}

Tender For Full Deposit Related Mixed Works Under Edd, Atarra, Work Of Issuing Electricity Connections And Shifting Of Lines/Poles To Various Institutions And Others Through Jhatpat/Nivesh Mitra Portals Under University No., Atarra., banda-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Full Deposit Related Mixed Works Under Edd, Atarra, Work Of Issuing Electricity Connections And Shifting Of Lines/Poles To Various Institutions And Others Through Jhatpat/Nivesh Mitra Portals Under University No., Atarra.. Submission Date for this Tender is 06-05-2024. Pole Construction Tenders in banda Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43195990
Corrigendum : Tender For Full Deposit Related Mixed Works Under Edd, Atarra, Work Of Issuing Electricity Connections And Shifting Of Lines/Poles To Various Institutions And Others Through Jhatpat/Nivesh Mitra Portals Under University No., Atarra.
Open Tender
Indian
Uttar Pradesh
banda
06-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Full Deposit Related Mixed Works Under Edd, Atarra, Work Of Issuing Electricity Connections And Shifting Of Lines / Poles To Various Institutions And Others Through Jhatpat / Nivesh Mitra Portals Under University No., Atarra.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Apr-2024 Date Exten. Corr.3 Date 30-04-2024
2 30-Apr-2024 Date Extension Corrigendum1 Date 06-05-2024

Key Value

Document Fees
INR 1180 /-
EMD
INR 10000.0 /-
Tender Value
INR 9.80 Lakhs /-

Attachment

FileName File Description File Size
ac5c42c3-a239-4d88-b97d-b48a19853bf2.html Tender Notice 0 KB
BOQ_1593597.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Tender_Document_SED2324_1_1.rar Tender Document 0 KB

BOQ Items

Name of Work: fo0fo0[ka0] vrjkZ ds vUrxZr >ViV@fuos’k fe= iksVZyksa ds ek/;e ls fofHkUu laLFkkuksa o vU; esa fo|qr la;kstu fuxZr djus rFkk ykbuksa@iksyksa dh f’kf¶Vax djus dk dk;ZA
Sl. No. Item Description
1The following works under various places/Sub-Stations under FULL DEPOSIT SCHEME 2023-24/2024-25 under EDD, ATARRA, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. Some petty Material like top/dropper/t-off channel with clamps, cable boxes, nut-bolts & washers etc. of appropriate size & all concreting materials will be arranged by contractor at his own cost. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. Details of the work as given below ;-
2Erection of new and shifting of 33 KV/11 KV/LT Lines and 16/25/63/100 KVA Sub-Staions work - At various places in Jhatpat Portal/Nivesh Mitra Portal related new connections & utility shfting of payjal, STW, industrial, Primary School/Higher Secondary Schools, Gram Panchayat & Other etc.
3Safe cartage of PCC Pole 8.5 Mtr. Long from ESC to site of work.
4Safe cartage ofSTP Pole 11 Mtr. Long from ESC to site of work.
5Cartage of line Material Viz. Weasl/DOG conductor, GI Wire, Cross Arm, Earthing, ABC Cable, 11 KV XLPE Cable, 33 KV XLPE Cable, Stay etc.
6Erection of PCC Pole 8.5 Mtr. Longas single pole with fitting of all accessories HT/LT.
7Erection of STP Pole 11 Mtr. Long as single pole with fitting of all accessories HT/LT.
8Erection of Double/Section Double on 8.5 Mtr. PCC Pole/9/11 Mtr. STP Polewith fitting of all accessories HT/LT.
9Laying and sagging of ACSR of Weasl/Dog conductor with stringing, binding & jumpering, including with fixing of all material as per site requirement for 11 KV/33 KV Lines.
10Laying and sagging of ABC Cable, including with all material as per site requirement.
11Laying and sagging of XLPE Cable, including with all material as per site requirement.
12Supply & Fixing of cable jointing kit Indoor/Outdoor Type of 11 KV with fitting of all accessories as per RESSPO manual (Arranged by contractor at his own cost).
13Supply & Fixing of cable jointing kit Indoor/Outdoor Type of 33 KV with fitting of all accessories as per RESSPO manual (Arranged by contractor at his own cost).
14Safely cartage and installation of 16 KVA capacity transformers on single pole structure with loading and unloading on both sites in proper alignment as per direction of engineer incharge/RESSPO manual.
15Safely cartage and installation of 25 KVA capacity transformers on double pole structure with loading and unloading on both sites in proper alignment as per direction of engineer incharge/RESSPO manual.
16Safely cartage and installation of 63 KVA capacity transformers on double pole structure with loading and unloading on both sites in proper alignment as per direction of engineer incharge/RESSPO manual.
17Safely cartage and installation of 100 KVA capacity transformers on double pole structure/plinth with loading and unloading on both sites in proper alignment as per direction of engineer incharge/RESSPO manual.
18Erection, fixing & transportation of 11 KV CT/PT pole mounted unit 10/5 A with fitting of all accessories as per RESSPO manual.
19Fabrication of hole in channels/angles/steel cross arms.
20Guarding of 33 KV/11 KV/LT Lines at road/river crossing by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr.
21Erection of stay set complete at digging of pit including the cost of grouting with cement, sand and brick ballast/stone in ratio 1:4:8 as per RESSPO norms alongwith nozeling & binding of stay set, stay.
22Supply & erection of Nut-Bolts & washers of suitable size(Arranged by contractor at his own cost).
23Concreting/Grouting of newly erected single/double pole structure on 8.5/9/11/13 Mtr. PCC/ST poles as per direction of supervising engineer/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement, including the cost of labour, T&P and carrier etc. required for proper completion of work.
24Erection & fixing of Distribution Box on single pole including with ABC Cable.
25Fixing of earthing rod as per direction of supervising engineer/RESSPO manual, including the cost of labour, T&P etc. required for proper completion of work.
26Supply & Fixing of Top Channel with clamps & Nut-Bolts alongwith fitting of all accessories as per RESSPO manual (Arranged by contractor at his own cost).
27Supply & Fixing of Dropper Channel with clamps & Nut-Bolts alongwith fitting of all accessories as per RESSPO manual (Arranged by contractor at his own cost).
28Supply & Fixing of T-Off Channel with clamps & Nut-Bolts alongwith fitting of all accessories as per RESSPO manual (Arranged by contractor at his own cost).
29Shifting of 33 KV/11 KV/LT Lines with all fittings/utility, if required, as per direction of engineer incharge with dismantling of poles, material and conductor from 33 KV/11 KV/LT Lines and reuse as per material/site condition.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail