mtr) andallied material( excluding cost of material) |
56 | Painting of HT STPoles (13Mtr) andallied material( excluding cost of material) |
57 | Painting of Substation Poles andallied material( excluding cost of material) |
58 | Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor) |
59 | Unloading of Line Material |
60 | Loading of Line Material |
61 | Loading of ACSR conductors of all sizes(scrap/roll/drum) |
62 | Loading of HT/LT AB/XLPE Cables of all sizes( in scrap/roll/drum)of all sizes |
63 | Watch and Ward of Material |
64 | Punching/Making of Holes on M S Channel |
65 | Punching/Making of Holes on M S Angle Iron/Braces |
66 | Fabrication of Ms Steel i.e Channel , Angle Braces etc at site as requirements |
67 | Drilling holes in the iron piece |
68 | Fixing ofM S Channels 10/9/7/6 feet long |
69 | Fixing ofMS Channels 4.5/3 feet long |
70 | Fixing ofM S Angle Iron 10/9/7/6 feet long |
71 | Fixing ofMS Angle Iron 5/4.5/3 feet long |
72 | Dismantling ofM S Channels 10/9/7/6 feet long |
73 | Dismantling ofMS Channels 4.5/3 feet long |
74 | Dismantling ofM S Angle Iron 10/9/7/6 feet long |
75 | DismantlingofMS Angle Iron 5/4.5/3 feet long |
76 | Fixing of U-Clamps and Shackle Insulators |
77 | Dismantlingof U-Clamps and Shackle Insulators |
78 | Fixing/Installation of 11 KV Pin Insulators with Pins |
79 | Dismantling of 11 KV Pin Insulators with Pins |
80 | Fixing/Installation of Complete LT switchgear MCCBs(complete job) |
81 | Fixing/Installation of 11 KV Disc Insulators with fittings |
82 | Dismantling of 11KVDisc Insulators with fittings |
83 | Installation of Link/DO set |
84 | Installation of HG set |
85 | Dismantling of Link/DO Set |
86 | Dismantling of HG Set |
87 | Installationof GO Set(complete) |
88 | Dismantling of GO Set(complete) |
89 | Installation of LA Set(Station type) |
90 | Dismantlingof LA Set(Station type) |
91 | Installation of LASet(Line Type) |
92 | Dismantling of LASet(Line Type) |
93 | Unloading of CT/PT Unit |
94 | Average carriage of CT/PT Unit upto 100 Mtr |
95 | Average carriage of CT/PT for subseqent 100mtrs |
96 | Erection of CT/PT Unit along with Trivector Meter |
97 | Erection of CT/PT Unit |
98 | Dismantling of CT/PT Unit |
99 | Testing and commissioning of CT/PT Unit |
100 | Earthing of CT/PT Unit |
101 | Unloading of 25/63/100KVA Transformer |
102 | Unloading of 250/400/500/630 KVA Transformer |
103 | Construction of Cement Platform (8x8x6), 3feet below ground level & 3feet below ground level for Distribution transformer 400/500/630 KVA (Matrerial to be provided by contractor) |
104 | Average carriage of 25/63/100 KVA upto 100 Mtr |
105 | Average carriage of 25/63/100 KVA for subsequent 100 Mtr |
106 | Average carriage of 250/400/500/630 KVAupto 100 Mtr |
107 | Average carriage of 250/400/500/630for subsequent 100 Mtr |
108 | Mounting of 25/63/100 KVA Transformer |
109 | Mounting of 250/400/500/630KVA Transformer |
110 | Unmounting of 25/63/100KVA Transformer |
111 | Unmounting of 250/400/500/630KVA Transformer |
112 | Erection of HVDS 25KVA |
113 | Dismantling of HVDS 25KVA |
114 | Earthing of HVDS 25KVA |
115 | Fixing of Jumpers |
116 | Dismantling of Jumper |
117 | Earthing of poles for HT Line |
118 | Earthing of poles for LT Line |
119 | Earthing of Substation complete(Poles,Transformer,LA) per qty |
120 | Fixing of LT Circuit Component of Substation(LT cables,Thimbles, Busbar,Shackle insulators) with Fuse Set / MCCBwith Box |
121 | Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU"s for Outgoing Circuits |
122 | Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU"s for Outgoing Circuits |
123 | Fixing of LT Distribution Box for 400/ 500/630 KVA DTR with MCCB for incomer & SFU"s for Outgoing Circuits |
124 | Fabrication & fixing of LT Switch made of angle Iron 50x50x6 with LT busbar 50x6mmon bus bar insulator |
125 | Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit |
126 | Fabrication, Instalation, Testing and commissioning of LT fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps |
127 | Dismantling of LT Circuit Component of Substation (LT cables,Thimbles, Busbar,Shackle insulators) with Fuse Set / MCCBwith Box |
128 | Testing and commissioning of Substation |
129 | Laying/Stringing of ACSR Conductor 20/30mmsq/Squirel /Weasel |
130 | Dismantling of Old Squirell/Weasel ACSR Conductor |
131 | Laying/Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog |
132 | Dismantling of Old Dog/Rabbit ACSR Conductor |
133 | Tightening of loose conductor |
134 | Erection of Guys in HT/LT Line , with stay wire binding for eye bolt, Guy insulator & anchor rod and Back filling the stay pit |
135 | Dismantling of Guys in HT/LT Linewith stay wire binding for eye bolt, Guy insulator & anchor rod and Back filling the stay pit |
136 | Fixing of Suspension/Anchoring Clamps |
137 | Laying/Erection/Stringining of HT AB/XLPE Cable (25/35/50 mmsq) |
138 | Dismantling of HT AB/XLPE Cable 25/35/50 mmsq |
139 | Laying/Erection/Stringining of HT AB/XLPE Cable 70/95/120 mmsq |
140 | Dismantling of HT AB/XLPE Cable 70/95/120 mmsq |
141 | Laying/Erection/Stringining of HT AB/XLPE Cable 150/185mmsq |
142 | Dismantling of HT AB/XLPE Cable 150/185mmsq |
143 | Laying/Erection/Stringining of HT AB/XLPE Cable 240/300 mmsq |
144 | Dismantling of LT AB/XLPE Cable 240/300 mmsq |
145 | Laying/Erection/Stringining of LT AB/XLPE Cable 25/35/50 mmsq |
146 | Dismantling of LT AB/XLPE Cable 25/35/50 mmsq |
147 | Laying/Erection/Stringining ofLT AB/XLPE Cable 70/95/120 mmsq |
148 | Dismantling ofLT AB/XLPE Cable 70/95/120 mmsq |
149 | Laying/Erection/Stringining of LT AB/XLPE Cable 150/185mmsq |
150 | Dismantling of LT AB/XLPE Cable 150/185mmsq |
151 | Laying/Erection/Stringining of LT AB/XLPE Cable 240/300/400 mmsq |
152 | Dismantling of HT AB/XLPE Cable 240/300/400 mmsq |
153 | Laying of LT PVC Single Core Cable 95 mm sq for Dt"s |
154 | Laying of LT PVC Single Core Cable 185 mm sqfor Dt"s |
155 | Laying of LT PVC Single Core Cable 300 mm sqfor Dt"s |
156 | Laying of LT PVC Single Core Cable 400 mm sqfor Dt"s |
157 | Laying of LT PVC Single Core Cable 630 mm sq for Dt"s |
158 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines including jointing Kit ofsizes upto 95sqmm |
159 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines including jointing Kit ofsizes95sqmm to 185sqmm |
160 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofHT Lines including jointing Kit ofsizes above 185sqmm |
161 | Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables ofLT Lines of all sizes |
162 | Fixing of Mid SpanStraight Jointer Kit for AB/XLPE cables ofHT Lines of all sizes |
163 | Fixing of Mid SpanStraight Jointer Kit for AB/XLPE cables ofLT Lines of all sizes |
164 | Earthing of Cable |
165 | Fixing of IPC 120/50mm |
166 | Fixing of Single Phase Meters |
167 | Fixing of Three Phase Meters |
168 | Labour charges for erection of HT metering cubicle including all connections and earthing as per departmental standards. |
169 | Labour charges for erection of HT Trivector meter box including all connections and earthing as per departmental standards. |
170 | Labour charges for testing and repairing of meters and rigging and modification of CT Boxes. |
171 | Sealing of Meter bit, including inserting of wire |
172 | Winding of trip and close coils including material and without bobbin |
173 | Fixing of 3-Ph LT CT Meter at DTR (including transport) |
174 | Replacement of existing S-Ph meter with H.A meter (all types including infrared(IR) meter) including writing meter change slip and handing over to Section office including transporting from section office to location and back. |
175 | Replacement of existing 3-Ph meter with H.A meter (all types including infrared(IR) meter) including writing meter change slip and handing over to Section office including transporting from section office to location and back. |
176 | Erection of 11KV and 0.440KV CTs including earthing & Jumpering with GI/Copper wire |
177 | Erection of 11KV and 0.44KV CTs including earthing & Jumpering with GI/Copper/MS Flat Earthing |
178 | Labour charges for sealing of single phase/3 phase meters including transportation of meter box carton to work spot, unpacking, packing of sealed meters and stocking etc., complete. |
179 | Removing the meter back cover, cleaning the old meter cover, painting the meter top & bottom covers with good approved enamel black paint, cleaning the meter with petrol and oiling to bearings with good 2 in 1 oil (Usha make) refixing the meter in meter cover duly providing new gaskets. Testing and adjustments of the meter as per departmental standards, loading, transporting, and unloading including introducing sealing wire to each meter including replacement of glass wherever necessary. |
180 | Supply and rigging of meter with country wood of size 1’x1/2’, 7/20 finolex wire, bolts and nuts and screws along with lugs. Removing of metallic strip in syntex box, fixing of wooden board suitably, fixing of meter and CT in position including fixing of neutral terminal bolt. Providing of internal wiring duly giving proper connections, opening of internal link in the meter duly providing sealing after testing. (energy meter and box will be supplied by the deptt) |
181 | Labour charges for fixing of tube light fitting for street light |
182 | Dismantling of Single Phase Meters |
183 | Dismantling of Three Phase Meters |
184 | Laying& Erection of Service Wire Twin Core 4/6 mmsq |
185 | Laying & Erection of Service Wire Twin Core 10/16 mmsq |
186 | Dismantlingof Service Wire Twin Core 4/6 mmsq |
187 | Dismantling of Service Wire Twin Core 10/16 mmsq |
188 | Installation of 3 Phase 4 Wire Progidy Energy Meter |
189 | Dismantling of 3 Phase 4 Wire Progidy Energy Meter |
190 | Erection of DB/METER Box on PCC/ST Poles |
191 | Fixing of Guard netting of HT/LT Line |
192 | Dismantling/bundling of Guard netting of HT/LT Line |
193 | Fixing/Crimping of Thimbles/Lugs of size 25sqmm to 75sqmm |
194 | Fixing/Crimping of Thimbles/Lugs of size 75sqmm to 185sqmm |
195 | Fixing/Crimping of Thimbles of size 185sqmm above |
196 | Fixing of spacers for LT Line for 5 wires system |
197 | Fixing of spacers for LT Line for 4 wires system |
198 | Fixing of spacers for LT Line for 3/2 wires system |
199 | Installationof MS V- Cross arm |
200 | Installation/Erectionof MS Cross arm upto 3fts long |
201 | Installationof MSCross arm above 3fts to 6fts long |
202 | Installationof MS Cross arm above 6fts to 10fts long |
203 | Fixing/ Erection of Braces |
204 | Dismantling of Braces |
205 | Fixing of Top Clamp for Pin Insulator(HT)/PG clamp |
206 | Dismantling of Top Clamp for Pin Insulator(HT)/PG clamp |
207 | Fixing of U/D Clamp for LT insulator |
208 | Dismantling of U/D Clamp for LT insulator |
209 | Dismantling ofCross Arm upto 3ft long |
210 | Dismantling of Cross Arm above 3ft to 6fts long |
211 | Dismantling ofCross Arm above 6ft to 10fts long |
212 | Dismantling of V Cross Arm |
213 | Replacement/Refitting of HT Bush Rod at site |
214 | Replacement/Refitting of HT Bushing at site |
215 | Replacement/Refitting of LT Bush Rod at site |
216 | Replacement/Refitting of LT Bushing at site |
217 | Fixing of Bi- Metallic Clamps |
218 | Fixing of Aluminium Jointing Sleeve |
219 | Fixing of Wedge connectors/PG clamps |
220 | Stone Pad(300mmX300mmX75mm) |
221 | Topping of oil in DT at site |
222 | Carriage of Material for repair and maintenance work at site upto 100mtrs |
223 | Carriage of Material for repair and maintenance work at site for subsquent 100 Mtr |
224 | Providing code numbers to transformers / structures including cost of paint. |
225 | Charges of Crane / Hydra for loading and unloading works at site (like DT/HT/LT poles and other allied material on per hour basis) |
226 | Erection of Pipe Earthing using CI/GI pipes including pit excavation, backfilling, charcoal&salt/betonite powder and cement collar of 2" dia and 1" height etc complete |
227 | Erection of Spike Earthing as per IS Standards |
228 | Charging for Re- stringing of Loose Span |
229 | Erection ofStrut in DP structure |
230 | Dismantling ofStrut in DP structure |
231 | Fixing/unfasteningof Nuts/Bolts/Washers (Galvanized of sort) as per IS standards |
232 | Concreting of pole of pit of size 2"x2"x5" (0.6mx0.6mx1.5m) with C.C(1:4:8) using 40mm HBG metal. |
233 | Concreting of pole of pit of size 2"x2"x5" (0.6mx0.6mx1.5m) with C.C(1:3:6) using 20mm and 12mmHBG metal. |
234 | Concreting of stay pit of size 1"-6" x 1"-6" x 4"6" (0.45mx0.45x1.35m) with C.C. (1:4:8) using 40 mm and 20mm HBG metal |
235 | Concreting of stay pit of size 1" 6"x 1"-6" x 4" 6"(0.45mx0.45x1.35m) with C.C. (1:3:6) using 20 mm and 12mm HBG metal |
236 | Installation/Fixing of Street Light fixture |
237 | Dismantling/unFixing of Street Light fixture |
238 | Labour charges for Survey and pit marking of HT/LT lines in Plain area |
239 | Labour charges for Survey and pit marking of HT/LT lines in Hilly area |
240 | Excavation of pits in all soils, i.e, mixture of gravel and soft disintegrated rock like shales ordinary gravel, stony earth and earth mixed with fair sized boulders. |
241 | for 8mtr and 9 mtr STpoles |
242 | for 11mtr and 13 mtr STpoles |
243 | for 8mtr and 9 mtr PCC poles |
244 | for 11mtr and 13 mtr PCC poles |
245 | Supply and installation of Chain link security Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations with PCC(1:3:6)and chain link fencing meshof 8guage 50.8mm x 50.8mm(2"" x 2"") size, MS angle 50 x 50 x 6, MS flat 25 x 6 ft height, bolts,nutsAldrop, hinges, with access doora nd lockingfacility including Painting with one coatred oxide, 02 coats aluminum paint of approved brand and Manufacture to give an even shade.(Material will be provided by the Division) |
246 | Carriage ofDismantledMaterial from site upto 100mtrs for Write Back toDivisional Store |
247 | Carriage ofDismantledMaterial from site upto 100mtrs for Write Back toDivisional Store for subsequent 100mts carriage from site |
248 | Unloadingof write backMaterial/ other material for maintenance work |
249 | Loadingof write back Material at site for operation -Maintenance work |
250 | Hiring Charges of Tractor with Trolleyfor shifting of material (including POL and operation charges) |
251 | Hiring Charges of Mini Truck/Carrier for shifting of material (including POL and operation charges) |
252 | Labour charges for erection of LT Dist. Box including earthing as per departmental standards. |
253 | Erection of AB switches: 11 KV AB switch (400Amps) |
254 | Erection of 1-Ph 11KV AB Switch, Operating rod |
255 | AB Switch OFF & ON Base with Clamp |
256 | Earthing of DTR:Running of No 8 G.I wire from Distribution Transformer (3 Phase) AB Switch, HG Fuse Set V’X’ Arm etc running of 14 SWG G.I. Wire including double earthing as per specification for running of total 10 Nos GI wires. (Per Lead Per length) |
257 | General Tree/ Branchespruning/cutting per one day - Semi skilled labour |
258 | Earthing of DTR:Running of No 8 G.I wire from Distribution Transformer (3 Phase) AB Switch, HG Fuse Set V’X’ Arm etc running of 14 SWG G.I. Wire including double earthing as per specification for running of total 10 Nos GI wires. (Per Lead Per length) |
259 | Fixing of Bobin Insulator |